Vitreous LabsEnergy transparency

See every battery in Britain, and everything waiting to join them.

What each one is paid, who owns it, who trades it, and which of the 426 GW in the queue is likely to fail. Read from the published registers, twice a week.

A battery that runs todayCapacity waiting to connect

The haze shows the 243 GW of the queue at connection points with a known position. The other 182 GW is contracted at points with no published location, so it cannot be drawn. One operating site with no published position, 58 MW, is not drawn.

One real day

On Saturday 26 September the grid paid batteries to charge at lunchtime, then wanted power back at £199 by five.

The imbalance price each half hour, on the day with the widest swing of the seven to 30 September. Watch a four hour battery fill up while the price is below zero and empty in the evening.

The imbalance price is what energy was worth to the grid at the last minute, set by Elexon every half hour, per megawatt hour. The battery shows the timing only; its earnings are not a measured figure.

Two markets, read the same way

The same method in each country: the connection register, the operating fleet and what the fleet is paid, all from published files, rebuilt on every refresh.

Great Britain

Registers read twice a week since August 2026
Zeropermitted battery capacity left in all nineteen zones after the reform
266 GWof the queue traced to 76 named developers from Companies House filings

Italy

Read monthly from Terna since 29 September 2026
290 GWof storage asking to connect at transmission level, 3,460 applications
259 GWof that is stand-alone batteries, the rest paired with solar or wind, or pumped hydro
10.5 GWhas a final connection solution or a signed contract, the stage the new rule protects
Not yet measuredrunning fleet by site. Terna has been ordered to publish it; no date is set

Three products

The register is free because it traces to published files. The work we add sits behind a key.

The Fleet

Every operating battery: what it earns, who owns it, who trades it, and what it is doing right now, measured from settlement rather than modelled.

FreeGreat Britain

The Development Atlas

The connection queue on a map: what is contracted, what is likely to fail, where capacity comes back, and what changed since the last read. Who is really behind each project is the part we resolve ourselves.

FreeKeyGreat Britain · Italy

The Forecast

Tomorrow’s price, published each morning before the auction, and the long term view drawn from every public report so a page never shows nothing.

FreeGreat Britain

How it is kept honest

Every number traces to a published file or is labelled as inference. The three marks below appear on every map and every page.

MeasuredRead directly from a published register, settlement file or filing, with the date it was read.
InferredWorked out by us, for instance a coordinate derived from a substation name. Drawn differently and explained in the popup.
Not publishedLeft blank. Where the data does not exist in any published file, we say so instead of estimating.

How every number is worked out  ·  What you may do with each layer

The Friday ledger

Every Friday, every change in the queue since the last read: new requests, withdrawals, dates that moved, capacity that came back. One email, no commentary you did not ask for.

Confirm by email, unsubscribe from any issue. We store the address and nothing else.

Sign up for the ledger

The ledger covers Great Britain today and Italy from its first monthly read.

Read from the published registers ofNational Energy System OperatorElexonCapacity Market RegisterRenewable Energy Planning DatabaseCompanies HouseTerna