Vitreous LabsEnergy transparency

Thurrock Flexible

One physical site, registered with the market as 3 separate balancing units, 300 MW together in Essex and Kent. The market settles each unit on its own; this page adds them back up. Everything is read from published data for the 364 days to 28 August 2026.

The site

Registered power, all units300 MW
Balancing units3
Charging zoneEssex and Kent
Owned byTHURROCK FLEXIBLE GENERATION LIMITED
Traded byTHURROCK STORAGE LIMITED

What the site earned, all units together

Line364 days to 28 August 2026
Balancing mechanism, paid to discharge£15.2m
Balancing mechanism, paid out to charge−£5.3m
Response and reserve auctions£2.3m
Capacity market£1.4m
Three measured lines together£13.7m

Income per kilowatt across the whole site: £63.52/kW/yr on the three measured lines, before charging costs and before wholesale trading, which nobody publishes. Each unit's own page carries its estimate and its percentiles.

The units

UnitMWDischargeChargeStanding readyCM
T_THURB-1
THURROCK STORAGE LIMITED
100£6.4m−£2.0m£320k£1.4m
T_THURB-2
THURROCK STORAGE LIMITED
100£3.4m−£1.6m£1.2m
T_THURB-3
THURROCK STORAGE LIMITED
100£5.5m−£1.7m£787k

Grouped on evidence, not on a name: shared unit code stem THURB, all 3 units within 0.1 km. Portfolio families that share a code stem across distant sites, such as an aggregator's fleet, are never grouped. Methods

All batteries