Zenobe Blackhillock

One physical site, registered with the market as 4 separate balancing units, 209 MW together in North Scotland. The market settles each unit on its own; this page adds them back up. Everything is read from published data for the 364 days to 28 August 2026.

The site

Registered power, all units209 MW
Balancing units4
Charging zoneNorth Scotland
Owned byZENOBE BLACKHILLOCK LIMITED
Traded byZENOBE BLACKHILLOCK LIMITED

What the site earned, all units together

Line364 days to 28 August 2026
Balancing mechanism, paid to discharge£1.0m
Balancing mechanism, paid out to charge−£16.2m
Response and reserve auctions£785k
Capacity market£1.7m
Three measured lines togethernot netted

Income per kilowatt across the whole site: £16.53/kW/yr on the three measured lines, before charging costs and before wholesale trading, which nobody publishes. Each unit's own page carries its estimate and its percentiles.

The units

UnitMWDischargeChargeStanding readyCM
T_BLHLB-1
ZENOBE BLACKHILLOCK LIMITED
50£236k−£3.9m£212k
T_BLHLB-2
ZENOBE BLACKHILLOCK LIMITED
50£244k−£3.7m£294k£1.7m
T_BLHLB-3
ZENOBE BLACKHILLOCK LIMITED
54£252k−£4.8m£260k
T_BLHLB-4
ZENOBE BLACKHILLOCK LIMITED
54£273k−£3.8m£19k

Grouped on evidence, not on a name: shared unit code stem BLHLB, all 4 units within 0.1 km. Portfolio families that share a code stem across distant sites, such as an aggregator's fleet, are never grouped. Methods