The change ledger

What changed in the connection queue

NESO publishes the connection registers as a file that overwrites itself. We read it every Tuesday and Friday, keep every copy, and print the difference, project by project. Nothing here is inferred from the numbers; it is the register on one day against the register on the day before. The column headed "our reading" is ours, and it can be wrong.

4captures since 25 August 2026, the day the ledger began
85changes recorded, across 65 projects
627 MWgained a gate 2 flag, across 7 projects
42of the changes are the register respelling a name, not a change of hands

By week

WeekCapturesChangesProjectsInOutGate movesGate 2 gained, MWChanged handsDates moved
2026 week 352191100108102
2026 week 3626656001454604

By month

MonthCapturesChangesProjectsInOutGate movesGate 2 gained, MWChanged handsDates moved
August 20262191100108102
September 202626656001454604

Where this can be wrong

The ledger began on 25 August 2026. Nothing that happened before that day is here, and the first capture is a baseline rather than a report. A change of applicant is printed whether the register renamed a company or a different company took the position; the reading column separates the two by comparing the names with their punctuation and legal suffix removed, which is a rule and not a check against a filing. A change of connection point may be a move, a correction, or a project identifier reused for something else, and the register does not say which; Buccleuch Estates moving from the Scottish Borders to Suffolk in one capture is the standing example. A gate 2 flag that appears in one capture and vanishes in the next, as Pencloe did between 28 August and 4 September, is printed both times, because both readings are what NESO published. Where the register is wrong, this page is wrong with it, and it stays wrong until the register corrects itself. If you know better, tell us.

The queue tool is rebuilt from the latest capture with every deploy, so the applicant table, the gates and the dates on the map are the same rows this page reads. The same list by email, once a week, is being built; nothing has been sent yet.

4 September 2026

11 changes across 7 projects, 3 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
RWE GENERATION UK PLC
Pembroke 400kV Substation
gate02350gate up A firm connection right recorded where there was none.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
gate0250gate up A firm connection right recorded where there was none.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
gate2134gate down A gate 2 flag removed. Either the offer lapsed or the register corrected itself; the next capture usually says which.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
energised81.00.034energised Connected capacity changed, which is a battery arriving, or a phase of one.
RWE GENERATION UK PLC
Pembroke 400kV Substation
date2027-10-292029-03-07350date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
statusBuiltAwaiting Consents34stage The consent stage moved.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
siteKeith 2 GSPKeith 2 132/33kV GSP Substation50renamed The same connection point under a fuller name.
Scottish Hydro Electric Power Distribution Plc
Braco West GSP
siteBraco West 275/33kV GSP SubstationBraco West GSP0renamed The same connection point under a fuller name.
BUCCLEUCH ESTATES LTD (THE)
BORDERS SOLAR 132/33KV SUBSTATION
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)228spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES LTD (THE)
Dalkeith 400kV Substation
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)200spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES LTD (THE)
Drinkstone Hybrid 132/33kV substation
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)55spelling Same company, the register changed its spelling or punctuation. Not a change of hands.

1 September 2026

55 changes across 50 projects, 39 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
SOUTH GRANTHAM ENERGY CENTRE LIMITED
Trent Valley South Connection Node C 400kV Substation
gate01810gate Gate 1 recorded, a place in the process rather than a firm right.
Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
HP Trotter t/a Printonan Farm
Kaimes GSP
gate0151gate Gate 1 recorded, a place in the process rather than a firm right.
SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
gate0250gate up A firm connection right recorded where there was none.
LAWMOOR DEVELOPMENTS ENERGY STORAGE LIMITED
St. Andrews Cross GSP
gate0150gate Gate 1 recorded, a place in the process rather than a firm right.
Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
gate0250gate up A firm connection right recorded where there was none.
Vital Energi Solutions Limited
Carntyne 132/33kV
gate0150gate Gate 1 recorded, a place in the process rather than a firm right.
Craig Nab Wind Energy Hub Limited
Ladyburn 132kV Substation
gate0136gate Gate 1 recorded, a place in the process rather than a firm right.
Toftingall Wind Limited
Mybster 1 GSP
gate0225gate up A firm connection right recorded where there was none.
KINCRAIG ENERGY CENTRE LIMITED
Dyce 132/33kV GSP
gate0221gate up A firm connection right recorded where there was none.
SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
date2026-06-302026-12-3150date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
date2027-10-312028-10-3150date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
Toftingall Wind Limited
Mybster 1 GSP
date2025-08-312026-09-3025date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
SOUTH GRANTHAM ENERGY CENTRE LIMITED
Trent Valley South Connection Node C 400kV Substation
siteGrantham 400KVTrent Valley South Connection Node C 400kV Substation810point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
SP DISTRIBUTION PLC
Leven 132/33kV Substation
siteLeven GSPLeven 132/33kV Substation20renamed The same connection point under a fuller name.
RWE GENERATION UK PLC
Didcot 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC1,475spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Eaton Socon 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC740spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Pembroke 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC350spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Butlers Wood 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED330spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Necton 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node D 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node A 275kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Sussex and Romney Connection Node A 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node B 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
North Anglia Connection Node E 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
New Deer 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED200spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Norton East 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED150spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Didcot 132kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC150spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Newarthill 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC50spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Giffnock 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC45spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Erskine 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Drumcross 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Drumcross 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Coatbridge 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dunfermline 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Coylton 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dalmarnock GSP
ownerSP Distribution plcSP DISTRIBUTION PLC29spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Newarthill 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC29spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC25spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC23spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Kilwinning GSP
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Broxburn 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Devol Moor 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Leven 132/33kV Substation
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 275/132kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dumfries 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC16spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Redhouse GSP
ownerSP Distribution plcSP DISTRIBUTION PLC16spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Cupar GSP
ownerSP Distribution plcSP DISTRIBUTION PLC12spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dumfries 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC10spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Easterhouse 275/33kV Substation
ownerSP Distribution plcSP DISTRIBUTION PLC10spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Livingston East 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC6spelling Same company, the register changed its spelling or punctuation. Not a change of hands.

28 August 2026

19 changes across 11 projects, 0 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
BOTLEY GREEN ENERGY CENTRE LTD
Botley 400kV Substation
gate01800gate Gate 1 recorded, a place in the process rather than a firm right.
Field High Marnham Ltd
Trent Valley South Connection Node G 400kV Substation
gate01400gate Gate 1 recorded, a place in the process rather than a firm right.
Field Spittal Ltd
Spittal 132kV Substation
gate01300gate Gate 1 recorded, a place in the process rather than a firm right.
GALILEO 09 LIMITED
MID WALES CONNECTION NODE A 400KV SUBSTATION
gate01297gate Gate 1 recorded, a place in the process rather than a firm right.
HARKER ENERGY PARK LIMITED
Harker 400kV Substation
gate01250gate Gate 1 recorded, a place in the process rather than a firm right.
EPPING ENERGY PARK LIMITED
Waltham Cross B 400kV Substation
gate01250gate Gate 1 recorded, a place in the process rather than a firm right.
RENEWCO POWER LIMITED
LESSNESSOCK ENERGY PARK 132KV SUBSTATION
gate01114gate Gate 1 recorded, a place in the process rather than a firm right.
PERIGUS ENERGY UK LIMITED
Seat Hill 132kV Substation
gate0190gate Gate 1 recorded, a place in the process rather than a firm right.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
gate0281gate up A firm connection right recorded where there was none.
BUCCLEUCH ESTATES, LTD. (THE)
Drinkstone Hybrid 132/33kV substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
energised0.081.081energised Connected capacity changed, which is a battery arriving, or a phase of one.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
mw119.034.081capacity Contracted capacity changed. Downwards is usually a phase being split out; upwards is an amended application.
SWANSEA NORTH GREEN NG LIMITED
Swansea North 400kV Substation
date2028-10-312028-10-301,025date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
date2026-04-242028-04-0181date The contracted connection date moved. Later is slippage measured from our own captures, which nobody else publishes.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
statusConsents ApprovedBuilt81stage The consent stage moved.
Field Spittal Ltd
Spittal 132kV Substation
siteSpittal 275kV SubstationSpittal 132kV Substation300renamed The same connection point under a fuller name.
GALILEO 09 LIMITED
MID WALES CONNECTION NODE A 400KV SUBSTATION
siteOswestry SubstationMID WALES CONNECTION NODE A 400KV SUBSTATION297point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
RENEWCO POWER LIMITED
LESSNESSOCK ENERGY PARK 132KV SUBSTATION
siteLessnessockLESSNESSOCK ENERGY PARK 132KV SUBSTATION114renamed The same connection point under a fuller name.
BUCCLEUCH ESTATES, LTD. (THE)
Drinkstone Hybrid 132/33kV substation
siteHawick 132kV SubstationDrinkstone Hybrid 132/33kV substation55point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.

25 August 2026

0 changes across 0 projects, 0 of them spelling only. 1,563 projects in the register, 426.7 GW contracted.

Nothing moved.