30 MW, about 45 MWh (1.5 hours, from the capacity market de-rating class) in Eastern Grampian and Tayside. Everything on this page is read from published data for the 364 days to 11 November 2026, or is labelled as an estimate.

Part of Jamesfield, one of 2 balancing units at one site totalling 49 MW. This page is the E_JAMBB-1 unit alone.

What it is

Registered power30 MW balancing mechanism registration
Storage duration1.5 hours capacity market de-rating class
Charging zoneEastern Grampian and Tayside
Connection sitePerth and Kinross
PostcodeKY14 6EW
Balancing mechanism unitE_JAMBB-1

Who owns it and who trades it

Traded byTesla Motors Limitedruns several sitesconfirmed, Elexon's register
Owned byHARMONY JF LIMITED
Owner established fromcapacity market registered holder
UltimatelyTagEnergy confirmed source

How we know. The control filing on each names Tagenergy Uk Limited holding more than half the shares with the right to appoint and remove directors, since 22 October 2021. Harmony Energy holds the rest and developed the sites.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

What it earned

Line364 days to 11 November 2026
Balancing mechanism−£1.8m
Response and reserve auctions auction implied£255k
Capacity market£561k
Three lines togethernot netted

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its frequency response delivery, and its losses, together. This unit held a frequency response contract in 9,402 of those half hours. The energy the contract asked of it, contracted megawatts times NESO's published delivery curve at the measured grid frequency, is taken out of the position and valued at the imbalance price, because it sits outside the unit's declared position and that is the price Elexon settles it at. What remains is the traded position, valued at the market index. In 13 half hours a contract was held but the grid frequency is not yet held, so those are left in the traded position. The volumes are measured. The prices are public benchmarks, not this unit's trades. The product is derived, and is shown apart from the three measured lines above. 358 days to 5 November 2026, 42 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out19,651 MWh
Metered import, what crossed the meter in22,485 MWh
Equivalent full cycles, everything sent out over one full charge437 over 358 days, 445 a year at that rate
Apparent meter to meter efficiency87%, an ordinary battery: round trip losses alone
Balancing offers accepted2,209 MWh
Balancing bids accepted27,551 MWh
Position outside balancing, export34,643 MWh
Position outside balancing, import12,136 MWh
Of which expected response delivery, net−5,075 MWh 1,791 out, 6,866 in
Traded position, net27,582 MWh 36,228 out, 8,646 in
Traded position at the market index, sold£4.4m
Traded position at the market index, bought£667k
Traded position, net, at the index£3.8m
Response delivery, net, at the imbalance price−£650k −£621k at the index
Balancing and outside balancing together£1.4m £47.18/kW/yr

This battery connects to a distribution network. For such a unit the volumes Elexon publishes are settlement volumes: the site's own meter multiplied by the network operator's line loss factor for that half hour. The factor is usually within a few per cent of one, so the megawatt hours, cycles and efficiency above can sit a little above or below what crossed the site's meter. The money is settled on the same adjusted volumes. Method and caveats

When it moved, against when power was dear

Across every half hour this unit was metered the market index averaged £104.66. What it sent out was worth £122.37 a megawatt hour at that same index, 1.17 times the average. What it took in was worth £77.13, 0.74 times. Selling above one and buying below one is a unit positioned into the dear half hours and out of the cheap ones. It measures the half hours it chose, not the price anyone paid it, which is not published.

What it paid to buy energy back

When NESO accepts a bid, this unit delivers less than it had already sold, or takes more in. It pays for the energy it no longer delivers, and that payment is most of what makes the balancing figure above negative. Whether that is a cost or a margin depends on the price it paid. Across 27,551 MWh of accepted bids it paid an average of £72.07 a megawatt hour. The market index averaged £113.53 across those same half hours, so it bought back at £41.46 a megawatt hour below the going price.

Price it paidVolumeAverageCash
below zero2,136 MWh−£24.36£52k received
£0 to £251,659 MWh£14.40£24k
£25 to £503,742 MWh£38.64£145k
£50 to £756,594 MWh£63.80£421k
£75 to £1006,668 MWh£86.83£579k
above £1006,751 MWh£128.79£869k

On 2,136 MWh the price was below zero: NESO paid this unit an average of £24.36 a megawatt hour to take energy, £52k in all. That is a constrained network with more generation on it than it can move.

The other direction, offers, is much smaller here: 2,209 MWh where NESO asked for more, paid at an average of £116.61 against an index of £96.71.

Physical checks passed: the meter never exceeded the registered power by more than fifteen per cent, and the year's exports against imports are what a battery does.

Where it stands

Balancing incomewhole fleet, £/kW/yr23rd percentile103 units
Balancing incomeScotland peer group33rd percentile28 units
Balancing income1.5 hour duration cohort14th percentile74 units
Balancing incomebatteries sold by Tesla Motors Limited1st percentile15 units
All three measured lineswhole fleet, £/kW/yr50th percentile234 units
Energy sent outhours at full power38th percentile101 units
Energy taken inhours at full power95th percentile101 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in Scotland, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Dunsinane441h£51.2/kW/yr
Byers Brae (EDF01N)281h£35.2/kW/yr
South Redhouse161h£28.6/kW/yr
Shilton Lane BESS402h£2.3/kW/yr
Erskine BESS302h£1.6/kW/yr
Jamesfield 1 Battery Storagethis battery301.5hnot netted

The three lines are not added together for this site. It paid £2.0m to charge and the lines we can measure paid it £1.1m. The energy it bought was sold in the wholesale market and nothing published measures that sale, so subtracting one from the other would show a loss it does not make. Sites in this position are usually constraint assets, paid to absorb wind the network cannot move south.

In its distribution register

The distribution register of Scottish and Southern Electricity Networks lists this site as JAMESFIELD FARM BATTERY STORAGE 1, 32 MW, connected on 31 January 2024. Matched on a site word in common, 0 km apart.

See it on the Development Atlas

From each operator’s embedded capacity register, read every Monday. How the registers are linked to the units that trade.

See it on the map

Open the operating map here