Vitreous LabsEnergy transparency
The change ledger

2,283 MW gained a firm gate 2 position since 25 August 2026

NESO publishes the connection registers as a file that overwrites itself. We read it every Tuesday and Friday, keep every copy, and print the difference, project by project. Nothing here is inferred from the numbers; it is the register on one day against the register on the day before. The column headed "our reading" is ours, and it can be wrong.

12captures since 25 August 2026, the day the ledger began
195changes that moved something, across 146 projects
2,283 MWgained a gate 2 flag, across 18 projects
59more were the register respelling a company or a connection point, which moves nothing

By week

WeekCapturesChangesSpelling onlyProjectsInOutGate movesGate 2 gained, MWChanged handsDates moved
Week 35, 2026219·1100108102
Week 36, 20262664256001454604
Week 37, 2026333172801663404
Week 38, 2026213·1120518910
Week 39, 20262121·107201783409
Week 40, 202612·2010·00

By month

MonthCapturesChangesSpelling onlyProjectsInOutGate movesGate 2 gained, MWChanged handsDates moved
August 2026219·1100108102
September 2026102355918942422,202117

Where this can be wrong

The ledger began on 25 August 2026. Nothing that happened before that day is here, and the first capture is a baseline rather than a report. A change of applicant is printed whether the register renamed a company or a different company took the position; the reading column separates the two by comparing the names with their punctuation and legal suffix removed, which is a rule and not a check against a filing. A change of connection point is read the same way, word by word: the words that say what kind of thing a point is and its voltage are set aside, and what is left decides between a respelling, a fuller or shorter name for the same point, a different voltage at the same site, different equipment at the same site (a converter station and a grid supply point are not one thing) and a different point; that is a rule, not a check against a map. A different point may be a move, a correction, or a project identifier reused for something else, and the register does not say which; Buccleuch Estates moving from the Scottish Borders to Suffolk in one capture is the standing example. A capacity, a date or a stage is read in its direction and against the other rows of the same project on the same day: a date moving on the day a gate 2 flag arrives is the offer's date rather than slippage, and connected capacity falling to nothing on the day a stage moves backwards is a correction. A gate 2 flag that appears in one capture and vanishes in the next, as Pencloe did between 28 August and 4 September, is printed both times, because both readings are what NESO published. Where the register is wrong, this page is wrong with it, and it stays wrong until the register corrects itself. If you know better, tell us.

The queue tool is rebuilt from the latest capture with every deploy, so the applicant table, the gates and the dates on the map are the same rows this page reads. The same list goes out by email on Fridays.

29 September 2026

2 changes across 2 projects, 0 of them spelling only. 1,565 projects in the register, 426.1 GW contracted.

ProjectWhat changedFromToMWOur reading
JEPIPHANY LIMITED
Melksham 400kV Substation
exited··90left The row is gone from the register. Terminated, withdrawn or merged into another; the register does not say.
Scottish Hydro Electric Power Distribution Plc
Redmoss GSP
siteRedmoss 132/33kV GSP SubstationRedmoss GSP8renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one.

25 September 2026

17 changes across 13 projects, 0 of them spelling only. 1,566 projects in the register, 426.1 GW contracted.

ProjectWhat changedFromToMWOur reading
CARE POWER (WOLVERHAMPTON) LIMITED
Penn GSP
entered··50entered A new row in the register.
CARE POWER (NORTH TAWTON) LIMITED
Alverdiscott GSP
entered··30entered A new row in the register.
ECODEV GROUP LTD
Pembroke 400kV Substation
gate01240gate Gate 1 recorded, a place in the process rather than a firm right.
SIRIUSECODEV (GASTARD) LTD
Melksham B 132KV Substation
gate01200gate Gate 1 recorded, a place in the process rather than a firm right.
BENTHEAD SOLAR LIMITED
Kilwinning 132/33kV
gate0263gate up A firm connection right recorded where there was none.
Advance Grid Solutions Limited
Coatbridge GSP
gate0160gate Gate 1 recorded, a place in the process rather than a firm right.
BSR APPLICATIONS LIMITED
Strichen 132/33kV GSP Substation
gate0160gate Gate 1 recorded, a place in the process rather than a firm right.
Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
gate0150gate Gate 1 recorded, a place in the process rather than a firm right.
Bluestone Energy Ltd
DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION
gate0149gate Gate 1 recorded, a place in the process rather than a firm right.
HD144WHI LTD
Whitegate 275kV Substation
energised0.057.057energised Connected capacity recorded where there was none: a battery arriving, or a phase of one.
HD144WHI LTD
Whitegate 275kV Substation
mw57.00.057capacity down Contracted capacity cut. Usually a phase split into its own row, or a smaller offer accepted.
BROCKWELL STORAGE & SOLAR LIMITED
Willington 400kV Substation
date2028-03-302028-10-31500slipped The contracted connection date moved later by 7 months. Slippage measured from our own captures, which nobody else publishes.
Sunshine Project 03 Limited
Devol Moor 400/132kV
date2029-10-172027-09-27400brought forward The contracted connection date moved earlier by 2 years and 1 month. Rare; an accelerated offer, or a correction.
HD144WHI LTD
Whitegate 275kV Substation
date2024-06-30·57date The contracted connection date moved.
BENTHEAD SOLAR LIMITED
Kilwinning 132/33kV
statusScopingConsents Approved63stage Consent recorded as granted.
HD144WHI LTD
Whitegate 275kV Substation
statusConsents ApprovedBuilt57built Recorded as built; the register's word rather than a meter reading. Connected capacity arrived on the same day.
Macduff Battery Storage Ltd
MacDuff 132/33kV GSP Substation
statusAwaiting ConsentsConsents Approved50stage Consent recorded as granted.

22 September 2026

104 changes across 95 projects, 0 of them spelling only. 1,564 projects in the register, 426.2 GW contracted.

ProjectWhat changedFromToMWOur reading
Braintree 10 Renewables Limited
Braintree 400kV Substation
gate011,000gate Gate 1 recorded, a place in the process rather than a firm right.
CULHAM STORAGE LIMITED
Culham Jet 400kV Substation
gate02500gate up A firm connection right recorded where there was none.
EPL NEWCO6 LIMITED
Wakeleys 400kV
gate01480gate Gate 1 recorded, a place in the process rather than a firm right.
ENSO GREEN HOLDINGS X LIMITED
Feckenham 400kV Substation
gate01400gate Gate 1 recorded, a place in the process rather than a firm right.
Sunshine Project 03 Limited
Devol Moor 400/132kV
gate01400gate Gate 1 recorded, a place in the process rather than a firm right.
SSE FIDDLERS FERRY BATTERY LIMITED
Fiddlers Ferry 275kV Substation
gate02150gate up A firm connection right recorded where there was none.
BERWICK RENEWABLES TX LIMITED
Berwick 132/33kV
gate01100gate Gate 1 recorded, a place in the process rather than a firm right.
LISTER BATTERY LTD
Lister Drive 275kV Substation
gate0257gate up A firm connection right recorded where there was none.
IQ ENERGY CENTRE LIMITED
Indian Queens 400kV Substation
gate0248gate up A firm connection right recorded where there was none.
SIRIUS ECODEV (KEITHICK) LTD
Coupar Angus 132/33kV GSP
gate0216gate up A firm connection right recorded where there was none.
DIDCOT BATTERY LIMITED
DIDCOT 400/132KV SUBSTATION
date2027-03-302027-03-31100date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan.
Priory Generation Limited
Wymondley 400kV Substation
date2025-10-312027-05-3057slipped The contracted connection date moved later by a year and 7 months. Slippage measured from our own captures, which nobody else publishes.
AGR SOLAR 4 LIMITED
Wymondley 400/33kV Substation
date2025-10-312027-05-3050slipped The contracted connection date moved later by a year and 7 months. Slippage measured from our own captures, which nobody else publishes.
Persley Croft BESS Ltd
Persley 132/33kV GSP Substation
date2026-07-312026-07-3050date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
date2028-10-312026-10-3150brought forward The contracted connection date moved earlier by 2 years. Rare; an accelerated offer, or a correction.
SIRIUS ECODEV (KEITHICK) LTD
Coupar Angus 132/33kV GSP
date2026-06-302026-12-3116slipped The contracted connection date moved later by 6 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
THORPE MARSH GREEN ENERGY HUB LIMITED
Thorpe Marsh 400kV Substation
statusConsents ApprovedUnder Construction/Commissioning1,400stage Construction or commissioning recorded.
FIDDLERS FERRY LTD
Fiddlers Ferry 275kV Substation
statusScopingConsents Approved900stage Consent recorded as granted.
CONNECTID 3 LIMITED
North Anglia Connection Node C 400kV Substation
statusScopingAwaiting Consents800stage Out of scoping and into the consent process.
ONE EARTH SOLAR FARM LIMITED
High Marnham 400kV Substation
statusScopingAwaiting Consents740stage Out of scoping and into the consent process.
CONNECTID 1 LIMITED
West Anglia Connection Node F 400kV Substation
statusScopingAwaiting Consents700stage Out of scoping and into the consent process.
Statkraft UK Ltd
Neilston 400kV Substation
statusAwaiting ConsentsConsents Approved600stage Consent recorded as granted.
CONNECTID 2 LIMITED
North Anglia Connection Node E 400kV Substation
statusScopingAwaiting Consents520stage Out of scoping and into the consent process.
MAS 002 LIMITED
Bradford West 275kV Substation
statusScopingConsents Approved500stage Consent recorded as granted.
LIME DOWN SOLAR PARK LIMITED
Melksham 400kV Substation
statusScopingAwaiting Consents500stage Out of scoping and into the consent process.
ALCEMI STORAGE DEVELOPMENTS 3 LIMITED
Devilla Battery Storage 275kV substation
statusScopingConsents Approved500stage Consent recorded as granted.
Eccles Energy Centre Limited
Eccles 400kV Substation
statusScopingUnder Construction/Commissioning500stage Construction or commissioning recorded.
ALCEMI STORAGE DEVELOPMENTS 6 LIMITED
Coalburn 400kV GIS Substation
statusScopingConsents Approved500stage Consent recorded as granted.
TAGENERGY DEVELOPMENT UK LIMITED
Drakelow 400kV Substation
statusScopingConsents Approved500stage Consent recorded as granted.
Kilmarnock Energy Centre Limited
Kilmarnock South 400kV Substation
statusScopingConsents Approved500stage Consent recorded as granted.
CARLTON POWER LIMITED
Strathaven 400/275kV
statusScopingAwaiting Consents500stage Out of scoping and into the consent process.
CULHAM STORAGE LIMITED
Culham Jet 400kV Substation
statusScopingConsents Approved500stage Consent recorded as granted.
SSE STAYTHORPE POWER LIMITED
Staythorpe 400kV Substation
statusAwaiting ConsentsConsents Approved437stage Consent recorded as granted.
ZENOBE ECCLES LIMITED
Eccles 400kV Substation
statusScopingUnder Construction/Commissioning400stage Construction or commissioning recorded.
Kilmarnock Flexpower Ltd
Boydston 400kV substation
statusConsents ApprovedUnder Construction/Commissioning350stage Construction or commissioning recorded.
RWE GENERATION UK PLC
Pembroke 400kV Substation
statusAwaiting ConsentsConsents Approved350stage Consent recorded as granted.
Carrog Storage Facility Limited
Wylfa 400kV Substation
statusAwaiting ConsentsConsents Approved300stage Consent recorded as granted.
Dalzell (Newarthill) Ltd
Newarthill Energy Park 275kV Substation
statusConsents ApprovedScoping300stage back The consent stage moved backwards. A consent lapsed or was refused, or the register corrected an earlier entry; the ledger cannot tell which.
COCKENZIE STORAGE LIMITED
Meadowmill 400/132kV Substation
statusScopingUnder Construction/Commissioning240stage Construction or commissioning recorded.
HUNTERSTON GRID 1 LTD
Ayrshire Grid 400kV Substation
statusScopingConsents Approved200stage Consent recorded as granted.
KINCARDINE GRID 1 LTD
Fife Grid Services Facility 275kV Substation
statusScopingConsents Approved200stage Consent recorded as granted.
KINCARDINE GRID 1 LTD
Fife Grid Services Facility 275kV Substation
statusScopingConsents Approved200stage Consent recorded as granted.
Whitehill Battery Storage Ltd
Easterhouse 275kV
statusAwaiting ConsentsConsents Approved200stage Consent recorded as granted.
HUNTERSTON GRID 1 LTD
Hunterston East 400kV substation
statusScopingConsents Approved200stage Consent recorded as granted.
BERKSWELL BATTERY STORAGE LIMITED
Berkswell 275kV Substation
statusConsents ApprovedUnder Construction/Commissioning200stage Construction or commissioning recorded.
Zenobe Coalburn Limited
Coalburn North 400kV Substation
statusScopingConsents Approved200stage Consent recorded as granted.
BUCCLEUCH ESTATES, LTD. (THE)
Dalkeith 400kV Substation
statusScopingAwaiting Consents200stage Out of scoping and into the consent process.
ENSO GREEN HOLDINGS D LIMITED
Drax 132kV Substation
statusScopingAwaiting Consents190stage Out of scoping and into the consent process.
DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
statusConsents ApprovedBuilt189built Recorded as built; the register's word rather than a meter reading.
VOLTALIA UK LTD
Bowsheils 132kV Substation
statusScopingAwaiting Consents167stage Out of scoping and into the consent process.
S4N SPITTAL LTD
Spittal 132kV Substation
statusScopingAwaiting Consents162stage Out of scoping and into the consent process.
SSE FIDDLERS FERRY BATTERY LIMITED
Fiddlers Ferry 275kV Substation
statusScopingConsents Approved150stage Consent recorded as granted.
Rosside Energy Limited
Blackhillock 275kV Substation
statusScopingAwaiting Consents150stage Out of scoping and into the consent process.
Drax BESS Neilston Limited
Glennifer Road BESS 132kV substation
statusScopingConsents Approved150stage Consent recorded as granted.
ENSO GREEN HOLDINGS A LIMITED
West Burton 132kV Substation
statusScopingUnder Construction/Commissioning120stage Construction or commissioning recorded.
NEWLANDS HILL WIND ENERGY HUB LIMITED
Newlands Hill 132/33kV
statusScopingAwaiting Consents119stage Out of scoping and into the consent process.
COCKENZIE STORAGE B LTD
Meadowmill 400/132kV Substation
statusScopingUnder Construction/Commissioning102stage Construction or commissioning recorded.
Flemyland Battery Storage Limited
Kilwinning 132/33kV
statusScopingConsents Approved100stage Consent recorded as granted.
LAIRDMANNOCH ENERGY PARK LIMITED
Lairdmannoch Energy Park 132kV substation
statusScopingAwaiting Consents100stage Out of scoping and into the consent process.
Rashley New Energy Limited
Saltcoats 132/33kV
statusScopingAwaiting Consents100stage Out of scoping and into the consent process.
Brunt Hill Limited
Westfield 132/33kV
statusScopingAwaiting Consents99stage Out of scoping and into the consent process.
ALUDRA BESS LTD
Drakelow 132kV Substation
statusScopingConsents Approved90stage Consent recorded as granted.
Don Cossack Ltd
Tynemouth 275kV Substation
statusScopingAwaiting Consents70stage Out of scoping and into the consent process.
LEL BILBO SOLAR LIMITED
Strichen 132/33kV GSP Substation
statusScopingUnder Construction/Commissioning67stage Construction or commissioning recorded.
BSSL EAST LOTHIAN 1 LTD
Cockenzie 275/33kV Substation
statusScopingConsents Approved63stage Consent recorded as granted.
BROCKWELL STORAGE & SOLAR LIMITED
Kilmarnock Town 275/33kV Substation
statusScopingConsents Approved60stage Consent recorded as granted.
ENSO GREEN HOLDINGS L LIMITED
Canterbury North 400kV Substation
statusScopingAwaiting Consents57stage Out of scoping and into the consent process.
BRAMLEY BESS LIMITED
Bramley 400kV Substation
statusConsents ApprovedUnder Construction/Commissioning57stage Construction or commissioning recorded.
BRAMLEY SOLAR LIMITED
Bramley 400kV Substation
statusScopingUnder Construction/Commissioning57stage Construction or commissioning recorded.
Rochdale (BES) Ltd
Rochdale 275kV Substation
statusScopingConsents Approved57stage Consent recorded as granted.
PENWORTHAM (BES) LTD
Penwortham 400kV Substation
statusScopingConsents Approved57stage Consent recorded as granted.
LISTER BATTERY LTD
Lister Drive 275kV Substation
statusScopingConsents Approved57stage Consent recorded as granted.
E Power Limited
Dunlaw Extension 132/33kV
statusScopingAwaiting Consents53stage Out of scoping and into the consent process.
SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
statusConsents ApprovedUnder Construction/Commissioning50stage Construction or commissioning recorded.
ROTHIENORMAN FLEXPOWER LTD
Rothienorman 400/33kV Substation
statusScopingConsents Approved50stage Consent recorded as granted.
Persley Croft BESS Ltd
Persley 132/33kV GSP Substation
statusScopingUnder Construction/Commissioning50stage Construction or commissioning recorded.
Dyce Battery Storage Limited
Dyce 132/33kV GSP
statusScopingConsents Approved50stage Consent recorded as granted.
BRACO ENERGY STORAGE LIMITED
Braco West 275/33kV GSP Substation
statusScopingConsents Approved50stage Consent recorded as granted.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
statusScopingConsents Approved50stage Consent recorded as granted.
BALNACRAIG BATTERY STORAGE LIMITED
Alness 132/33kV Substation
statusScopingConsents Approved50stage Consent recorded as granted.
Gas Generation Property Limited
Elderslie 132/33kV
statusScopingConsents Approved50stage Consent recorded as granted.
CHECKERS ENERGY LIMITED
Govan 132/33kV
statusScopingConsents Approved50stage Consent recorded as granted.
Field Holmston Ltd
Ayr 275/33kV
statusScopingUnder Construction/Commissioning50stage Construction or commissioning recorded.
Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
statusScopingConsents Approved50stage Consent recorded as granted.
LG-B-50a Limited
Beauly 132/33 kV GSP Substation
statusScopingConsents Approved50stage Consent recorded as granted.
POTENCIA ENERGY LIMITED
Mybster 3 132/33kV Substation
statusScopingAwaiting Consents47stage Out of scoping and into the consent process.
PERWINNES SOLAR AND BATTERY STORAGE LIMITED
Dyce 132/33kV GSP
statusScopingConsents Approved45stage Consent recorded as granted.
FALKIRK POWER LTD
Bainsford 132/33kV
statusConsents ApprovedUnder Construction/Commissioning43stage Construction or commissioning recorded.
DALMARNOCK BESS LTD
DALMARNOCK 132/33KV SUBSTATION
statusScopingUnder Construction/Commissioning40stage Construction or commissioning recorded.
EKU ENERGY FAUNE PROJECTS (UK) LIMITED
Helensburgh 132/33kV
statusScopingConsents Approved40stage Consent recorded as granted.
Field Keith Ltd
Keith 1 132/33kV GSP Substation
statusScopingConsents Approved39stage Consent recorded as granted.
Worcestershire Solar 1 Limited
Hartmoor 275kV Substation
statusConsents ApprovedUnder Construction/Commissioning38stage Construction or commissioning recorded.
GRUPOTEC SOLAR UK 5 LIMITED
Tongland 132/11kV
statusScopingConsents Approved36stage Consent recorded as granted.
AGR RENEWABLES LIMITED
Wymondley 400kV Substation
statusScopingAwaiting Consents36stage Out of scoping and into the consent process.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
statusAwaiting ConsentsConsents Approved34stage Consent recorded as granted.
ELVANFOOT ENERGY STORAGE LIMITED
Elvanfoot 400/275/33kV
statusScopingConsents Approved10stage Consent recorded as granted.
BUK23 LIMITED
Whitelaw Brae BESS 33kV substation
statusScopingUnder Construction/Commissioning1stage Construction or commissioning recorded.
Redshaw Energy Park Developments LLP
Redshaw Energy Park 132kV substation
siteLinnmill 132/33kVRedshaw Energy Park 132kV substation500point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
KONA ASSET 3 LIMITED
Smeaton 400kV
siteSmeaton 400/275kVSmeaton 400kV228voltage The same site at a different voltage, which is a different connection point, or a correction to which one.
AGR SOLAR 4 LIMITED
Wymondley 400/33kV Substation
siteWymondley 400kV SubstationWymondley 400/33kV Substation50voltage The same site at a different voltage, which is a different connection point, or a correction to which one.
CARE POWER (BRENTWOOD) LIMITED
Iron Acton (South West) GSP
siteWarley GSPIron Acton (South West) GSP50point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
Care Power (Berkeley) Limited
Warley GSP
siteIron Acton (South West) GSPWarley GSP50point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
PERWINNES SOLAR AND BATTERY STORAGE LIMITED
Dyce 132/33kV GSP
siteDyce 132/33kV SubstationDyce 132/33kV GSP45renamed The same connection point, described differently.
GRUPOTEC SOLAR UK 5 LIMITED
Tongland 132/11kV
siteTongland 132/33kV SubstationTongland 132/11kV36voltage The same site at a different voltage, which is a different connection point, or a correction to which one.

18 September 2026

6 changes across 6 projects, 0 of them spelling only. 1,564 projects in the register, 426.2 GW contracted.

ProjectWhat changedFromToMWOur reading
CARE POWER (BRENTWOOD) LIMITED
Warley GSP
entered··50entered A new row in the register.
Care Power (Berkeley) Limited
Iron Acton (South West) GSP
entered··50entered A new row in the register.
DEESIDE POWER (UK) LIMITED
Connah's Quay 400kV Substation
gate02189gate up A firm connection right recorded where there was none.
GLEN WIND FARM COMPANY LIMITED
Tongland 132/11kV
gate0135gate Gate 1 recorded, a place in the process rather than a firm right.
Light Valley Solar Limited
Monk Fryston 400kV Substation
siteMonk Fryston 275kV SubstationMonk Fryston 400kV Substation500voltage The same site at a different voltage, which is a different connection point, or a correction to which one.
Opdenergy UK 13 Limited
KILLIN 132/33KV GRID SUPPLY POINT SUBSTATION
ownerOPDE UK LIMITEDOpdenergy UK 13 Limited49applicant A different company now holds the position. Usually a sale or a transfer into a project vehicle; check Companies House before calling it either.

15 September 2026

7 changes across 5 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.

ProjectWhat changedFromToMWOur reading
South Street BESS Limited
Partrick GSP
gate0163gate Gate 1 recorded, a place in the process rather than a firm right.
Bluestone Energy Ltd
Finnieston GSP
gate0160gate Gate 1 recorded, a place in the process rather than a firm right.
Vital Energi Solutions Limited
Killermont GSP
gate0143gate Gate 1 recorded, a place in the process rather than a firm right.
Bluestone Energy Ltd
Bonnybridge 132/33kV
siteBonnybridge 275/33kV SubstationBonnybridge 132/33kV60voltage The same site at a different voltage, which is a different connection point, or a correction to which one.
Bluestone Energy Ltd
Finnieston GSP
siteFinnieston 132/33kV SubstationFinnieston GSP60renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one.
Vital Energi Solutions Limited
Carntyne (SPD) GSP
siteCarntyne 132/33kVCarntyne (SPD) GSP50renamed The same connection point under a fuller name.
Vital Energi Solutions Limited
Killermont GSP
siteKillermont 132/33kVKillermont GSP43renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one.

11 September 2026

0 changes across 0 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.

Nothing moved.

10 September 2026

6 changes across 5 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.

ProjectWhat changedFromToMWOur reading
RUGELEY POWER GENERATION LIMITED
Rugeley 400kV Substation
exited··400left The row is gone from the register. Terminated, withdrawn or merged into another; the register does not say.
Eccles Energy Centre Limited
Eccles 400kV Substation
gate02500gate up A firm connection right recorded where there was none.
Fig Power Limited
Leeds North Connection Node B 400kV Substation
gate01200gate Gate 1 recorded, a place in the process rather than a firm right.
WYMONDLEY GREEN ENERGY CENTRE LTD
Wymondley 2 400kV Substation
siteWymondley 400kV SubstationWymondley 2 400kV Substation700point A different point at the same site, going by the name. A second substation there, or a correction to which one; the ledger cannot tell which.
Fig Power Limited
Leeds North Connection Node B 400kV Substation
siteEggborough 400kV SubstationLeeds North Connection Node B 400kV Substation200point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
RWE Renewables UK Onshore Wind Limited
Carradale 2 132/33kV GSP Substation
siteCarradale 2 GSPCarradale 2 132/33kV GSP Substation53renamed The same connection point under a fuller name.

8 September 2026

27 changes across 23 projects, 17 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
FORSA ENERGY HOLDINGS LIMITED
FORSA ENERGY DENNY BESS 132KV GRID SUPPLY POINT SUBSTATION
gate01100gate Gate 1 recorded, a place in the process rather than a firm right.
Clayfords Energy Storage Ltd
Strichen 132/33kV GSP Substation
gate0250gate up A firm connection right recorded where there was none.
Lochluichart Battery Storage Limited
Grudie Bridge GSP
gate0250gate up A firm connection right recorded where there was none.
Reay Power Limited
Dounreay GSP
gate0234gate up A firm connection right recorded where there was none.
Clayfords Energy Storage Ltd
Strichen 132/33kV GSP Substation
date2024-10-312026-06-3050slipped The contracted connection date moved later by a year and 8 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
Lochluichart Battery Storage Limited
Grudie Bridge GSP
date2025-10-312028-05-3050slipped The contracted connection date moved later by 2 years and 7 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
Geocore (Kellwood) Ltd
Dumfries 132/33kV
date2027-10-312030-07-3040slipped The contracted connection date moved later by 2 years and 9 months. Slippage measured from our own captures, which nobody else publishes.
Reay Power Limited
Dounreay GSP
date2026-07-312027-11-0134slipped The contracted connection date moved later by a year and 3 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
MOWBRAY ENERGY PARK LIMITED
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation1,000spelling The same connection point; the register changed its spelling or punctuation.
COTTOM TO RYHALL ENERGY LIMITED
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation1,000spelling The same connection point; the register changed its spelling or punctuation.
Trent BESS II Limited
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation500spelling The same connection point; the register changed its spelling or punctuation.
Trent BESS I Limited
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation500spelling The same connection point; the register changed its spelling or punctuation.
ARM Cedar Limited
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation480spelling The same connection point; the register changed its spelling or punctuation.
FRV Powertek Limited
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation400spelling The same connection point; the register changed its spelling or punctuation.
CRH RENEWABLES LIMITED
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation400spelling The same connection point; the register changed its spelling or punctuation.
Field Kinardochy Ltd
Kinardochy Substation 400/275kV
siteKinardochy Substation. 400/275kVKinardochy Substation 400/275kV400spelling The same connection point; the register changed its spelling or punctuation.
RWE Renewables UK Solar and Storage Limited
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation350spelling The same connection point; the register changed its spelling or punctuation.
Queequeg Renewables Ltd
Trent Valley South Connection Node B 400kV Substation
siteTrent Valley South Connection Node B 400kV Substation.Trent Valley South Connection Node B 400kV Substation240spelling The same connection point; the register changed its spelling or punctuation.
QAIR SCOTLAND LIMITED
Thurso South 275kV Substation
siteThurso South 275kV Substation’Thurso South 275kV Substation200spelling The same connection point; the register changed its spelling or punctuation.
Voltwise Power Holdings Limited
Solent Connection Node B 132kV Substation
siteSolent Connection Node B 132kV Substation.Solent Connection Node B 132kV Substation120spelling The same connection point; the register changed its spelling or punctuation.
WP Grid Storage 3 Limited
Thurso South 275kV Substation
siteThurso South 275kV Substation’Thurso South 275kV Substation100spelling The same connection point; the register changed its spelling or punctuation.
Apatura Battery Ltd
Thurso South 275kV Substation
siteThurso South 275kV Substation’Thurso South 275kV Substation100spelling The same connection point; the register changed its spelling or punctuation.
Reay Power Limited
Dounreay GSP
siteDounreay 132kV ConverterDounreay GSP34point Different equipment at the same site. A converter station, a grid supply point and a bulk supply point are different connection points with their own capacities, not names for one thing. Gate 2 arrived the same day, so this is the point named in the offer.
Scottish Hydro Electric Power Distribution Plc
Redmoss 132/33kV GSP Substation
siteRedmoss GSPRedmoss 132/33kV GSP Substation8renamed The same connection point under a fuller name.
BUCCLEUCH ESTATES, LTD. (THE)
BORDERS SOLAR 132/33KV SUBSTATION
ownerBUCCLEUCH ESTATES LTD (THE)BUCCLEUCH ESTATES, LTD. (THE)228spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES, LTD. (THE)
Dalkeith 400kV Substation
ownerBUCCLEUCH ESTATES LTD (THE)BUCCLEUCH ESTATES, LTD. (THE)200spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES, LTD. (THE)
Drinkstone Hybrid 132/33kV substation
ownerBUCCLEUCH ESTATES LTD (THE)BUCCLEUCH ESTATES, LTD. (THE)55spelling Same company, the register changed its spelling or punctuation. Not a change of hands.

4 September 2026

11 changes across 7 projects, 3 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
RWE GENERATION UK PLC
Pembroke 400kV Substation
gate02350gate up A firm connection right recorded where there was none.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
gate0250gate up A firm connection right recorded where there was none.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
gate2134gate down A gate 2 flag removed. Either the offer lapsed or the register corrected itself; the next capture usually says which.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
energised81.00.034de-energised Connected capacity taken back to nothing. A correction of an earlier entry, or capacity taken off the system. The consent stage moved back the same day, which makes it a correction.
RWE GENERATION UK PLC
Pembroke 400kV Substation
date2027-10-292029-03-07350slipped The contracted connection date moved later by a year and 4 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
statusBuiltAwaiting Consents34stage back Taken back from built. A built project cannot be unbuilt, so the earlier entry was wrong, or the row was confused with another.
Field Drum Farm Ltd
Keith 2 132/33kV GSP Substation
siteKeith 2 GSPKeith 2 132/33kV GSP Substation50renamed The same connection point under a fuller name. Gate 2 arrived the same day, so this is the point named in the offer.
Scottish Hydro Electric Power Distribution Plc
Braco West GSP
siteBraco West 275/33kV GSP SubstationBraco West GSP0.1renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one.
BUCCLEUCH ESTATES LTD (THE)
BORDERS SOLAR 132/33KV SUBSTATION
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)228spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES LTD (THE)
Dalkeith 400kV Substation
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)200spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
BUCCLEUCH ESTATES LTD (THE)
Drinkstone Hybrid 132/33kV substation
ownerBUCCLEUCH ESTATES, LTD. (THE)BUCCLEUCH ESTATES LTD (THE)55spelling Same company, the register changed its spelling or punctuation. Not a change of hands.

1 September 2026

55 changes across 50 projects, 39 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
SOUTH GRANTHAM ENERGY CENTRE LIMITED
Trent Valley South Connection Node C 400kV Substation
gate01810gate Gate 1 recorded, a place in the process rather than a firm right.
Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
Advance Grid Solutions Limited
East Kilbride B 275/33kV Substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
HP Trotter t/a Printonan Farm
Kaimes GSP
gate0151gate Gate 1 recorded, a place in the process rather than a firm right.
SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
gate0250gate up A firm connection right recorded where there was none.
LAWMOOR DEVELOPMENTS ENERGY STORAGE LIMITED
St. Andrews Cross GSP
gate0150gate Gate 1 recorded, a place in the process rather than a firm right.
Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
gate0250gate up A firm connection right recorded where there was none.
Vital Energi Solutions Limited
Carntyne 132/33kV
gate0150gate Gate 1 recorded, a place in the process rather than a firm right.
Craig Nab Wind Energy Hub Limited
Ladyburn 132kV Substation
gate0136gate Gate 1 recorded, a place in the process rather than a firm right.
Toftingall Wind Limited
Mybster 1 GSP
gate0225gate up A firm connection right recorded where there was none.
KINCRAIG ENERGY CENTRE LIMITED
Dyce 132/33kV GSP
gate0221gate up A firm connection right recorded where there was none.
SIRIUS ECODEV (STIRLING) LTD
Coupar Angus 132/33kV GSP
date2026-06-302026-12-3150slipped The contracted connection date moved later by 6 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
Corshellach Energy Storage Limited
Berryburn 275/33kV GSP Substation
date2027-10-312028-10-3150slipped The contracted connection date moved later by a year. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
Toftingall Wind Limited
Mybster 1 GSP
date2025-08-312026-09-3025slipped The contracted connection date moved later by a year and 1 month. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
SOUTH GRANTHAM ENERGY CENTRE LIMITED
Trent Valley South Connection Node C 400kV Substation
siteGrantham 400KVTrent Valley South Connection Node C 400kV Substation810point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
SP DISTRIBUTION PLC
Leven 132/33kV Substation
siteLeven GSPLeven 132/33kV Substation20renamed The same connection point under a fuller name.
RWE GENERATION UK PLC
Didcot 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC1,475spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Eaton Socon 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC740spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Pembroke 400kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC350spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Butlers Wood 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED330spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Necton 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node D 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node A 275kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Sussex and Romney Connection Node A 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Wearside Connection Node B 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
North Anglia Connection Node E 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED300spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
New Deer 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED200spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
ZENOBE ENERGY LIMITED
Norton East 400kV Substation
ownerZenobe Energy LimitedZENOBE ENERGY LIMITED150spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
RWE GENERATION UK PLC
Didcot 132kV Substation
ownerRWE Generation UK PlcRWE GENERATION UK PLC150spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Newarthill 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC50spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Giffnock 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC45spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Erskine 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Drumcross 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Drumcross 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Coatbridge 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dunfermline 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Coylton 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC30spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dalmarnock GSP
ownerSP Distribution plcSP DISTRIBUTION PLC29spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Newarthill 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC29spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC25spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC23spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Kilwinning GSP
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Broxburn 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Devol Moor 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Leven 132/33kV Substation
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Westfield 275/132kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dumfries 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC20spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
East Kilbride South 275/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC16spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Redhouse GSP
ownerSP Distribution plcSP DISTRIBUTION PLC16spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Cupar GSP
ownerSP Distribution plcSP DISTRIBUTION PLC12spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Dumfries 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC10spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Easterhouse 275/33kV Substation
ownerSP Distribution plcSP DISTRIBUTION PLC10spelling Same company, the register changed its spelling or punctuation. Not a change of hands.
SP DISTRIBUTION PLC
Livingston East 132/33kV
ownerSP Distribution plcSP DISTRIBUTION PLC6spelling Same company, the register changed its spelling or punctuation. Not a change of hands.

28 August 2026

19 changes across 11 projects, 0 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.

ProjectWhat changedFromToMWOur reading
BOTLEY GREEN ENERGY CENTRE LTD
Botley 400kV Substation
gate01800gate Gate 1 recorded, a place in the process rather than a firm right.
Field High Marnham Ltd
Trent Valley South Connection Node G 400kV Substation
gate01400gate Gate 1 recorded, a place in the process rather than a firm right.
Field Spittal Ltd
Spittal 132kV Substation
gate01300gate Gate 1 recorded, a place in the process rather than a firm right.
GALILEO 09 LIMITED
MID WALES CONNECTION NODE A 400KV SUBSTATION
gate01297gate Gate 1 recorded, a place in the process rather than a firm right.
HARKER ENERGY PARK LIMITED
Harker 400kV Substation
gate01250gate Gate 1 recorded, a place in the process rather than a firm right.
EPPING ENERGY PARK LIMITED
Waltham Cross B 400kV Substation
gate01250gate Gate 1 recorded, a place in the process rather than a firm right.
RENEWCO POWER LIMITED
LESSNESSOCK ENERGY PARK 132KV SUBSTATION
gate01114gate Gate 1 recorded, a place in the process rather than a firm right.
PERIGUS ENERGY UK LIMITED
Seat Hill 132kV Substation
gate0190gate Gate 1 recorded, a place in the process rather than a firm right.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
gate0281gate up A firm connection right recorded where there was none.
BUCCLEUCH ESTATES, LTD. (THE)
Drinkstone Hybrid 132/33kV substation
gate0155gate Gate 1 recorded, a place in the process rather than a firm right.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
energised0.081.081energised Connected capacity recorded where there was none: a battery arriving, or a phase of one.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
mw119.034.081capacity down Contracted capacity cut. Usually a phase split into its own row, or a smaller offer accepted. Gate 2 arrived the same day, so this is the capacity in the offer.
SWANSEA NORTH GREEN NG LIMITED
Swansea North 400kV Substation
date2028-10-312028-10-301,025date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
date2026-04-242028-04-0181slipped The contracted connection date moved later by a year and 11 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan.
PENCLOE WIND ENERGY LIMITED
Pencloe 132/33kV Substation
statusConsents ApprovedBuilt81built Recorded as built; the register's word rather than a meter reading. Connected capacity arrived on the same day.
Field Spittal Ltd
Spittal 132kV Substation
siteSpittal 275kV SubstationSpittal 132kV Substation300voltage The same site at a different voltage, which is a different connection point, or a correction to which one.
GALILEO 09 LIMITED
MID WALES CONNECTION NODE A 400KV SUBSTATION
siteOswestry SubstationMID WALES CONNECTION NODE A 400KV SUBSTATION297point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.
RENEWCO POWER LIMITED
LESSNESSOCK ENERGY PARK 132KV SUBSTATION
siteLessnessockLESSNESSOCK ENERGY PARK 132KV SUBSTATION114renamed The same connection point under a fuller name.
BUCCLEUCH ESTATES, LTD. (THE)
Drinkstone Hybrid 132/33kV substation
siteHawick 132kV SubstationDrinkstone Hybrid 132/33kV substation55point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which.

25 August 2026

0 changes across 0 projects, 0 of them spelling only. 1,563 projects in the register, 426.7 GW contracted.

Nothing moved.