2,283 MW gained a firm gate 2 position since 25 August 2026
NESO publishes the connection registers as a file that overwrites itself. We read it every Tuesday and Friday, keep every copy, and print the difference, project by project. Nothing here is inferred from the numbers; it is the register on one day against the register on the day before. The column headed "our reading" is ours, and it can be wrong.
By week
| Week | Captures | Changes | Spelling only | Projects | In | Out | Gate moves | Gate 2 gained, MW | Changed hands | Dates moved |
|---|---|---|---|---|---|---|---|---|---|---|
| Week 35, 2026 | 2 | 19 | · | 11 | 0 | 0 | 10 | 81 | 0 | 2 |
| Week 36, 2026 | 2 | 66 | 42 | 56 | 0 | 0 | 14 | 546 | 0 | 4 |
| Week 37, 2026 | 3 | 33 | 17 | 28 | 0 | 1 | 6 | 634 | 0 | 4 |
| Week 38, 2026 | 2 | 13 | · | 11 | 2 | 0 | 5 | 189 | 1 | 0 |
| Week 39, 2026 | 2 | 121 | · | 107 | 2 | 0 | 17 | 834 | 0 | 9 |
| Week 40, 2026 | 1 | 2 | · | 2 | 0 | 1 | 0 | · | 0 | 0 |
By month
| Month | Captures | Changes | Spelling only | Projects | In | Out | Gate moves | Gate 2 gained, MW | Changed hands | Dates moved |
|---|---|---|---|---|---|---|---|---|---|---|
| August 2026 | 2 | 19 | · | 11 | 0 | 0 | 10 | 81 | 0 | 2 |
| September 2026 | 10 | 235 | 59 | 189 | 4 | 2 | 42 | 2,202 | 1 | 17 |
Where this can be wrong
The ledger began on 25 August 2026. Nothing that happened before that day is here, and the first capture is a baseline rather than a report. A change of applicant is printed whether the register renamed a company or a different company took the position; the reading column separates the two by comparing the names with their punctuation and legal suffix removed, which is a rule and not a check against a filing. A change of connection point is read the same way, word by word: the words that say what kind of thing a point is and its voltage are set aside, and what is left decides between a respelling, a fuller or shorter name for the same point, a different voltage at the same site, different equipment at the same site (a converter station and a grid supply point are not one thing) and a different point; that is a rule, not a check against a map. A different point may be a move, a correction, or a project identifier reused for something else, and the register does not say which; Buccleuch Estates moving from the Scottish Borders to Suffolk in one capture is the standing example. A capacity, a date or a stage is read in its direction and against the other rows of the same project on the same day: a date moving on the day a gate 2 flag arrives is the offer's date rather than slippage, and connected capacity falling to nothing on the day a stage moves backwards is a correction. A gate 2 flag that appears in one capture and vanishes in the next, as Pencloe did between 28 August and 4 September, is printed both times, because both readings are what NESO published. Where the register is wrong, this page is wrong with it, and it stays wrong until the register corrects itself. If you know better, tell us.
The queue tool is rebuilt from the latest capture with every deploy, so the applicant table, the gates and the dates on the map are the same rows this page reads. The same list goes out by email on Fridays.
29 September 2026
2 changes across 2 projects, 0 of them spelling only. 1,565 projects in the register, 426.1 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| JEPIPHANY LIMITED Melksham 400kV Substation | exited | · | · | 90 | left The row is gone from the register. Terminated, withdrawn or merged into another; the register does not say. |
| Scottish Hydro Electric Power Distribution Plc Redmoss GSP | site | Redmoss 132/33kV GSP Substation | Redmoss GSP | 8 | renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one. |
25 September 2026
17 changes across 13 projects, 0 of them spelling only. 1,566 projects in the register, 426.1 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| CARE POWER (WOLVERHAMPTON) LIMITED Penn GSP | entered | · | · | 50 | entered A new row in the register. |
| CARE POWER (NORTH TAWTON) LIMITED Alverdiscott GSP | entered | · | · | 30 | entered A new row in the register. |
| ECODEV GROUP LTD Pembroke 400kV Substation | gate | 0 | 1 | 240 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| SIRIUSECODEV (GASTARD) LTD Melksham B 132KV Substation | gate | 0 | 1 | 200 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| BENTHEAD SOLAR LIMITED Kilwinning 132/33kV | gate | 0 | 2 | 63 | gate up A firm connection right recorded where there was none. |
| Advance Grid Solutions Limited Coatbridge GSP | gate | 0 | 1 | 60 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| BSR APPLICATIONS LIMITED Strichen 132/33kV GSP Substation | gate | 0 | 1 | 60 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Advance Grid Solutions Limited East Kilbride B 275/33kV Substation | gate | 0 | 1 | 50 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Bluestone Energy Ltd DEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATION | gate | 0 | 1 | 49 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| HD144WHI LTD Whitegate 275kV Substation | energised | 0.0 | 57.0 | 57 | energised Connected capacity recorded where there was none: a battery arriving, or a phase of one. |
| HD144WHI LTD Whitegate 275kV Substation | mw | 57.0 | 0.0 | 57 | capacity down Contracted capacity cut. Usually a phase split into its own row, or a smaller offer accepted. |
| BROCKWELL STORAGE & SOLAR LIMITED Willington 400kV Substation | date | 2028-03-30 | 2028-10-31 | 500 | slipped The contracted connection date moved later by 7 months. Slippage measured from our own captures, which nobody else publishes. |
| Sunshine Project 03 Limited Devol Moor 400/132kV | date | 2029-10-17 | 2027-09-27 | 400 | brought forward The contracted connection date moved earlier by 2 years and 1 month. Rare; an accelerated offer, or a correction. |
| HD144WHI LTD Whitegate 275kV Substation | date | 2024-06-30 | · | 57 | date The contracted connection date moved. |
| BENTHEAD SOLAR LIMITED Kilwinning 132/33kV | status | Scoping | Consents Approved | 63 | stage Consent recorded as granted. |
| HD144WHI LTD Whitegate 275kV Substation | status | Consents Approved | Built | 57 | built Recorded as built; the register's word rather than a meter reading. Connected capacity arrived on the same day. |
| Macduff Battery Storage Ltd MacDuff 132/33kV GSP Substation | status | Awaiting Consents | Consents Approved | 50 | stage Consent recorded as granted. |
22 September 2026
104 changes across 95 projects, 0 of them spelling only. 1,564 projects in the register, 426.2 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Braintree 10 Renewables Limited Braintree 400kV Substation | gate | 0 | 1 | 1,000 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| CULHAM STORAGE LIMITED Culham Jet 400kV Substation | gate | 0 | 2 | 500 | gate up A firm connection right recorded where there was none. |
| EPL NEWCO6 LIMITED Wakeleys 400kV | gate | 0 | 1 | 480 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| ENSO GREEN HOLDINGS X LIMITED Feckenham 400kV Substation | gate | 0 | 1 | 400 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Sunshine Project 03 Limited Devol Moor 400/132kV | gate | 0 | 1 | 400 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| SSE FIDDLERS FERRY BATTERY LIMITED Fiddlers Ferry 275kV Substation | gate | 0 | 2 | 150 | gate up A firm connection right recorded where there was none. |
| BERWICK RENEWABLES TX LIMITED Berwick 132/33kV | gate | 0 | 1 | 100 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| LISTER BATTERY LTD Lister Drive 275kV Substation | gate | 0 | 2 | 57 | gate up A firm connection right recorded where there was none. |
| IQ ENERGY CENTRE LIMITED Indian Queens 400kV Substation | gate | 0 | 2 | 48 | gate up A firm connection right recorded where there was none. |
| SIRIUS ECODEV (KEITHICK) LTD Coupar Angus 132/33kV GSP | gate | 0 | 2 | 16 | gate up A firm connection right recorded where there was none. |
| DIDCOT BATTERY LIMITED DIDCOT 400/132KV SUBSTATION | date | 2027-03-30 | 2027-03-31 | 100 | date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan. |
| Priory Generation Limited Wymondley 400kV Substation | date | 2025-10-31 | 2027-05-30 | 57 | slipped The contracted connection date moved later by a year and 7 months. Slippage measured from our own captures, which nobody else publishes. |
| AGR SOLAR 4 LIMITED Wymondley 400/33kV Substation | date | 2025-10-31 | 2027-05-30 | 50 | slipped The contracted connection date moved later by a year and 7 months. Slippage measured from our own captures, which nobody else publishes. |
| Persley Croft BESS Ltd Persley 132/33kV GSP Substation | date | 2026-07-31 | 2026-07-30 | 50 | date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan. |
| Field Drum Farm Ltd Keith 2 132/33kV GSP Substation | date | 2028-10-31 | 2026-10-31 | 50 | brought forward The contracted connection date moved earlier by 2 years. Rare; an accelerated offer, or a correction. |
| SIRIUS ECODEV (KEITHICK) LTD Coupar Angus 132/33kV GSP | date | 2026-06-30 | 2026-12-31 | 16 | slipped The contracted connection date moved later by 6 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| THORPE MARSH GREEN ENERGY HUB LIMITED Thorpe Marsh 400kV Substation | status | Consents Approved | Under Construction/Commissioning | 1,400 | stage Construction or commissioning recorded. |
| FIDDLERS FERRY LTD Fiddlers Ferry 275kV Substation | status | Scoping | Consents Approved | 900 | stage Consent recorded as granted. |
| CONNECTID 3 LIMITED North Anglia Connection Node C 400kV Substation | status | Scoping | Awaiting Consents | 800 | stage Out of scoping and into the consent process. |
| ONE EARTH SOLAR FARM LIMITED High Marnham 400kV Substation | status | Scoping | Awaiting Consents | 740 | stage Out of scoping and into the consent process. |
| CONNECTID 1 LIMITED West Anglia Connection Node F 400kV Substation | status | Scoping | Awaiting Consents | 700 | stage Out of scoping and into the consent process. |
| Statkraft UK Ltd Neilston 400kV Substation | status | Awaiting Consents | Consents Approved | 600 | stage Consent recorded as granted. |
| CONNECTID 2 LIMITED North Anglia Connection Node E 400kV Substation | status | Scoping | Awaiting Consents | 520 | stage Out of scoping and into the consent process. |
| MAS 002 LIMITED Bradford West 275kV Substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| LIME DOWN SOLAR PARK LIMITED Melksham 400kV Substation | status | Scoping | Awaiting Consents | 500 | stage Out of scoping and into the consent process. |
| ALCEMI STORAGE DEVELOPMENTS 3 LIMITED Devilla Battery Storage 275kV substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| Eccles Energy Centre Limited Eccles 400kV Substation | status | Scoping | Under Construction/Commissioning | 500 | stage Construction or commissioning recorded. |
| ALCEMI STORAGE DEVELOPMENTS 6 LIMITED Coalburn 400kV GIS Substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| TAGENERGY DEVELOPMENT UK LIMITED Drakelow 400kV Substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| Kilmarnock Energy Centre Limited Kilmarnock South 400kV Substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| CARLTON POWER LIMITED Strathaven 400/275kV | status | Scoping | Awaiting Consents | 500 | stage Out of scoping and into the consent process. |
| CULHAM STORAGE LIMITED Culham Jet 400kV Substation | status | Scoping | Consents Approved | 500 | stage Consent recorded as granted. |
| SSE STAYTHORPE POWER LIMITED Staythorpe 400kV Substation | status | Awaiting Consents | Consents Approved | 437 | stage Consent recorded as granted. |
| ZENOBE ECCLES LIMITED Eccles 400kV Substation | status | Scoping | Under Construction/Commissioning | 400 | stage Construction or commissioning recorded. |
| Kilmarnock Flexpower Ltd Boydston 400kV substation | status | Consents Approved | Under Construction/Commissioning | 350 | stage Construction or commissioning recorded. |
| RWE GENERATION UK PLC Pembroke 400kV Substation | status | Awaiting Consents | Consents Approved | 350 | stage Consent recorded as granted. |
| Carrog Storage Facility Limited Wylfa 400kV Substation | status | Awaiting Consents | Consents Approved | 300 | stage Consent recorded as granted. |
| Dalzell (Newarthill) Ltd Newarthill Energy Park 275kV Substation | status | Consents Approved | Scoping | 300 | stage back The consent stage moved backwards. A consent lapsed or was refused, or the register corrected an earlier entry; the ledger cannot tell which. |
| COCKENZIE STORAGE LIMITED Meadowmill 400/132kV Substation | status | Scoping | Under Construction/Commissioning | 240 | stage Construction or commissioning recorded. |
| HUNTERSTON GRID 1 LTD Ayrshire Grid 400kV Substation | status | Scoping | Consents Approved | 200 | stage Consent recorded as granted. |
| KINCARDINE GRID 1 LTD Fife Grid Services Facility 275kV Substation | status | Scoping | Consents Approved | 200 | stage Consent recorded as granted. |
| KINCARDINE GRID 1 LTD Fife Grid Services Facility 275kV Substation | status | Scoping | Consents Approved | 200 | stage Consent recorded as granted. |
| Whitehill Battery Storage Ltd Easterhouse 275kV | status | Awaiting Consents | Consents Approved | 200 | stage Consent recorded as granted. |
| HUNTERSTON GRID 1 LTD Hunterston East 400kV substation | status | Scoping | Consents Approved | 200 | stage Consent recorded as granted. |
| BERKSWELL BATTERY STORAGE LIMITED Berkswell 275kV Substation | status | Consents Approved | Under Construction/Commissioning | 200 | stage Construction or commissioning recorded. |
| Zenobe Coalburn Limited Coalburn North 400kV Substation | status | Scoping | Consents Approved | 200 | stage Consent recorded as granted. |
| BUCCLEUCH ESTATES, LTD. (THE) Dalkeith 400kV Substation | status | Scoping | Awaiting Consents | 200 | stage Out of scoping and into the consent process. |
| ENSO GREEN HOLDINGS D LIMITED Drax 132kV Substation | status | Scoping | Awaiting Consents | 190 | stage Out of scoping and into the consent process. |
| DEESIDE POWER (UK) LIMITED Connah's Quay 400kV Substation | status | Consents Approved | Built | 189 | built Recorded as built; the register's word rather than a meter reading. |
| VOLTALIA UK LTD Bowsheils 132kV Substation | status | Scoping | Awaiting Consents | 167 | stage Out of scoping and into the consent process. |
| S4N SPITTAL LTD Spittal 132kV Substation | status | Scoping | Awaiting Consents | 162 | stage Out of scoping and into the consent process. |
| SSE FIDDLERS FERRY BATTERY LIMITED Fiddlers Ferry 275kV Substation | status | Scoping | Consents Approved | 150 | stage Consent recorded as granted. |
| Rosside Energy Limited Blackhillock 275kV Substation | status | Scoping | Awaiting Consents | 150 | stage Out of scoping and into the consent process. |
| Drax BESS Neilston Limited Glennifer Road BESS 132kV substation | status | Scoping | Consents Approved | 150 | stage Consent recorded as granted. |
| ENSO GREEN HOLDINGS A LIMITED West Burton 132kV Substation | status | Scoping | Under Construction/Commissioning | 120 | stage Construction or commissioning recorded. |
| NEWLANDS HILL WIND ENERGY HUB LIMITED Newlands Hill 132/33kV | status | Scoping | Awaiting Consents | 119 | stage Out of scoping and into the consent process. |
| COCKENZIE STORAGE B LTD Meadowmill 400/132kV Substation | status | Scoping | Under Construction/Commissioning | 102 | stage Construction or commissioning recorded. |
| Flemyland Battery Storage Limited Kilwinning 132/33kV | status | Scoping | Consents Approved | 100 | stage Consent recorded as granted. |
| LAIRDMANNOCH ENERGY PARK LIMITED Lairdmannoch Energy Park 132kV substation | status | Scoping | Awaiting Consents | 100 | stage Out of scoping and into the consent process. |
| Rashley New Energy Limited Saltcoats 132/33kV | status | Scoping | Awaiting Consents | 100 | stage Out of scoping and into the consent process. |
| Brunt Hill Limited Westfield 132/33kV | status | Scoping | Awaiting Consents | 99 | stage Out of scoping and into the consent process. |
| ALUDRA BESS LTD Drakelow 132kV Substation | status | Scoping | Consents Approved | 90 | stage Consent recorded as granted. |
| Don Cossack Ltd Tynemouth 275kV Substation | status | Scoping | Awaiting Consents | 70 | stage Out of scoping and into the consent process. |
| LEL BILBO SOLAR LIMITED Strichen 132/33kV GSP Substation | status | Scoping | Under Construction/Commissioning | 67 | stage Construction or commissioning recorded. |
| BSSL EAST LOTHIAN 1 LTD Cockenzie 275/33kV Substation | status | Scoping | Consents Approved | 63 | stage Consent recorded as granted. |
| BROCKWELL STORAGE & SOLAR LIMITED Kilmarnock Town 275/33kV Substation | status | Scoping | Consents Approved | 60 | stage Consent recorded as granted. |
| ENSO GREEN HOLDINGS L LIMITED Canterbury North 400kV Substation | status | Scoping | Awaiting Consents | 57 | stage Out of scoping and into the consent process. |
| BRAMLEY BESS LIMITED Bramley 400kV Substation | status | Consents Approved | Under Construction/Commissioning | 57 | stage Construction or commissioning recorded. |
| BRAMLEY SOLAR LIMITED Bramley 400kV Substation | status | Scoping | Under Construction/Commissioning | 57 | stage Construction or commissioning recorded. |
| Rochdale (BES) Ltd Rochdale 275kV Substation | status | Scoping | Consents Approved | 57 | stage Consent recorded as granted. |
| PENWORTHAM (BES) LTD Penwortham 400kV Substation | status | Scoping | Consents Approved | 57 | stage Consent recorded as granted. |
| LISTER BATTERY LTD Lister Drive 275kV Substation | status | Scoping | Consents Approved | 57 | stage Consent recorded as granted. |
| E Power Limited Dunlaw Extension 132/33kV | status | Scoping | Awaiting Consents | 53 | stage Out of scoping and into the consent process. |
| SIRIUS ECODEV (STIRLING) LTD Coupar Angus 132/33kV GSP | status | Consents Approved | Under Construction/Commissioning | 50 | stage Construction or commissioning recorded. |
| ROTHIENORMAN FLEXPOWER LTD Rothienorman 400/33kV Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| Persley Croft BESS Ltd Persley 132/33kV GSP Substation | status | Scoping | Under Construction/Commissioning | 50 | stage Construction or commissioning recorded. |
| Dyce Battery Storage Limited Dyce 132/33kV GSP | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| BRACO ENERGY STORAGE LIMITED Braco West 275/33kV GSP Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| Field Drum Farm Ltd Keith 2 132/33kV GSP Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| BALNACRAIG BATTERY STORAGE LIMITED Alness 132/33kV Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| Gas Generation Property Limited Elderslie 132/33kV | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| CHECKERS ENERGY LIMITED Govan 132/33kV | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| Field Holmston Ltd Ayr 275/33kV | status | Scoping | Under Construction/Commissioning | 50 | stage Construction or commissioning recorded. |
| Corshellach Energy Storage Limited Berryburn 275/33kV GSP Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| LG-B-50a Limited Beauly 132/33 kV GSP Substation | status | Scoping | Consents Approved | 50 | stage Consent recorded as granted. |
| POTENCIA ENERGY LIMITED Mybster 3 132/33kV Substation | status | Scoping | Awaiting Consents | 47 | stage Out of scoping and into the consent process. |
| PERWINNES SOLAR AND BATTERY STORAGE LIMITED Dyce 132/33kV GSP | status | Scoping | Consents Approved | 45 | stage Consent recorded as granted. |
| FALKIRK POWER LTD Bainsford 132/33kV | status | Consents Approved | Under Construction/Commissioning | 43 | stage Construction or commissioning recorded. |
| DALMARNOCK BESS LTD DALMARNOCK 132/33KV SUBSTATION | status | Scoping | Under Construction/Commissioning | 40 | stage Construction or commissioning recorded. |
| EKU ENERGY FAUNE PROJECTS (UK) LIMITED Helensburgh 132/33kV | status | Scoping | Consents Approved | 40 | stage Consent recorded as granted. |
| Field Keith Ltd Keith 1 132/33kV GSP Substation | status | Scoping | Consents Approved | 39 | stage Consent recorded as granted. |
| Worcestershire Solar 1 Limited Hartmoor 275kV Substation | status | Consents Approved | Under Construction/Commissioning | 38 | stage Construction or commissioning recorded. |
| GRUPOTEC SOLAR UK 5 LIMITED Tongland 132/11kV | status | Scoping | Consents Approved | 36 | stage Consent recorded as granted. |
| AGR RENEWABLES LIMITED Wymondley 400kV Substation | status | Scoping | Awaiting Consents | 36 | stage Out of scoping and into the consent process. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | status | Awaiting Consents | Consents Approved | 34 | stage Consent recorded as granted. |
| ELVANFOOT ENERGY STORAGE LIMITED Elvanfoot 400/275/33kV | status | Scoping | Consents Approved | 10 | stage Consent recorded as granted. |
| BUK23 LIMITED Whitelaw Brae BESS 33kV substation | status | Scoping | Under Construction/Commissioning | 1 | stage Construction or commissioning recorded. |
| Redshaw Energy Park Developments LLP Redshaw Energy Park 132kV substation | site | Linnmill 132/33kV | Redshaw Energy Park 132kV substation | 500 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| KONA ASSET 3 LIMITED Smeaton 400kV | site | Smeaton 400/275kV | Smeaton 400kV | 228 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
| AGR SOLAR 4 LIMITED Wymondley 400/33kV Substation | site | Wymondley 400kV Substation | Wymondley 400/33kV Substation | 50 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
| CARE POWER (BRENTWOOD) LIMITED Iron Acton (South West) GSP | site | Warley GSP | Iron Acton (South West) GSP | 50 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| Care Power (Berkeley) Limited Warley GSP | site | Iron Acton (South West) GSP | Warley GSP | 50 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| PERWINNES SOLAR AND BATTERY STORAGE LIMITED Dyce 132/33kV GSP | site | Dyce 132/33kV Substation | Dyce 132/33kV GSP | 45 | renamed The same connection point, described differently. |
| GRUPOTEC SOLAR UK 5 LIMITED Tongland 132/11kV | site | Tongland 132/33kV Substation | Tongland 132/11kV | 36 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
18 September 2026
6 changes across 6 projects, 0 of them spelling only. 1,564 projects in the register, 426.2 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| CARE POWER (BRENTWOOD) LIMITED Warley GSP | entered | · | · | 50 | entered A new row in the register. |
| Care Power (Berkeley) Limited Iron Acton (South West) GSP | entered | · | · | 50 | entered A new row in the register. |
| DEESIDE POWER (UK) LIMITED Connah's Quay 400kV Substation | gate | 0 | 2 | 189 | gate up A firm connection right recorded where there was none. |
| GLEN WIND FARM COMPANY LIMITED Tongland 132/11kV | gate | 0 | 1 | 35 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Light Valley Solar Limited Monk Fryston 400kV Substation | site | Monk Fryston 275kV Substation | Monk Fryston 400kV Substation | 500 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
| Opdenergy UK 13 Limited KILLIN 132/33KV GRID SUPPLY POINT SUBSTATION | owner | OPDE UK LIMITED | Opdenergy UK 13 Limited | 49 | applicant A different company now holds the position. Usually a sale or a transfer into a project vehicle; check Companies House before calling it either. |
15 September 2026
7 changes across 5 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| South Street BESS Limited Partrick GSP | gate | 0 | 1 | 63 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Bluestone Energy Ltd Finnieston GSP | gate | 0 | 1 | 60 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Vital Energi Solutions Limited Killermont GSP | gate | 0 | 1 | 43 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Bluestone Energy Ltd Bonnybridge 132/33kV | site | Bonnybridge 275/33kV Substation | Bonnybridge 132/33kV | 60 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
| Bluestone Energy Ltd Finnieston GSP | site | Finnieston 132/33kV Substation | Finnieston GSP | 60 | renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one. |
| Vital Energi Solutions Limited Carntyne (SPD) GSP | site | Carntyne 132/33kV | Carntyne (SPD) GSP | 50 | renamed The same connection point under a fuller name. |
| Vital Energi Solutions Limited Killermont GSP | site | Killermont 132/33kV | Killermont GSP | 43 | renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one. |
11 September 2026
0 changes across 0 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.
Nothing moved.
10 September 2026
6 changes across 5 projects, 0 of them spelling only. 1,562 projects in the register, 426.2 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| RUGELEY POWER GENERATION LIMITED Rugeley 400kV Substation | exited | · | · | 400 | left The row is gone from the register. Terminated, withdrawn or merged into another; the register does not say. |
| Eccles Energy Centre Limited Eccles 400kV Substation | gate | 0 | 2 | 500 | gate up A firm connection right recorded where there was none. |
| Fig Power Limited Leeds North Connection Node B 400kV Substation | gate | 0 | 1 | 200 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| WYMONDLEY GREEN ENERGY CENTRE LTD Wymondley 2 400kV Substation | site | Wymondley 400kV Substation | Wymondley 2 400kV Substation | 700 | point A different point at the same site, going by the name. A second substation there, or a correction to which one; the ledger cannot tell which. |
| Fig Power Limited Leeds North Connection Node B 400kV Substation | site | Eggborough 400kV Substation | Leeds North Connection Node B 400kV Substation | 200 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| RWE Renewables UK Onshore Wind Limited Carradale 2 132/33kV GSP Substation | site | Carradale 2 GSP | Carradale 2 132/33kV GSP Substation | 53 | renamed The same connection point under a fuller name. |
8 September 2026
27 changes across 23 projects, 17 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| FORSA ENERGY HOLDINGS LIMITED FORSA ENERGY DENNY BESS 132KV GRID SUPPLY POINT SUBSTATION | gate | 0 | 1 | 100 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Clayfords Energy Storage Ltd Strichen 132/33kV GSP Substation | gate | 0 | 2 | 50 | gate up A firm connection right recorded where there was none. |
| Lochluichart Battery Storage Limited Grudie Bridge GSP | gate | 0 | 2 | 50 | gate up A firm connection right recorded where there was none. |
| Reay Power Limited Dounreay GSP | gate | 0 | 2 | 34 | gate up A firm connection right recorded where there was none. |
| Clayfords Energy Storage Ltd Strichen 132/33kV GSP Substation | date | 2024-10-31 | 2026-06-30 | 50 | slipped The contracted connection date moved later by a year and 8 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| Lochluichart Battery Storage Limited Grudie Bridge GSP | date | 2025-10-31 | 2028-05-30 | 50 | slipped The contracted connection date moved later by 2 years and 7 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| Geocore (Kellwood) Ltd Dumfries 132/33kV | date | 2027-10-31 | 2030-07-30 | 40 | slipped The contracted connection date moved later by 2 years and 9 months. Slippage measured from our own captures, which nobody else publishes. |
| Reay Power Limited Dounreay GSP | date | 2026-07-31 | 2027-11-01 | 34 | slipped The contracted connection date moved later by a year and 3 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| MOWBRAY ENERGY PARK LIMITED Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 1,000 | spelling The same connection point; the register changed its spelling or punctuation. |
| COTTOM TO RYHALL ENERGY LIMITED Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 1,000 | spelling The same connection point; the register changed its spelling or punctuation. |
| Trent BESS II Limited Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 500 | spelling The same connection point; the register changed its spelling or punctuation. |
| Trent BESS I Limited Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 500 | spelling The same connection point; the register changed its spelling or punctuation. |
| ARM Cedar Limited Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 480 | spelling The same connection point; the register changed its spelling or punctuation. |
| FRV Powertek Limited Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 400 | spelling The same connection point; the register changed its spelling or punctuation. |
| CRH RENEWABLES LIMITED Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 400 | spelling The same connection point; the register changed its spelling or punctuation. |
| Field Kinardochy Ltd Kinardochy Substation 400/275kV | site | Kinardochy Substation. 400/275kV | Kinardochy Substation 400/275kV | 400 | spelling The same connection point; the register changed its spelling or punctuation. |
| RWE Renewables UK Solar and Storage Limited Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 350 | spelling The same connection point; the register changed its spelling or punctuation. |
| Queequeg Renewables Ltd Trent Valley South Connection Node B 400kV Substation | site | Trent Valley South Connection Node B 400kV Substation. | Trent Valley South Connection Node B 400kV Substation | 240 | spelling The same connection point; the register changed its spelling or punctuation. |
| QAIR SCOTLAND LIMITED Thurso South 275kV Substation | site | Thurso South 275kV Substation’ | Thurso South 275kV Substation | 200 | spelling The same connection point; the register changed its spelling or punctuation. |
| Voltwise Power Holdings Limited Solent Connection Node B 132kV Substation | site | Solent Connection Node B 132kV Substation. | Solent Connection Node B 132kV Substation | 120 | spelling The same connection point; the register changed its spelling or punctuation. |
| WP Grid Storage 3 Limited Thurso South 275kV Substation | site | Thurso South 275kV Substation’ | Thurso South 275kV Substation | 100 | spelling The same connection point; the register changed its spelling or punctuation. |
| Apatura Battery Ltd Thurso South 275kV Substation | site | Thurso South 275kV Substation’ | Thurso South 275kV Substation | 100 | spelling The same connection point; the register changed its spelling or punctuation. |
| Reay Power Limited Dounreay GSP | site | Dounreay 132kV Converter | Dounreay GSP | 34 | point Different equipment at the same site. A converter station, a grid supply point and a bulk supply point are different connection points with their own capacities, not names for one thing. Gate 2 arrived the same day, so this is the point named in the offer. |
| Scottish Hydro Electric Power Distribution Plc Redmoss 132/33kV GSP Substation | site | Redmoss GSP | Redmoss 132/33kV GSP Substation | 8 | renamed The same connection point under a fuller name. |
| BUCCLEUCH ESTATES, LTD. (THE) BORDERS SOLAR 132/33KV SUBSTATION | owner | BUCCLEUCH ESTATES LTD (THE) | BUCCLEUCH ESTATES, LTD. (THE) | 228 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| BUCCLEUCH ESTATES, LTD. (THE) Dalkeith 400kV Substation | owner | BUCCLEUCH ESTATES LTD (THE) | BUCCLEUCH ESTATES, LTD. (THE) | 200 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| BUCCLEUCH ESTATES, LTD. (THE) Drinkstone Hybrid 132/33kV substation | owner | BUCCLEUCH ESTATES LTD (THE) | BUCCLEUCH ESTATES, LTD. (THE) | 55 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
4 September 2026
11 changes across 7 projects, 3 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| RWE GENERATION UK PLC Pembroke 400kV Substation | gate | 0 | 2 | 350 | gate up A firm connection right recorded where there was none. |
| Field Drum Farm Ltd Keith 2 132/33kV GSP Substation | gate | 0 | 2 | 50 | gate up A firm connection right recorded where there was none. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | gate | 2 | 1 | 34 | gate down A gate 2 flag removed. Either the offer lapsed or the register corrected itself; the next capture usually says which. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | energised | 81.0 | 0.0 | 34 | de-energised Connected capacity taken back to nothing. A correction of an earlier entry, or capacity taken off the system. The consent stage moved back the same day, which makes it a correction. |
| RWE GENERATION UK PLC Pembroke 400kV Substation | date | 2027-10-29 | 2029-03-07 | 350 | slipped The contracted connection date moved later by a year and 4 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | status | Built | Awaiting Consents | 34 | stage back Taken back from built. A built project cannot be unbuilt, so the earlier entry was wrong, or the row was confused with another. |
| Field Drum Farm Ltd Keith 2 132/33kV GSP Substation | site | Keith 2 GSP | Keith 2 132/33kV GSP Substation | 50 | renamed The same connection point under a fuller name. Gate 2 arrived the same day, so this is the point named in the offer. |
| Scottish Hydro Electric Power Distribution Plc Braco West GSP | site | Braco West 275/33kV GSP Substation | Braco West GSP | 0.1 | renamed The same site under a shorter name. Usually the same connection point; the ledger cannot rule out a neighbouring one. |
| BUCCLEUCH ESTATES LTD (THE) BORDERS SOLAR 132/33KV SUBSTATION | owner | BUCCLEUCH ESTATES, LTD. (THE) | BUCCLEUCH ESTATES LTD (THE) | 228 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| BUCCLEUCH ESTATES LTD (THE) Dalkeith 400kV Substation | owner | BUCCLEUCH ESTATES, LTD. (THE) | BUCCLEUCH ESTATES LTD (THE) | 200 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| BUCCLEUCH ESTATES LTD (THE) Drinkstone Hybrid 132/33kV substation | owner | BUCCLEUCH ESTATES, LTD. (THE) | BUCCLEUCH ESTATES LTD (THE) | 55 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
1 September 2026
55 changes across 50 projects, 39 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| SOUTH GRANTHAM ENERGY CENTRE LIMITED Trent Valley South Connection Node C 400kV Substation | gate | 0 | 1 | 810 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Advance Grid Solutions Limited East Kilbride B 275/33kV Substation | gate | 0 | 1 | 55 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Advance Grid Solutions Limited East Kilbride B 275/33kV Substation | gate | 0 | 1 | 55 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| HP Trotter t/a Printonan Farm Kaimes GSP | gate | 0 | 1 | 51 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| SIRIUS ECODEV (STIRLING) LTD Coupar Angus 132/33kV GSP | gate | 0 | 2 | 50 | gate up A firm connection right recorded where there was none. |
| LAWMOOR DEVELOPMENTS ENERGY STORAGE LIMITED St. Andrews Cross GSP | gate | 0 | 1 | 50 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Corshellach Energy Storage Limited Berryburn 275/33kV GSP Substation | gate | 0 | 2 | 50 | gate up A firm connection right recorded where there was none. |
| Vital Energi Solutions Limited Carntyne 132/33kV | gate | 0 | 1 | 50 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Craig Nab Wind Energy Hub Limited Ladyburn 132kV Substation | gate | 0 | 1 | 36 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Toftingall Wind Limited Mybster 1 GSP | gate | 0 | 2 | 25 | gate up A firm connection right recorded where there was none. |
| KINCRAIG ENERGY CENTRE LIMITED Dyce 132/33kV GSP | gate | 0 | 2 | 21 | gate up A firm connection right recorded where there was none. |
| SIRIUS ECODEV (STIRLING) LTD Coupar Angus 132/33kV GSP | date | 2026-06-30 | 2026-12-31 | 50 | slipped The contracted connection date moved later by 6 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| Corshellach Energy Storage Limited Berryburn 275/33kV GSP Substation | date | 2027-10-31 | 2028-10-31 | 50 | slipped The contracted connection date moved later by a year. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| Toftingall Wind Limited Mybster 1 GSP | date | 2025-08-31 | 2026-09-30 | 25 | slipped The contracted connection date moved later by a year and 1 month. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| SOUTH GRANTHAM ENERGY CENTRE LIMITED Trent Valley South Connection Node C 400kV Substation | site | Grantham 400KV | Trent Valley South Connection Node C 400kV Substation | 810 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| SP DISTRIBUTION PLC Leven 132/33kV Substation | site | Leven GSP | Leven 132/33kV Substation | 20 | renamed The same connection point under a fuller name. |
| RWE GENERATION UK PLC Didcot 400kV Substation | owner | RWE Generation UK Plc | RWE GENERATION UK PLC | 1,475 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| RWE GENERATION UK PLC Eaton Socon 400kV Substation | owner | RWE Generation UK Plc | RWE GENERATION UK PLC | 740 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| RWE GENERATION UK PLC Pembroke 400kV Substation | owner | RWE Generation UK Plc | RWE GENERATION UK PLC | 350 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Butlers Wood 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 330 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Necton 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Wearside Connection Node D 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Wearside Connection Node A 275kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Sussex and Romney Connection Node A 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Wearside Connection Node B 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED North Anglia Connection Node E 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 300 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED New Deer 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 200 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| ZENOBE ENERGY LIMITED Norton East 400kV Substation | owner | Zenobe Energy Limited | ZENOBE ENERGY LIMITED | 150 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| RWE GENERATION UK PLC Didcot 132kV Substation | owner | RWE Generation UK Plc | RWE GENERATION UK PLC | 150 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Newarthill 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 50 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Giffnock 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 45 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Erskine 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Drumcross 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Drumcross 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Coatbridge 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Dunfermline 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Coylton 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 30 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Dalmarnock GSP | owner | SP Distribution plc | SP DISTRIBUTION PLC | 29 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Newarthill 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 29 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Westfield 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 25 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC East Kilbride South 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 23 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Westfield 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Kilwinning GSP | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Broxburn 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Devol Moor 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Leven 132/33kV Substation | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Westfield 275/132kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC East Kilbride South 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Dumfries 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 20 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC East Kilbride South 275/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 16 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Redhouse GSP | owner | SP Distribution plc | SP DISTRIBUTION PLC | 16 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Cupar GSP | owner | SP Distribution plc | SP DISTRIBUTION PLC | 12 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Dumfries 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 10 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Easterhouse 275/33kV Substation | owner | SP Distribution plc | SP DISTRIBUTION PLC | 10 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
| SP DISTRIBUTION PLC Livingston East 132/33kV | owner | SP Distribution plc | SP DISTRIBUTION PLC | 6 | spelling Same company, the register changed its spelling or punctuation. Not a change of hands. |
28 August 2026
19 changes across 11 projects, 0 of them spelling only. 1,563 projects in the register, 426.6 GW contracted.
| Project | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| BOTLEY GREEN ENERGY CENTRE LTD Botley 400kV Substation | gate | 0 | 1 | 800 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Field High Marnham Ltd Trent Valley South Connection Node G 400kV Substation | gate | 0 | 1 | 400 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| Field Spittal Ltd Spittal 132kV Substation | gate | 0 | 1 | 300 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| GALILEO 09 LIMITED MID WALES CONNECTION NODE A 400KV SUBSTATION | gate | 0 | 1 | 297 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| HARKER ENERGY PARK LIMITED Harker 400kV Substation | gate | 0 | 1 | 250 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| EPPING ENERGY PARK LIMITED Waltham Cross B 400kV Substation | gate | 0 | 1 | 250 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| RENEWCO POWER LIMITED LESSNESSOCK ENERGY PARK 132KV SUBSTATION | gate | 0 | 1 | 114 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| PERIGUS ENERGY UK LIMITED Seat Hill 132kV Substation | gate | 0 | 1 | 90 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | gate | 0 | 2 | 81 | gate up A firm connection right recorded where there was none. |
| BUCCLEUCH ESTATES, LTD. (THE) Drinkstone Hybrid 132/33kV substation | gate | 0 | 1 | 55 | gate Gate 1 recorded, a place in the process rather than a firm right. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | energised | 0.0 | 81.0 | 81 | energised Connected capacity recorded where there was none: a battery arriving, or a phase of one. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | mw | 119.0 | 34.0 | 81 | capacity down Contracted capacity cut. Usually a phase split into its own row, or a smaller offer accepted. Gate 2 arrived the same day, so this is the capacity in the offer. |
| SWANSEA NORTH GREEN NG LIMITED Swansea North 400kV Substation | date | 2028-10-31 | 2028-10-30 | 1,025 | date The contracted connection date moved by 1 day. A tidy-up of the date rather than a re-plan. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | date | 2026-04-24 | 2028-04-01 | 81 | slipped The contracted connection date moved later by a year and 11 months. Gate 2 arrived the same day, so this is the offer's date replacing the old one rather than a slip from a live plan. |
| PENCLOE WIND ENERGY LIMITED Pencloe 132/33kV Substation | status | Consents Approved | Built | 81 | built Recorded as built; the register's word rather than a meter reading. Connected capacity arrived on the same day. |
| Field Spittal Ltd Spittal 132kV Substation | site | Spittal 275kV Substation | Spittal 132kV Substation | 300 | voltage The same site at a different voltage, which is a different connection point, or a correction to which one. |
| GALILEO 09 LIMITED MID WALES CONNECTION NODE A 400KV SUBSTATION | site | Oswestry Substation | MID WALES CONNECTION NODE A 400KV SUBSTATION | 297 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
| RENEWCO POWER LIMITED LESSNESSOCK ENERGY PARK 132KV SUBSTATION | site | Lessnessock | LESSNESSOCK ENERGY PARK 132KV SUBSTATION | 114 | renamed The same connection point under a fuller name. |
| BUCCLEUCH ESTATES, LTD. (THE) Drinkstone Hybrid 132/33kV substation | site | Hawick 132kV Substation | Drinkstone Hybrid 132/33kV substation | 55 | point The register now names a different connection point. A move, a correction, or a project identifier reused; the ledger cannot tell which. |
25 August 2026
0 changes across 0 projects, 0 of them spelling only. 1,563 projects in the register, 426.7 GW contracted.
Nothing moved.