Vitreous LabsEnergy transparency
Sweden · the change ledger

Since 20 January 2023: 30 other changes.

No Swedish body publishes a list of batteries, so the list this site keeps by hand from the owners’ own releases is copied whenever it changes, and the difference between one copy and the one before is printed, battery by battery. Beneath it, Svenska kraftnät’s storage approved for each reserve product, read by read, and its connection queue. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.

6captures held across 2 lists, the oldest from 20 January 2023
0batteries entered a list, 0 MW
0left a list
30other changes that moved something; 0 more were respellings or refilings

By month

MonthEnteredMW enteredLeftOther changesRespelt or refiled
October 20260·08·
January 20260·08·
January 20250·06·
January 20240·08·

Where this can be wrong

The list is kept by hand, so a battery enters it when a source is found, which can be long after the battery started; the date of a change here is the date the list changed, never the date the battery did. A rise in Svenska kraftnät’s approved storage counts storage tested and approved, and one battery counts under every product it may sell, so the count can rise with no new battery built.

The whole ledger as a CSV.

The list of batteries their owners name

A battery enters when a source first names it and leaves only if a source says it was dropped; a change of status is the owner’s own word, read from a later release. The list is kept by hand, so a copy is taken whenever it changes. 1 capture held, 25 October 2026 to 25 October 2026.

One capture so far. The next read starts this ledger.

Svenska kraftnät’s prequalified storage, product by product

SvK publishes the storage prequalified for each reserve product about quarterly and keeps the past only once a year, on 1 January; each read is kept here. A rise is storage SvK has tested and approved for the product, and one battery is counted under every product it is approved for, so a rise can come with no new battery built. 5 captures held, 20 January 2023 to 1 October 2026.

1 October 2026, against 1 January 2026

8 changes.

BatteryWhat changedFromToMWOur reading
Storage prequalified for mFRR up
mFRR up
prequalified, MW119017551,755up by 565
Storage prequalified for FCR-D up
FCR-D up
prequalified, MW125017301,730up by 480
Storage prequalified for mFRR down
mFRR down
prequalified, MW113016901,690up by 560
Storage prequalified for FCR-D down
FCR-D down
prequalified, MW118016801,680up by 500
Storage prequalified for FFR
FFR
prequalified, MW830960960up by 130
Storage prequalified for FCR-N
FCR-N
prequalified, MW460740740up by 280
Storage prequalified for aFRR up
aFRR up
prequalified, MW10170170up by 160
Storage prequalified for aFRR down
aFRR down
prequalified, MW10170170up by 160

1 January 2026, against 1 January 2025

8 changes.

BatteryWhat changedFromToMWOur reading
Storage prequalified for FCR-D up
FCR-D up
prequalified, MW61012501,250up by 640
Storage prequalified for mFRR up
mFRR up
prequalified, MW12011901,190up by 1,070
Storage prequalified for FCR-D down
FCR-D down
prequalified, MW57011801,180up by 610
Storage prequalified for mFRR down
mFRR down
prequalified, MW12011301,130up by 1,010
Storage prequalified for FFR
FFR
prequalified, MW300830830up by 530
Storage prequalified for FCR-N
FCR-N
prequalified, MW130460460up by 330
Storage prequalified for aFRR up
aFRR up
prequalified, MW01010up by 10
Storage prequalified for aFRR down
aFRR down
prequalified, MW01010up by 10

1 January 2025, against 1 January 2024

6 changes.

BatteryWhat changedFromToMWOur reading
Storage prequalified for FCR-D up
FCR-D up
prequalified, MW80610610up by 530
Storage prequalified for FCR-D down
FCR-D down
prequalified, MW60570570up by 510
Storage prequalified for FFR
FFR
prequalified, MW60300300up by 240
Storage prequalified for FCR-N
FCR-N
prequalified, MW10130130up by 120
Storage prequalified for mFRR up
mFRR up
prequalified, MW5120120up by 115
Storage prequalified for mFRR down
mFRR down
prequalified, MW20120120up by 100

1 January 2024, against 20 January 2023

8 changes.

BatteryWhat changedFromToMWOur reading
Storage prequalified for FCR-D up
FCR-D up
prequalified, MW108080up by 70
Storage prequalified for FFR
FFR
prequalified, MW406060up by 20
Storage prequalified for FCR-D down
FCR-D down
prequalified, MW56060up by 55
Storage prequalified for mFRR down
mFRR down
prequalified, MW·2020changed
Storage prequalified for FCR-N
FCR-N
prequalified, MW01010up by 10
Storage prequalified for mFRR up
mFRR up
prequalified, MW·55changed
Storage prequalified for aFRR up
aFRR up
prequalified, MW·00changed
Storage prequalified for aFRR down
aFRR down
prequalified, MW·00changed

Svenska kraftnät’s queue, as of 1 October 2026

Storage waiting in Svenska kraftnät’s own connection queue until capacity is reserved: 2,260 MW asking to feed in and 2,176 MW asking to draw out. SvK publishes the figure quarterly and keeps no history, so each read is saved under se/svk/connection/ and compared with the one before as it comes. Beneath, the capacity SvK has reserved each year for all kinds of plant, from its own table.

Year of the advance decisionReserved for generation, MWReserved for consumption, MW
20263,009780
20251,1703,695
20241,1421,923
20233,045715
20221,1003,532
20211,219241
20204881,050