315 MW of batteries run commercially in Poland, 273 MW more is switched on, and 2.1 GW is being built
59 batteries of 1 MW and more, each with its status on 20 October 2026 and the dated source for it. 2,034 MWh is running or switched on; 8,199 MWh is being built.
No Polish body lists the batteries that are running, and none lists those being built. This register does, one battery at a time: who owns it, where it is, which grid it joins and where, its power and energy, who supplied and built it, its capacity contract, grant, trader and lenders, and every date from the connection agreement to commercial operation. It starts from the storage registers Tauron and Enea keep under the Energy Law and the four connection lists, joins URE’s capacity results unit by unit, and adds what owners, lenders, suppliers and the trade press have published. Every fact carries its link. The whole register as a CSV.
Of the capacity batteries owe from January 2028, 65% is running or being built and 29% has only a building permit behind it; from 2029, 16% is running or being built
A capacity contract is a promise to be available from 1 January of its first delivery year, with penalties for a unit that is not. Each bar is the obligation batteries won for that year, split by the furthest step the battery behind it has visibly reached: running, being built, financed, or a building permit issued to the contract holder and nothing since. For 2029, 7% is financed and not started, 25% has a permit only, and for 51% nothing has been found at all. A four-hour battery takes a year or more to build, and January 2028 is fourteen months away.
Running or switched onBeing builtFinanced, not startedBuilding permit onlyNothing found
| First delivery year | Units | Obligation, MW | Running or on | Being built | Financed | Permit only | Nothing found |
|---|---|---|---|---|---|---|---|
| 2027 | 5 | 165 | 4 | 145 | 0 | 0 | 16 |
| 2028 | 33 | 1,734 | 366 | 765 | 0 | 501 | 101 |
| 2029 | 78 | 2,480 | 19 | 386 | 186 | 632 | 1,257 |
| 2030 | 57 | 685 | 7 | 40 | 0 | 45 | 592 |
MW of de-rated capacity obligation, URE’s final results; batteries counted unit by unit as on the capacity page. A unit counts as running, built or financed when the register matches it by its unit code; as permit only when its contract holder is named as investor in a battery building permit in GUNB’s register, matched by company name. A unit can be under way without a public report, so the hatched share is the most it could be, not the least.
The 28 units owing capacity in 2027 or 2028 that are not visibly being built, 619 MW of obligation
| From | Unit | Contract holder | Obligation, MW | Four-hour MW | Building permit to the holder |
|---|---|---|---|---|---|
| 2027 | JRM/777 | Battery ESS-1 sp. z o.o. | 9.2 | 9.68 | none found |
| 2027 | JRM/774 | PKE Pomorze sp. z o.o. | 6.65 | 7 | none found |
| 2028 | JRM/985 | Grand Solar 23 sp. z o.o | 131 | 138 | Brzeziny, 2 April 2026; Brzeziny, 14 July 2026 |
| 2028 | JRM/982 | G Solar Energy 2 sp. z o.o. | 84 | 89 | Klonówiec, 10 July 2026 |
| 2028 | JRM/983 | Grand Solar 23 sp. z o.o | 84 | 89 | Brzeziny, 2 April 2026; Brzeziny, 14 July 2026 |
| 2028 | JRM/967 | Grand Solar 14 sp. z o.o. | 61 | 64 | Ruda Śląska, 13 July 2026 |
| 2028 | JRM/405 | Encos sp. z o.o. | 46 | 48 | Konin, 9 July 2024; Konin, 22 December 2025 |
| 2028 | JRM/1155 | Claritas Polska Ventures IV sp. z o.o. | 8.42 | 8.86 | Garwolin, 20 November 2025 |
| 2028 | JRM/1250 | RENEGIA BULLA sp. z o.o. | 7.4 | 7.79 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1177 | FRV PSH 13 sp. z o.o. | 6.65 | 7 | Wrocław, 14 April 2026 |
| 2028 | JRM/1247 | RENEGIA BULLA sp. z o.o. | 6.6 | 6.95 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1274 | MEWRO sp. z o.o. | 5.7 | 6 | Wrocław, 8 September 2026 |
| 2028 | JRM/931 | RENEGIA BULLA sp. z o.o. | 5.7 | 6 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/932 | RENEGIA BULLA sp. z o.o. | 5.7 | 6 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1257 | FRV PSH 1 sp. z o.o. | 5.61 | 5.91 | Legnica, 29 January 2025; Legnica, 2 April 2026 |
| 2028 | JRM/966 | NRG 21 sp. z o.o. | 5.42 | 5.7 | Bąków, 29 October 2024; Strumień, 3 March 2026 |
| 2028 | JRM/1242 | FRV PSH 15 sp. z o.o. | 4.91 | 5.17 | Zamość, 30 September 2024; Zamość, 4 March 2026 |
| 2028 | JRM/968 | NRG 21 sp. z o.o. | 4.78 | 5.04 | Bąków, 29 October 2024; Strumień, 3 March 2026 |
| 2028 | JRM/922 | RENEGIA BULLA sp. z o.o. | 4.5 | 4.74 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1171 | RENEGIA BULLA sp. z o.o. | 4.5 | 4.74 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/929 | RENEGIA BULLA sp. z o.o. | 4.4 | 4.63 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1181 | NEO ENERGY PROJECT I sp. z o.o. | 3.8 | 4 | Kędzierzyn-Koźle, 9 May 2025; Kędzierzyn-Koźle, 28 July 2026 |
| 2028 | JRM/951 | RENEGIA BULLA sp. z o.o. | 3.8 | 4 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/930 | RENEGIA BULLA sp. z o.o. | 2.8 | 2.95 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/933 | RENEGIA BULLA sp. z o.o. | 2.5 | 2.63 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/946 | RENEGIA BULLA sp. z o.o. | 1.9 | 2 | Skarbimierz-Osiedle, 30 December 2024; Opole, 31 March 2025 |
| 2028 | JRM/1148 | GREENVOLT POWER TRADING sp. z o.o. | 95 | 100 | none found |
| 2028 | JRM/1190 | FRV PSH 11 sp. z o.o. | 6.31 | 6.64 | none found |
The two owing from 1 January 2027, Battery ESS-1 and PKE Pomorze, are the ones to check first: their delivery year starts in ten weeks, and no permit in either name has been found.
If every owner’s date holds, Poland will have about 2.0 GW of batteries by the end of 2027 and 3.5 GW by the end of 2028
Each battery by the year its owner or the press says it will start commercial operation, split by its status today. A date said by an owner is a plan; several here have slipped already, and the ones only financed are the least certain. A date given as the turn of two years is counted in the later one.
Running or switched onBeing builtFinanced, not started
MW of battery power, and the number of batteries, by the year in each row’s commercial operation column, as worded in the table below. The two largest batteries in each year are named.
Where they are
One circle per battery, sized by its power, at the land parcel of its building permit in GUNB’s register. 19 of 59 placed; the rest have no permit found in their owner’s name, or one whose land GUGiK could not place.
Every battery, with everything found
Open a battery for all forty facts and the link for each. “Not found” means searched for and not published anywhere this register could read.
| Battery | Owner | Place | MW | MWh | Status | Commercial operation | Capacity contract |
|---|---|---|---|---|---|---|---|
| Turośń Kościelna | Greenvolt Power | Turośń Kościelna, podlaskie | 200 | 800 | Running | Jul 2026 | JRM/1146 from 2028 |
| Stary Grodków | EDF power solutions | Skoroszyce, opolskie | 50 | 120 | Running | May 2026 | JRM/885 from 2028 |
| Nowe Czarnowo I | Energix Group | Gryfino, zachodniopomorskie | 24 | 56 | Running | · | JRM/1630 from 2029 |
| Łozienica | NGEN | Goleniów, zachodniopomorskie | 9.4 | 19 | Running | 3 Apr 2026 | · |
| Bystra hybrid | Energa | pomorskie | 6 | 27 | Running | Apr 2021 | JRM/747 from 2027 |
| Garbce traction | PGE Energetyka Kolejowa | dolnośląskie | 5.5 | 1.2 | Running | 2021 | · |
| Herby | R.Power | Herby, śląskie | 5 | 10 | Running | from 28 Jul 2026 | JRM/1253 from 2029 |
| Tauron Przewóz | Tauron Polska Energia | Kraków, małopolskie | 4 | 16 | Running | Feb 2026 | JRM/1404 from 2029 |
| Tauron Dąbie | Tauron Polska Energia | Kraków, małopolskie | 4 | 16 | Running | Feb 2026 | JRM/1405 from 2029 |
| Cieszanowice | Tauron | Kamiennik (from the permit’s parcel) | 3.33 | 0.77 | Running | 2022 | · |
| Rzepedź | PGE | podkarpackie | 2.1 | 4.2 | Running | Dec 2020 | · |
| Czernikowo | Energa | Czernikowo, kujawsko-pomorskie | 1 | 2 | Running | Sep 2022 | · |
| Nehrybka hybrid | R.Power | podkarpackie | 1 | 2 | Running | · | · |
| Ełk | Greenvolt Power | Ełk, warmińsko-mazurskie | 200 | 800 | Switched on | expected Q4 2026 | JRM/1157 from 2028 |
| Nowe Czarnowo II | Energix Group | Gryfino, zachodniopomorskie | 25 | 71 | Switched on | · | · |
| Zawiercie | not found | Zawiercie, śląskie | 9.82 | 20 | Switched on | · | JRM/1153 from 2028 |
| Tauron Proszówek | Tauron Polska Energia | Grębocice, dolnośląskie | 9.5 | 20 | Switched on | planned Q3 2026 | JRM/2150 |
| Tauron Kuźnia Raciborska | Tauron Polska Energia | Kuźnia Raciborska, śląskie | 6.9 | 28 | Switched on | planned Q3 2026 | JRM/1428 from 2029 |
| Stawiszyn hybrid PV and battery | TK Power | wielkopolskie | 5.04 | · | Switched on | · | · |
| Września | R.Power | Września, wielkopolskie | 5.01 | 5.01 | Switched on | · | · |
| Bytnica | WB Energy | Bytnica, lubuskie | 3.08 | · | Switched on | · | · |
| Opole | Renegia | Opole, opolskie | 2.04 | 4.07 | Switched on | · | · |
| Kunice | Solar Technics | Kunice, dolnośląskie | 2.03 | 4.06 | Switched on | · | · |
| Bydgoszcz tram-company | Miejskie Zakłady Komunikacyjne w Bydgoszczy | Bydgoszcz, kujawsko-pomorskie | 1.2 | 4.18 | Switched on | · | · |
| Goczałkowice-Zdrój | JAK Szkło Żogała | Goczałkowice-Zdrój, śląskie | 1 | 2 | Switched on | · | · |
| Gliwice | Śląskie Centrum Logistyki S.A. | Gliwice, śląskie | 1 | 2.12 | Switched on | · | · |
| Ceków hybrid PV and battery | Domagała Nieruchomości | wielkopolskie | 1 | · | Switched on | · | · |
| Siedlce | Greenvolt Power | Zbuczyn (from the permit’s parcel), mazowieckie | 600 | 2,400 | Being built | targeted end-2027 | JRM/1154 from 2028 |
| Dzięgielewo | R.Power | Stara Biała (from the permit’s parcel), mazowieckie | 300 | 1,200 | Being built | turn of 2027/2028 | JRM/2407 from 2030 |
| Żarnowiec | PGE Polska Grupa Energetyczna | Krokowa (Kartoszyno, from PSE row name; confirm), pomorskie | 262 | 981 | Being built | planned Q2 2027 | JRM/602 from 2029 |
| Gdańsk II | R.Power | Gdańsk, pomorskie | 250 | 1,000 | Being built | turn of 2027/2028 | JRM/1513 from 2029 |
| Mieczysławów | Northland Power | Ślesin (from the permit’s parcel), wielkopolskie | 200 | 800 | Being built | 2028 | JRM/1150 from 2028 |
| Jedwabno | R.Power | Lubicz, kujawsko-pomorskie | 150 | 300 | Being built | grid connection planned Dec 2026 | JRM/1255 from 2029 |
| Trzebinia | DRI; Actis to acquire on completion | Trzebinia (name) or Chrzanów (Columbus 2024 article): see disagreements, małopolskie | 133 | 622 | Being built | planned early 2027 | JRM/730 from 2027 |
| Kamionka | Northland Power | wielkopolskie | 100 | 400 | Being built | 2028 | JRM/1149 from 2028 |
| Lwówek Śląski | Green Capital S.A. and Prime Capital AG, joint venture | Lwówek Śląski, dolnośląskie | 80 | 320 | Being built | planned Q3 2027 | JRM/1133 from 2029 |
| Osiek Jasielski | OX2 | Osiek Jasielski, podkarpackie | 50 | 120 | Being built | 2027 | JRM/758 from 2027 |
| Bydgoszcz | Tavion | Bydgoszcz, kujawsko-pomorskie | 20 | 40 | Being built | grid connection expected 2027 | · |
| Puławy | RelyAssets | Puławy, lubelskie | 4 | 16 | Being built | planned Sept 2026 | · |
| Gryfino | PGE Polska Grupa Energetyczna | Gryfino, zachodniopomorskie | 400 | 800 | Financed, not started | planned end-2028 | JRM/1165 from 2029 |
| Zwartowo III PV and battery | Respect Energy | Choczewo (Zwartowo village; confirm), pomorskie | 184 | · | Financed, not started | · | · |
| Tauron Laryszów | Tauron Polska Energia | śląskie | 84 | 358 | Financed, not started | planned Q4 2028 | JRM/1413 from 2029 |
| Tauron hybrid Ogrodzieniec | Tauron Polska Energia | Ogrodzieniec, śląskie | 55 | 237 | Financed, not started | planned Q3 2028 | · |
| Tauron Bałków | Tauron Polska Energia | świętokrzyskie | 54 | 242 | Financed, not started | planned Q3 2027 | · |
| Tauron Dąbrowa Środkowa | Tauron Polska Energia | dolnośląskie | 45 | 192 | Financed, not started | planned Q2 2028 | · |
| Tauron Twardogóra | Tauron Polska Energia | Twardogóra, dolnośląskie | 42 | 179 | Financed, not started | planned Q4 2028 | · |
| Tauron hybrid Stare Bogaczowice I | Tauron Polska Energia | Stare Bogaczowice, dolnośląskie | 30 | 134 | Financed, not started | planned Q3 2028 | · |
| Tauron Bytom | Tauron Polska Energia | Bytom, śląskie | 18 | 77 | Financed, not started | planned Q4 2028 | JRM/1415 from 2029 |
| Trześń | Not confirmed | podkarpackie | 16 | 65 | Financed, not started | planned Q1 2027 | · |
| CLIP logistics centre near Poznań | Grupa CLIP | Swarzędz (from the permit’s parcel), wielkopolskie | 8 | 20 | Financed, not started | · | · |
| Przeworsk | LC Energia | Przeworsk, podkarpackie | 8 | 16 | Financed, not started | planned turn of Q1/Q2 2027 | · |
| Tauron Radlna Tarnowiec | Tauron Polska Energia | małopolskie | 6 | · | Financed, not started | planned Q2 2027 | JRM/1398 from 2029 |
| Warzyce | BESS-Group | podkarpackie | 5 | 10 | Financed, not started | · | · |
| Niegłowice | BESS-Group | podkarpackie | 5 | 10 | Financed, not started | · | · |
| Krotoszyn PV-coupled | Not confirmed | Krotoszyn, wielkopolskie | 5 | 25 | Financed, not started | planned Q1 2027 | · |
| Tauron Baranowice | Tauron Polska Energia | śląskie | 3.9 | · | Financed, not started | planned Q4 2028 | · |
| Tauron Pilchowice | Tauron Polska Energia | dolnośląskie | 2 | · | Financed, not started | planned Q2 2028 | JRM/1403 from 2029 |
| Luboń | Tavion | Luboń, wielkopolskie | · | · | Financed, not started | grid connection expected 2027 | · |
| Third Tavion park | Tavion | · | · | · | Financed, not started | · | · |
Running
Turośń Kościelna BESS · Running · 200 MW
Who
- Owner
- Greenvolt Power (Greenvolt Group, owned by KKR)
- Project company
- Magazyn EE Turośń Kościelna sp. z o.o. (KRS/NIP not found); capacity contract held by GREENVOLT POWER ADVISORY sp. z o.o., NIP 5214026608
- Developer
- Greenvolt Power
- Also called
- MEE Turośń Kościelna (PSE queue and capacity-market unit name); Magazyn Energii Elektrycznej Turośń Kościelna
Where
- Gmina
- Turośń Kościelna
- Powiat
- białostocki
- Voivodeship
- podlaskie
- Coordinates
- 53.03204, 23.04435 (the land parcel of building permit ST-PD-BI/WNIOSEK/4642/2023 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE (transmission; 110 kV side of the Narew substation)
- Connection, kV
- 110
- Connection point
- Narew (PSE)
What
- Power, MW
- 200
- Energy, MWh
- 800
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- BYD Energy Storage, 196 LFP enclosures; 49 container transformer stations; general contractor P&Q
Money
- Capacity unit
- JRM/1146
- Capacity obligation, MW
- 170
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 178.9
- Other capacity contracts
- 2027 additional (quarterly) auctions: 180.5 MW in each of Q1-Q4 2027
- Grant
- €43.25m (189,283,710 zł). NFOŚiGW Modernisation Fund storage call (FM): grant recommended on the ranking list of 10 Dec 2025 (total cost 495,973,317 zł); signing of the agreement not confirmed in sources read
- Trader, optimiser or toll
- Statkraft 10-year tolling agreement for Turośń and Ełk (400 MW), announced 29 Sep 2026; Entrix optimisation deal (exclusive, Sept 2025) continues through Entrix cooperation with Statkraft
- Financing
- UniCredit: €153m bridge facility plus €65m guarantee line, shared with Ełk (Aug 2026). EBRD project 55427: up to €60m senior loan for Turośń and Ełk, approval date 17 Jun 2026 (signing not confirmed). IFC project 50763: up to €75m own account plus €80m parallel loans, pending approval as of Dec 2025
When
- Connection agreement signed
- 2021-11-03
- Connection date in the agreement
- 2026-07-30
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2026-07 (inaugurated 2026-07-30)
Evidence
- Why this status
- Inaugurated 30 Jul 2026 (Greenvolt press release; energy-storage.news 31 Jul 2026). Energy-storage.news (24 Sep and 5 Oct 2026) says it entered commercial operation in July 2026.
- Its row in the connection lists
- PSE art. 7 ust. 8l list (31 Aug 2026): "MEE Turośń Kościelna", applicant Magazyn EE Turośń Kościelna sp. z o.o., Narew 110 kV, 294 MW (charge 294 MW), agreement 2021-11-03, start of delivery 2026-07-30. Matched by name and project company.
- How the contract was matched
- By unit name "MEE Turośń Kościelna" in URE final list, 2028 main auction.
- Where sources disagree
- PSE queue row is for 294 MW against 200 MW built. The PSE list of 31 Aug 2026 still shows the agreement in force, not "connected", although its delivery start date (30 Jul 2026) has passed. IFC had planned construction completion for June 2026.
- Still missing
- Coordinates (OSM or Geoportal parcel search). KRS and NIP of the project company (KRS search by name). Energisation date and PSE balancing qualification date (Greenvolt or PSE). Construction start date (Greenvolt press archive). Whether the NFOŚiGW grant agreement was signed (NFOŚiGW list of signed agreements). Whether the EBRD and IFC loans were signed (EBRD PSD status, IFC disclosure page).
Sources. status (energy-storage.news); cod (energy-storage.news); cm (power.greenvolt.com); financing (gramwzielone.pl); toll (energy-storage.news); ebrd (ebrd.com); powiat (disclosures.ifc.org); grant (gov.pl); queue (pse.pl); cm (ure.gov.pl); cm q2027 (ure.gov.pl); substation (gramwzielone.pl); site (wyszukiwarka.gunb.gov.pl)
Stary Grodków BESS · Running · 50 MW
Who
- Owner
- EDF power solutions (EDF group)
- Project company
- ME Stary Grodków sp. z o.o., KRS 0000959915, NIP 5223220959 (Tauron register); capacity contract supplier in URE list: Respect Energy S.A., NIP 8762459238
- Developer
- EDF power solutions Polska
- Also called
- Magazyn Energii Stary Grodków (capacity-market unit name); "Stare Grodkowo" in the 20 Oct 2026 Respect Energy article
Where
- Gmina
- Skoroszyce
- Powiat
- nyski
- Voivodeship
- opolskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 110
- Connection point
- GPZ Grodków (Tauron queue code GDK3)
What
- Power, MW
- 50
- Energy, MWh
- 120
- Hours at full power
- 2.40
- Kind
- standalone, front-of-meter, 110 kV distribution
- Cells, integrator and builder
- Sungrow: 24 PowerTitan 2.0 units and 12 MVS5140 medium-voltage stations; EPC not named
Money
- Capacity unit
- JRM/885
- Capacity obligation, MW
- 22.56
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 23.7
- Other capacity contracts
- 2027 additional auctions: 23.906 MW in Q1 and Q4 2027
- Grant
- not found
- Trader, optimiser or toll
- Respect Energy: commercial balancing, auxiliary supply, balancing service provider, day-ahead/intraday/balancing optimisation and capacity-market compliance (agreement reported 20 Oct 2026; length not stated)
- Financing
- not found
When
- Connection agreement signed
- 2023-11-24
- Connection date in the agreement
- 2026-05-13
- Building started
- 2025-06 (construction announced 4 Jun 2025)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2026-05 (register: storage activity from 2026-05-13)
Evidence
- Why this status
- Gramwzielone 20 May 2026: the plant has started operating. Tauron register gives storage activity from 13 May 2026; Tauron queue shows the object connected.
- Its row in the connection lists
- Tauron queue (30 Jun 2026): station GDK3, 110 kV, storage 50 MW out / 50 MW in, 60.2 MW, status "connected", agreement 2023-11-24, start 2026-05-13. Matched by station code, size and register date (applicant is anonymised as "Osoba prawna").
- How the contract was matched
- By unit name "Magazyn Energii Stary Grodków" in URE 2028 main list.
- Where sources disagree
- Size: 50 MW / 120 MWh (EDF, gramwzielone, register 120.36 MWh) vs 50 MW / 100 MWh and two-hour duration (gramwzielone 20 Oct 2026). Register installed power 60.192 MW with 50 MW discharge; ESS News says 60 MW installed, 50 MW grid connection. The URE list names Respect Energy, not an EDF company, as capacity supplier.
- Still missing
- Coordinates. EPC contractor (EDF or Sungrow press). Energisation date (planned Oct-Nov 2025 per June 2025 article; actual not found). Financing (EDF balance sheet assumed, not confirmed). PSE balancing qualification (Respect Energy). Which MWh figure is right: 100 or 120 (ask EDF; register says 120.36).
Sources. status (gramwzielone.pl); register (tauron-dystrybucja.pl); queue (tauron-dystrybucja.pl); equipment (ess-news.com); construction (gramwzielone.pl); optimiser (gramwzielone.pl); completion (energy-storage.news); cm (ure.gov.pl); cm q2027 (ure.gov.pl)
Nowe Czarnowo I BESS · Running · 24 MW
Who
- Owner
- Energix Group (Energix Polska)
- Project company
- Capacity contract holder: ENERGIX POLSKA sp. z o.o. BESS NOWE CZARNOWO I MANAGEMENT sp. j., NIP 5273070108
- Developer
- Energix Polska
- Also called
- ME Nowe Czarnowo I S059 (capacity-market unit); EP PL BESS Nowe Czarnowo I
Where
- Gmina
- Gryfino
- Powiat
- gryfiński
- Voivodeship
- zachodniopomorskie
- Coordinates
- not found
- Grid operator
- Not stated (near PSE Krajnik substation; connection costs to PSE grid mentioned by Axpo)
- Connection, kV
- not found
- Connection point
- near Krajnik (PSE)
What
- Power, MW
- 24
- Energy, MWh
- 56
- Hours at full power
- 2.33
- Kind
- standalone, front-of-meter, co-located with Energix wind and PV at Krajnik
- Cells, integrator and builder
- System integrator Diotech (Estonia); SMA and LG Energy Solution technology; Energix built it
Money
- Capacity unit
- JRM/1630
- Capacity obligation, MW
- 8.52
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 13.9
- Other capacity contracts
- 2026 additional auctions: 13.359 MW in Q1 and Q4 2026; 2027 additional: 13.205 MW in Q1 2027
- Grant
- None (Nowe Czarnowo II grant application not recommended)
- Trader, optimiser or toll
- Axpo Polska: full optimisation, wholesale and balancing integration, capacity obligation; profit share (length not stated)
- Financing
- Santander Bank Polska (announced June 2025, per energy-storage.news)
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- 2025-10 (commissioning began late Oct 2025)
- Qualified for PSE’s balancing
- 2026-09 (PSE confirmed qualification and start of balancing services; gramwzielone 9 Sep 2026)
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 12 Jan 2026: operating, first URE storage concession. Gramwzielone 9 Sep 2026: first Polish battery to complete PSE qualification and provide balancing services.
- Its row in the connection lists
- No row found in the PSE list of 31 Aug 2026 or the distribution queues by name; probably connected through Energix wind-farm infrastructure (unconfirmed).
- How the contract was matched
- By unit name "ME Nowe Czarnowo I S059" and supplier name (URE 2029 main list).
- Where sources disagree
- 24 MW / 56 MWh (Energix, Axpo, gramwzielone) vs 28 MW (Modo, Apr 2026).
- Still missing
- Connection voltage, substation and grid operator (Energix; PSE register of storage does not list it). Project company KRS. Exact commissioning/COD date and URE concession date (URE concession register). Coordinates. Axpo contract length.
Sources. status (gramwzielone.pl); commissioning (gramwzielone.pl); concession (gramwzielone.pl); integrator (baltictimes.com); optimiser (axpo.com); financing (energy-storage.news); cm (ure.gov.pl); cm q2026 (ure.gov.pl); cm q2027 (ure.gov.pl); grant not recommended (gov.pl)
Łozienica BESS (Project Vistula) · Running · 9.4 MW
Who
- Owner
- NGEN (NGEN Energetske rešitve d.o.o., Slovenia)
- Project company
- NGEN 1 sp. z o.o., KRS 0001127239, NIP 7011222707
- Developer
- NGEN
- Also called
- Vistula; "Łozienica E32" in NFOŚiGW application
Where
- Gmina
- Goleniów
- Powiat
- goleniowski
- Voivodeship
- zachodniopomorskie
- Coordinates
- 53.52753, 14.79663 (the land parcel of building permit ST-ZP-GO/WNIOSEK/2339/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Enea Operator
- Connection, kV
- 15
- Connection point
- GPZ Łozienica, ZKP-SN Łozienica 6 no. 782892
What
- Power, MW
- 9.4
- Energy, MWh
- 18.8
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, medium voltage
- Cells, integrator and builder
- Tesla, five Megapack 2XL (LFP); EPC not named
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- NFOŚiGW FM application not recommended
- Trader, optimiser or toll
- Merchant; NGEN in-house trading (day-ahead and intraday arbitrage first, balancing later)
- Financing
- EBRD project 55451: up to €70m for five NGEN BESS incl. two in Poland, approved May 2026 (not stated that Łozienica is one of them)
When
- Connection agreement signed
- 2024-07-11
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2026-04-03 (Modo: commissioned 3 Apr 2026); register: storage activity from 2026-02-10
Evidence
- Why this status
- Gramwzielone 8 Apr 2026 and Balkan Green Energy News 3 Apr 2026: commissioned; Enea register entry 24 Mar 2026.
- Its row in the connection lists
- Enea queue: no. 25821/2023, NGEN 1 sp. z o.o., Łozienica SN field, agreement 2024-07-11 (MW parsed as 0.221, which looks like a parsing error). Matched by applicant name.
- How the contract was matched
- not found
- Where sources disagree
- 9.4 MW / 18.8 MWh (NGEN, press) vs 9.636 MW / 19.272 MWh (Enea register). Modo counts 9.4 MW.
- Still missing
- Coordinates. EPC. Whether it is in the EBRD-financed portfolio (EBRD PSD 55451 or NGEN). Balancing qualification date (NGEN/PSE). Check the Enea queue PDF row for the true MW.
Sources. register (operator.enea.pl); equipment (gramwzielone.pl); commissioned (balkangreenenergynews.com); ebrd (ebrd.com); ebrd approved (gramwzielone.pl); modo date (modoenergy.com); queue (operator.enea.pl); grant not recommended (gov.pl); site (wyszukiwarka.gunb.gov.pl)
Bystra hybrid BESS (Energa) · Running · 6 MW
Who
- Owner
- Energa (Orlen group)
- Project company
- Energa OZE (formerly Energa Wytwarzanie); capacity contract holder ENERGA WYTWARZANIE S.A., NIP 5932372895
- Developer
- Energa with PSE and Hitachi (NEDO)
- Also called
- Magazyn energii Bystra; Polish-Japanese NEDO project; capacity unit JRM/747
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- pomorskie
- Coordinates
- not found
- Grid operator
- Energa-Operator (assumed; at the Bystra wind farm)
- Connection, kV
- not found
- Connection point
- Bystra wind farm, near Pruszcz Gdański
What
- Power, MW
- 6
- Energy, MWh
- 27
- Hours at full power
- 4.50
- Kind
- co-located with a wind farm (hybrid)
- Cells, integrator and builder
- Hybrid: 1 MW lithium-ion (0.47 MWh) and 5 MW lead-acid (26.9 MWh); Japanese partners (Hitachi per Forsal); building contractor PBI Niewczas
Money
- Capacity unit
- JRM/747
- Capacity obligation, MW
- 3.79
- Contract years
- 7
- First delivery year
- 2027
- Four-hour equivalent, MW
- 4.0
- Other capacity contracts
- 2026 additional auction: 3.834 MW in Q4 2026
- Grant
- NEDO (Japan) co-funded pilot; amount not found
- Trader, optimiser or toll
- Energa
- Financing
- Energa / NEDO
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- 2018-11 (building contract signed)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2021-04 (handed over for operation early April 2021)
Evidence
- Why this status
- Forsal/WysokieNapiecie 6 Aug 2021: handed over for operation in early April 2021 after tests. Holds a Q4 2026 capacity contract as an existing unit.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- Gramwzielone 22 Dec 2022 says Energa's 2027 capacity unit is the hybrid store next to the Bystra wind farm; JRM/747 is Energa Wytwarzanie's only storage unit in that auction.
- Where sources disagree
- Gramwzielone (Dec 2022) said it would be connected to the national system after the pilot phase, so its grid status in 2021-2022 is unclear.
- Still missing
- Gmina and powiat (Bystra village, likely gmina Pruszcz Gdański: confirm). Connection voltage and point (Energa-Operator register, not captured). Current operating status (Energa).
Sources. status (forsal.pl); cm (gramwzielone.pl); construction (gramwzielone.pl); cm (ure.gov.pl); cm q2026 (ure.gov.pl)
Garbce traction BESS (PKP Energetyka) · Running · 5.5 MW
Who
- Owner
- PGE Energetyka Kolejowa (formerly PKP Energetyka)
- Project company
- PKP Energetyka S.A. (now PGE Energetyka Kolejowa S.A.)
- Developer
- PKP Energetyka with University of Zielona Góra, My-Soft, Impact Clean Power Technology, Elester-PKP
- Also called
- Mobi-Trak; traction energy storage at Garbce traction substation
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- PKP Energetyka (railway traction network)
- Connection, kV
- 3 (DC traction, assumed)
- Connection point
- Garbce traction substation, about 50 km from Wrocław
What
- Power, MW
- 5.5
- Energy, MWh
- 1.2
- Hours at full power
- 0.22
- Kind
- traction (railway DC network), not public AC grid
- Cells, integrator and builder
- Four containers, 4,240 Li-ion cells; My-Soft (Mobi-Trak), Impact Clean Power Technology, DC/DC converter
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- EU co-funding 45% of €4.4m (Railway Gazette)
- Trader, optimiser or toll
- Railway traction supply
- Financing
- EU grant plus PKP Energetyka
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2021 (official opening reported 6 Jul 2021)
Evidence
- Why this status
- Railway Gazette 6 Jul 2021: built, with photo of the official opening.
- Its row in the connection lists
- Not applicable.
- How the contract was matched
- not found
- Where sources disagree
- Energy: 1.2 MWh usable (Railway Gazette) vs 1.88 MWh total / 1.5 MWh usable (gramwzielone 15 Jun 2021). Power 5.5 MW (Railway Gazette) vs 5 MW (Railtech).
- Still missing
- Whether it counts as grid-scale for Vitreous (traction DC). Gmina. Current status (PGE Energetyka Kolejowa).
Sources. status (railwaygazette.com); mwh (gramwzielone.pl); mw (railtech.com)
Herby BESS · Running · 5 MW
Who
- Owner
- R.Power
- Project company
- Elektrownia PV 130 sp. z o.o., KRS 0001114935, NIP 5214076606
- Developer
- R.Power
- Also called
- Magazyn energii Herby (capacity-market unit); Magazyn Herby BESS
Where
- Gmina
- Herby
- Powiat
- lubliniecki
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 15
- Connection point
- 15 kV cable to client station CZZ35264, connected at cable joint ZK-SN CZZ30612 (register)
What
- Power, MW
- 5
- Energy, MWh
- 10
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, medium voltage
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1253
- Capacity obligation, MW
- 1.532
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 2.5
- Other capacity contracts
- T-1 2027 supplementary auction (Sept 2026): R.Power won 75.994 MW for Jedwabno and Herby together (split not published)
- Grant
- €0.35m (1,545,700.37 zł). NFOŚiGW FM: grant 1,545,700.37 zł plus loan 1,631,862.98 zł recommended (ranking 10 Dec 2025)
- Trader, optimiser or toll
- Entrix optimisation and trading on all relevant markets (term not stated)
- Financing
- NFOŚiGW grant and loan (recommended); R.Power group funds
When
- Connection agreement signed
- 2024-08-14 (inferred Tauron match)
- Connection date in the agreement
- not found
- Building started
- 2025-Q4
- Switched on
- not found
- Qualified for PSE’s balancing
- qualification in progress (Oct 2026)
- Commercial operation
- register: storage activity from 2026-07-28; operating per 20 Oct 2026 article
Evidence
- Why this status
- Gramwzielone 20 Oct 2026: connected to the grid and started operating; balancing qualification in progress. Tauron register entry 10 Jul 2026.
- Its row in the connection lists
- Possible Tauron queue row: station HER3, SN, storage 5 MW out / 5 MW in, agreement 2024-08-14 (inferred from station code and size; applicant anonymised).
- How the contract was matched
- By unit name "Magazyn energii Herby" and NIP 5214076606 (same as register owner).
- Where sources disagree
- Register: 5.04 MW / 10.03 MWh vs 5 MW / 10 MWh. Register start date (28 Jul) is after first-entry date (10 Jul).
- Still missing
- Supplier and EPC (R.Power). Exact COD. Confirm Tauron queue row. Coordinates.
Sources. status (gramwzielone.pl); register (tauron-dystrybucja.pl); cm (ure.gov.pl); grant (gov.pl); queue (tauron-dystrybucja.pl); t1 2027 (biznesradar.pl)
Tauron BESS Przewóz (Kraków) · Running · 4 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Ekoenergia sp. z o.o., KRS 0000195546, NIP 6112502075 (register owner); capacity contract holder TAURON BME4 sp. z o.o., NIP 6343042745
- Developer
- Tauron (in-house)
- Also called
- BME Przewóz; ME Przewóz (capacity-market unit); register site "ST krp33900 Rybitwy"
Where
- Gmina
- Kraków
- Powiat
- Kraków
- Voivodeship
- małopolskie
- Coordinates
- 50.04111, 20.09744 (the land parcel of building permit ST-MA-KR/WNIOSEK/14947/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- not found
- Connection point
- ST krp33900 Rybitwy
What
- Power, MW
- 4
- Energy, MWh
- 16
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, on Tauron hydro-plant land
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1404
- Capacity obligation, MW
- 2.452
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 4.0
- Other capacity contracts
- Tauron won 14.155 MW of storage obligation in the T-1 2027 supplementary auction (units not named)
- Grant
- NFOŚiGW FM application not recommended (gramwzielone, parkiet)
- Trader, optimiser or toll
- Tauron group
- Financing
- Tauron balance sheet (assumed; not stated)
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2026-02 (handed over Feb 2026); register: storage activity from 2025-11-07
Evidence
- Why this status
- Tauron H1 2026 report via gramwzielone 24 Sep 2026: Dąbie and Przewóz operating, handed over in February 2026. Tauron register entry 13 Nov 2025.
- Its row in the connection lists
- Not matched (Tauron queue is anonymised; no row with this size found by station code).
- How the contract was matched
- By unit name "ME Przewóz" and Tauron SPV; 2.452 / 0.613 = 4.0 MW four-hour equivalent, matching 4 MW / 16 MWh.
- Where sources disagree
- Register: 4.41 MW installed / 4.0 MW discharge / 17.556 MWh, vs 4 MW / 16 MWh in Tauron statements. Register owner is TAURON Ekoenergia, capacity contract holder TAURON BME4. Register lists the site as Rybitwy; Tauron calls it Przewóz (adjacent Kraków districts); matched by Tauron press saying both Kraków units sit on hydro-plant land. Building permit for "BESS Przewóz" (GUNB ST-MA-KR/WNIOSEK/14947/2025) names TAURON BME4 sp. z o.o. as investor; the register lists the battery under TAURON Ekoenergia.
- Still missing
- Connection voltage (register point only). Equipment supplier and EPC (Tauron tender notices). Coordinates. Confirm Rybitwy = Przewóz with Tauron.
Sources. register (tauron-dystrybucja.pl); status (gramwzielone.pl); mwh (gramwzielone.pl); cm (ure.gov.pl); no grant (parkiet.com); site (wyszukiwarka.gunb.gov.pl)
Tauron BESS Dąbie (Kraków) · Running · 4 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Ekoenergia sp. z o.o., KRS 0000195546, NIP 6112502075 (register owner); capacity contract holder TAURON BME4 sp. z o.o., NIP 6343042745
- Developer
- Tauron (in-house)
- Also called
- BME Dąbie; ME Dąbie (capacity-market unit); register site "ST krp3695 Dąbie"
Where
- Gmina
- Kraków
- Powiat
- Kraków
- Voivodeship
- małopolskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- not found
- Connection point
- ST krp3695 Dąbie
What
- Power, MW
- 4
- Energy, MWh
- 16
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, on Tauron hydro-plant land
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1405
- Capacity obligation, MW
- 2.452
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 4.0
- Other capacity contracts
- Tauron T-1 2027 supplementary auction storage obligation 14.155 MW (units not named)
- Grant
- NFOŚiGW FM application not recommended
- Trader, optimiser or toll
- Tauron group
- Financing
- Tauron balance sheet (assumed; not stated)
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2026-02 (handed over Feb 2026); register: storage activity from 2025-11-25
Evidence
- Why this status
- Tauron H1 2026 report via gramwzielone 24 Sep 2026: operating, handed over Feb 2026. Tauron register entry 27 Nov 2025.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- By unit name "ME Dąbie" and Tauron SPV; four-hour equivalent 4.0 MW.
- Where sources disagree
- Register: 4.41 MW installed / 4.0 MW discharge / 17.556 MWh vs 4 MW / 16 MWh (Tauron).
- Still missing
- Connection voltage. Supplier/EPC. Coordinates.
Sources. register (tauron-dystrybucja.pl); status (gramwzielone.pl); mwh (gramwzielone.pl); cm (ure.gov.pl)
Cieszanowice BESS (Tauron Dystrybucja) · Running · 3.33 MW
Who
- Owner
- Tauron
- Project company
- TAURON Dystrybucja S.A.
- Developer
- Tauron Dystrybucja
- Also called
- Szklary 159A storage; POIiŚ demonstration project
Where
- Gmina
- Kamiennik (from the permit’s parcel)
- Powiat
- nyski
- Voivodeship
- not found
- Coordinates
- 50.58149, 17.17687 (the land parcel of building permit ST-OP-NY/WNIOSEK/8715/2021 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 15
- Connection point
- 110/15 kV station Cieszanowice, 15 kV switchgear field 13 (48-256 Szklary 159A)
What
- Power, MW
- 3.33
- Energy, MWh
- 0.774
- Hours at full power
- 0.23
- Kind
- DSO grid asset
- Cells, integrator and builder
- Lithium-titanate batteries; supplier not named
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €1.79m (7,851,880.81 zł). EU POIiŚ 2014-2020 (measure 1.4): 7,851,880.81 zł, 82.83% of eligible costs, agreement 13 Jun 2018
- Trader, optimiser or toll
- DSO grid asset (Tauron says it meets the fully-integrated-network-element test)
- Financing
- EU grant plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2022 (year built or commissioned)
Evidence
- Why this status
- URE Informacja 6/2026 (30 Jan 2026) lists it as an existing storage facility subject to consultation, built/commissioned 2022; charge and discharge 2,000 kW.
- Its row in the connection lists
- Not applicable.
- How the contract was matched
- not found
- Where sources disagree
- Installed 3,330 kW but maximum charge/discharge 2,000 kW. Gramwzielone (11 Feb 2026) misprinted it as 33 MW.
- Still missing
- Gmina/powiat for Szklary (48-256 is the Głuchołazy/Nysa area, Opolskie: confirm). Supplier. Outcome of URE consultation (URE BIP).
Rzepedź BESS (PGE) · Running · 2.1 MW
Who
- Owner
- PGE
- Project company
- PGE Dystrybucja / PGE Polska Grupa Energetyczna (project run jointly)
- Developer
- PGE
- Also called
- Magazyn energii Rzepedź
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 2.1
- Energy, MWh
- 4.2
- Hours at full power
- 2.00
- Kind
- DSO grid asset
- Cells, integrator and builder
- Tesla Powerpack; contractor Griffin Group Energy
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- Grid support (DSO asset)
- Financing
- PGE
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2020-12 (launch reported 9 Dec 2020)
Evidence
- Why this status
- Gramwzielone and Forsal, 9 Dec 2020: PGE launched the storage. No later report of closure found.
- Its row in the connection lists
- PGE Dystrybucja queue and register not captured.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Gmina (Rzepedź is in gmina Komańcza, powiat sanocki: confirm). Connection voltage. Whether still operating and whether URE treats it as a fully integrated grid element (PGE Dystrybucja register; URE decisions of 2023 on three PGE Dystrybucja units).
Czernikowo BESS (Energa-Operator) · Running · 1 MW
Who
- Owner
- Energa (Orlen group)
- Project company
- Energa-Operator S.A.
- Developer
- Energa-Operator
- Also called
- Magazyn energii w Czernikowie; RS Czernikowo
Where
- Gmina
- Czernikowo
- Powiat
- toruński
- Voivodeship
- kujawsko-pomorskie
- Coordinates
- not found
- Grid operator
- Energa-Operator
- Connection, kV
- 15
- Connection point
- RS Czernikowo (next to a 3.77 MW PV farm on 15 kV)
What
- Power, MW
- 1
- Energy, MWh
- 2
- Hours at full power
- 2.00
- Kind
- DSO grid asset
- Cells, integrator and builder
- Lithium-ion; supplier not named
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- EU POIiŚ 2014-2020 Smart Grid project (85% co-financing of the wider project; storage share not given)
- Trader, optimiser or toll
- DSO grid asset; URE decision of 19 Dec 2025 recognised it as a fully integrated network element
- Financing
- EU grant plus Energa-Operator
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- 2020-07 (construction start announced)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2022-09 (launch reported 30 Sep 2022)
Evidence
- Why this status
- Gramwzielone 30 Sep 2022: launched. URE Informacja 6/2026: URE decision of 19 Dec 2025 lets Energa-Operator keep and run it.
- Its row in the connection lists
- Not applicable.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Supplier. Connection voltage of the storage itself (PV is 15 kV). Gmina inferred from place name: confirm.
Sources. mw (gramwzielone.pl); construction (money.pl); ure (ure.gov.pl)
Nehrybka hybrid BESS (R.Power) · Running · 1 MW
Who
- Owner
- R.Power
- Project company
- not found
- Developer
- R.Power
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- przemyski
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja (assumed: Podkarpacie)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 1
- Energy, MWh
- 2
- Hours at full power
- 2.00
- Kind
- co-located with a PV farm (hybrid)
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- None (operating without public support)
- Trader, optimiser or toll
- Photon Energy: optimisation, balancing responsible party and balancing services (Aug 2025)
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 18 Mar 2026: operating commercially, providing system services and arbitrage.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Project company, gmina, connection, COD (R.Power). Powiat inferred ("near Przemyśl"): confirm.
Sources. mw (gramwzielone.pl); optimiser (energy-storage.news)
Switched on
Ełk BESS (Nowa Wieś Ełcka) · Switched on · 200 MW
Who
- Owner
- Greenvolt Power (Greenvolt Group, owned by KKR)
- Project company
- Magazyn EE Ełk sp. z o.o. (KRS/NIP not found); capacity contract held by GREENVOLT POWER ADVISORY sp. z o.o., NIP 5214026608
- Developer
- Greenvolt Power
- Also called
- MEE Ełk (PSE queue and capacity-market unit); BESS Ełk; Nowa Wieś Ełcka
Where
- Gmina
- Ełk
- Powiat
- ełcki
- Voivodeship
- warmińsko-mazurskie
- Coordinates
- not found
- Grid operator
- PSE
- Connection, kV
- 220 (temporary, via a 0.7 km line to an existing 220 kV line); planned 400 kV at Ełk Bis
- Connection point
- temporary tap on existing 220 kV line; later PSE Ełk Bis
What
- Power, MW
- 200
- Energy, MWh
- 800
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- BYD Energy Storage, 196 MC Cube-T units; general contractor P&Q
Money
- Capacity unit
- JRM/1157
- Capacity obligation, MW
- 170
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 178.9
- Other capacity contracts
- 2027 additional auctions: 180.5 MW in each of Q1-Q4 2027
- Grant
- at most about €48.89m (214,000,000 zł). KPO "Systemy magazynowania energii" grant: Żarnowiec and Ełk together 691 m zł; Żarnowiec alone "over 477 m zł", so Ełk is at most about 214 m zł (derived by subtraction, not published)
- Trader, optimiser or toll
- Statkraft 10-year tolling agreement (with Turośń), announced 29 Sep 2026; Entrix optimisation (Sept 2025)
- Financing
- UniCredit €153m bridge plus €65m guarantee line (with Turośń, Aug 2026); EBRD project 55427 up to €60m (approval date 17 Jun 2026, signing not confirmed); IFC project 50763 (pending approval Dec 2025)
When
- Connection agreement signed
- 2022-02-01
- Connection date in the agreement
- 2030-02-28
- Building started
- 2025-05 (road and substation works May-Sep 2025 per EBRD schedule)
- Switched on
- 2026-06-16 (voltage applied; module energisation began)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- expected Q4 2026
Evidence
- Why this status
- PSE chief executive, 16 Jun 2026 (gramwzielone 19 Jun 2026): voltage applied, energisation of modules begun. Energy-storage.news 5 Oct 2026: commercial operation targeted Q4 2026, not yet operational.
- Its row in the connection lists
- PSE list: "MEE Ełk", applicant Magazyn EE Ełk sp. z o.o., Ełk Bis 400 kV, 294 MW, agreement 2022-02-01, start of delivery 2030-02-28. Matched by name and company. The row is for the permanent 400 kV connection; the plant runs on a temporary 220 kV connection.
- How the contract was matched
- By unit name "MEE Ełk" (URE 2028 main list).
- Where sources disagree
- EBRD NTS: 200.6 MW and 842 MWh grid-side vs 200 MW / 800 MWh. EBRD planned commissioning for Sept 2026, IFC for April 2026. PSE queue gives 294 MW and 2030 for the permanent connection.
- Still missing
- Exact KPO grant for Ełk (NFOŚiGW KPO agreement list). KRS/NIP of SPV. Coordinates. Balancing qualification. COD (Greenvolt, expected Q4 2026).
Sources. energised (gramwzielone.pl); cod (energy-storage.news); ebrd nts (ebrd.com); ebrd psd (ebrd.com); ifc (disclosures.ifc.org); financing (gramwzielone.pl); kpo total (gramwzielone.pl); kpo zarnowiec (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl); cm q2027 (ure.gov.pl)
Nowe Czarnowo II BESS · Switched on · 25 MW
Who
- Owner
- Energix Group (Energix Polska)
- Project company
- not found
- Developer
- Energix Polska
- Also called
- Nowe Czarnowo 2
Where
- Gmina
- Gryfino
- Powiat
- gryfiński
- Voivodeship
- zachodniopomorskie
- Coordinates
- not found
- Grid operator
- not found
- Connection, kV
- not found
- Connection point
- near Krajnik (inferred from site name; unconfirmed)
What
- Power, MW
- 25
- Energy, MWh
- 71
- Hours at full power
- 2.84
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- NFOŚiGW FM application (63,757,188 zł cost) not recommended
- Trader, optimiser or toll
- Axpo and Energix partners in qualification (gramwzielone 9 Sep 2026)
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- in PSE qualification (Sept 2026)
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 9 Sep 2026: Nowe Czarnowo II has entered PSE qualification, which requires an energised unit. Energix site: expected 2026.
- Its row in the connection lists
- No queue row found by name.
- How the contract was matched
- No capacity contract found.
- Where sources disagree
- 25 MW / 71 MWh (gramwzielone) vs 52 MWh (Energix website, no MW).
- Still missing
- Owner company, connection point and voltage, energisation date, COD (Energix or Axpo). Which MWh figure is right. Coordinates.
Sources. status (gramwzielone.pl); energix (new.energix-group.com); grant (gov.pl)
Zawiercie BESS (BESS CM2) · Switched on · 9.82 MW
Who
- Owner
- not found
- Project company
- BESS CM2 sp. z o.o., KRS 0001053117, NIP 5223267719
- Developer
- not found
- Also called
- Magazyn Energii Zawiercie 1 (capacity-market unit)
Where
- Gmina
- Zawiercie
- Powiat
- zawierciański
- Voivodeship
- śląskie
- Coordinates
- 50.49909, 19.42438 (the land parcel of building permit ST-SL-ZE/WNIOSEK/21396/2024 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 15
- Connection point
- GPZ Argentyna, 15 kV switchgear, field 14
What
- Power, MW
- 9.823
- Energy, MWh
- 19.6
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, medium voltage
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1153
- Capacity obligation, MW
- 3.705
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 3.9
- Other capacity contracts
- 2027 additional auctions: 3.705 MW in Q1 and Q4 2027
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- 2024-01-29 (inferred Tauron match)
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- 2026-09 (register entry 2026-09-03; start date blank)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Tauron register entry 3 Sep 2026 (connected storage). No press report of operation.
- Its row in the connection lists
- Tauron queue: station ARG3, SN, storage 8.1 MW, agreement 2024-01-29 (inferred: station code ARG = Argentyna and 8.1 MW matches the register discharge 8.07 MW).
- How the contract was matched
- By NIP 5223267719 (same in register and URE list) and unit name.
- Where sources disagree
- Register: 9.823 MW installed, 8.07 MW discharge, 19.6 MWh.
- Still missing
- Owner group (KRS extract for BESS CM2 sp. z o.o.). Supplier, financing, optimiser, COD. Coordinates.
Sources. register (tauron-dystrybucja.pl); cm (ure.gov.pl); cm q2027 (ure.gov.pl); queue (tauron-dystrybucja.pl); site (wyszukiwarka.gunb.gov.pl)
Tauron BESS Proszówek · Switched on · 9.5 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- FF Park PV sp. z o.o., KRS 0000838530, NIP 9252131338 (register owner, Tauron group PV-farm company)
- Developer
- Tauron (in-house)
- Also called
- BME Proszówek; register owner FF Park PV sp. z o.o. at Kalinówka
Where
- Gmina
- Grębocice
- Powiat
- polkowicki
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 110
- Connection point
- 110 kV line field no. 9, 110/20/6 kV station Kalinówka
What
- Power, MW
- 9.5
- Energy, MWh
- 20.06
- Hours at full power
- 2.11
- Kind
- co-located with Tauron PV farm Proszówek
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- Same NIP holds JRM/2150 (FF PARK PV 1, 7.364 MW, 2030, 17 yrs), but its four-hour equivalent (55 MW) does not fit this battery; probably another unit (Proszówek II, 47 MW?)
- Grant
- not found
- Trader, optimiser or toll
- Tauron group
- Financing
- Tauron; capex 12.4 m zł (H1 2026 report)
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- 2026-07 (register: storage activity from 2026-07-09)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2026
Evidence
- Why this status
- Tauron register entry 26 Jun 2026, activity from 9 Jul 2026. Tauron H1 2026 report: 96% complete, completion Q3 2026.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- No confirmed match; see cm_other.
- Where sources disagree
- 8 MW / 16 MWh (Tauron, Dec 2025) vs 9.5 MW (Tauron H1 2026) vs 10 MW installed / 8 MW discharge / 20.064 MWh (register). Match of register row "FF Park PV, Grębocice, Kalinówka" to Tauron's "BESS Proszówek (gmina Grębocice, on a PV farm)" is by gmina and timing, not by name.
- Still missing
- Confirm FF Park PV = Tauron Proszówek (Tauron). Final MW/MWh. COD. Supplier. Coordinates.
Sources. register (tauron-dystrybucja.pl); status (gramwzielone.pl); mw (gramwzielone.pl); cm (ure.gov.pl)
Tauron BESS Kuźnia Raciborska · Switched on · 6.9 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME9 sp. z o.o., KRS 0001119369, NIP 6343042685
- Developer
- Tauron (in-house)
- Also called
- BME Kuźnia Raciborska; ME Kuźnia Raciborska (capacity-market unit)
Where
- Gmina
- Kuźnia Raciborska
- Powiat
- raciborski
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 15
- Connection point
- GPZ Kuźnia Raciborska 110/15 kV, 15 kV field 20 (Tauron code KUR3)
What
- Power, MW
- 6.9
- Energy, MWh
- 28
- Hours at full power
- 4.06
- Kind
- standalone, front-of-meter, medium voltage
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1428
- Capacity obligation, MW
- 3.978
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 6.5
- Other capacity contracts
- Tauron T-1 2027 storage obligation 14.155 MW (units not named)
- Grant
- €1.82m (7,968,064.60 zł). NFOŚiGW FM grant 7,968,064.60 zł (cost 22,955,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant plus Tauron; capex 15.3 m zł (H1 2026 report)
When
- Connection agreement signed
- 2024-12-13
- Connection date in the agreement
- 2026-06-26
- Building started
- not found
- Switched on
- 2026-06 (register: storage activity from 2026-06-26)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2026
Evidence
- Why this status
- Tauron register entry 11 Jun 2026, activity from 26 Jun 2026; Tauron queue shows it connected. Tauron H1 2026 report (gramwzielone 24 Sep 2026): 96% complete, completion Q3 2026. COD not reported.
- Its row in the connection lists
- Tauron queue: station KUR3, SN, storage 9 MW out / 6.9 MW in, status "connected", agreement 2024-12-13, start 2026-06-26. Matched by station code, MW and date.
- How the contract was matched
- By unit name "ME Kuźnia Raciborska" and NIP 6343042685 (same as register owner).
- Where sources disagree
- Register: 7.5 MW installed / 6.9 MW discharge / 30.096 MWh; Tauron Dec 2025: 6.9 MW / 28 MWh; NFOŚiGW grant release (energyglobal): 6.9 MW / 30 MWh.
- Still missing
- COD (Tauron Q3 2026 report). Supplier/EPC (Tauron tenders). Coordinates.
Sources. register (tauron-dystrybucja.pl); queue (tauron-dystrybucja.pl); status (gramwzielone.pl); mwh (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); cm (ure.gov.pl)
Stawiszyn hybrid PV+BESS (TK Power) · Switched on · 5.04 MW
Who
- Owner
- TK Power
- Project company
- TK Power sp. z o.o. (KRS/NIP not found)
- Developer
- TK Power
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- wielkopolskie
- Coordinates
- not found
- Grid operator
- Energa-Operator
- Connection, kV
- SN
- Connection point
- GPZ Stawiszyn
What
- Power, MW
- 5.04
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- hybrid PV (10.507 MW) + storage
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- None found for this site (TK Power holds 14 other NFOŚiGW grants, all for other sites)
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- 2025-03-29
- Connection date in the agreement
- after 30 Jun 2026 (as printed)
- Building started
- not found
- Switched on
- by 30 Jun 2026 (queue status "connected")
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Energa-Operator list (data to 30 Jun 2026, published 31 Aug 2026): status "UMOWA O PRZYŁĄCZENIE - obiekt przyłączony" (connected).
- Its row in the connection lists
- Energa queue P/22/087372: TK Power, GPZ Stawiszyn, SN, MIX, storage 6 MW out / 2.5 MW in, 5.04 MW, PV 10.507 MW, connected. Direct row.
- How the contract was matched
- not found
- Where sources disagree
- Storage figures in the row: discharge 6 MW, charge 2.5 MW, "mw" 5.04.
- Still missing
- Energy capacity, equipment, start of operation (TK Power or Energa-Operator register, not captured). Gmina (Stawiszyn, powiat kaliski: confirm).
Sources. queue (cdn-netpr.pl)
Września BESS (Elektrownia PV 99) · Switched on · 5.01 MW
Who
- Owner
- R.Power (Elektrownia PV-numbered companies are R.Power SPVs; ownership of PV 99 not confirmed)
- Project company
- ELEKTROWNIA PV 99 sp. z o.o., KRS 000097272 (as printed, digit missing), NIP 5213969302
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Września
- Powiat
- wrzesiński
- Voivodeship
- wielkopolskie
- Coordinates
- 52.32938, 17.61300 (the land parcel of building permit ST-WK-WR/WNIOSEK/3099/2026 in GUNB’s register, placed by GUGiK)
- Grid operator
- Enea Operator
- Connection, kV
- SN
- Connection point
- behind the PV farm meter ("instalacja zalicznikowa")
What
- Power, MW
- 5.0112
- Energy, MWh
- 5.015
- Hours at full power
- 1.00
- Kind
- co-located with PV (behind the generator meter)
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: start date given as 2022-05-23 (probably the PV farm)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-09-17); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- One-hour battery (5.0 MW / 5.0 MWh). Register KRS has 9 digits.
- Still missing
- Owner group (KRS extract). Storage commissioning date. Coordinates.
Sources. register (operator.enea.pl); site (wyszukiwarka.gunb.gov.pl)
Bytnica BESS (WB Energy) · Switched on · 3.08 MW
Who
- Owner
- WB Energy
- Project company
- WB Energy sp. z o.o., KRS 0000269806, NIP 9671471843
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Bytnica
- Powiat
- krośnieński
- Voivodeship
- lubuskie
- Coordinates
- 52.10709, 15.10771 (the land parcel of building permit ST-LB-KO/WNIOSEK/2987/2026 in GUNB’s register, placed by GUGiK)
- Grid operator
- Enea Operator
- Connection, kV
- 15
- Connection point
- 15 kV switchgear in 110 kV/MV station Bytnica
What
- Power, MW
- 3.084
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- unknown (WB Energy is a wind/PV developer; possibly co-located)
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: storage activity from 2026-08-01
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-08-13); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- Register gives 0.006 MWh, which cannot be right for a 3.084 MW battery; energy left blank.
- Still missing
- Energy capacity (Enea register correction or WB Energy). Stand-alone or hybrid. Coordinates.
Sources. register (operator.enea.pl); site (wyszukiwarka.gunb.gov.pl)
Opole BESS (Renegia 4) · Switched on · 2.04 MW
Who
- Owner
- Renegia (Opole developer; group unconfirmed)
- Project company
- Renegia 4 sp. z o.o., KRS 0000955211, NIP 7543348538
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Opole
- Powiat
- Opole
- Voivodeship
- opolskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- not found
- Connection point
- ZKSN no. OPC20985
What
- Power, MW
- 2.037
- Energy, MWh
- 4.0736
- Hours at full power
- 2.00
- Kind
- not found
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: storage activity from 2026-09-24
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-09-09); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Owner group; link to RENEGIA BULLA capacity units (11 units in Opole region, 2028 contracts, also 2026 quarterly contracts) not established; COD; connection voltage (KRS, Renegia).
Sources. register (tauron-dystrybucja.pl)
Kunice BESS (Solar Technics) · Switched on · 2.03 MW
Who
- Owner
- Solar Technics
- Project company
- Solar Technics sp. z o.o., KRS 0000518197, NIP 6912506034
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Kunice
- Powiat
- legnicki
- Voivodeship
- dolnośląskie
- Coordinates
- 51.19112, 16.34951 (the land parcel of building permit ST-DL-LE/WNIOSEK/788/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 20
- Connection point
- 20 kV overhead line LGL259
What
- Power, MW
- 2.032
- Energy, MWh
- 4.064
- Hours at full power
- 2.00
- Kind
- unknown (likely co-located with PV)
- Cells, integrator and builder
- Li-ion (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: storage activity from 2025-08-19
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2025-10-27); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- Register discharge power 0.995 MW, below 1 MW; installed 2.032 MW.
- Still missing
- Whether stand-alone or PV-coupled, supplier, COD, coordinates (Solar Technics). Its NFOŚiGW grant (2,008,227 zł) is for a different site, Piotrówek.
Sources. register (tauron-dystrybucja.pl); site (wyszukiwarka.gunb.gov.pl)
Bydgoszcz tram-company BESS (MZK) · Switched on · 1.2 MW
Who
- Owner
- Miejskie Zakłady Komunikacyjne w Bydgoszczy (municipal)
- Project company
- Miejskie Zakłady Komunikacyjne sp. z o.o., KRS 0000111252, NIP 5540314041
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Bydgoszcz
- Powiat
- bydgoski
- Voivodeship
- kujawsko-pomorskie
- Coordinates
- 53.10599, 17.98258 (the land parcel of building permit ST-KP-BD/WNIOSEK/10486/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Enea Operator
- Connection, kV
- SN
- Connection point
- behind the meter ("instalacja zalicznikowa"); queue: Bydgoszcz Błonie field 20
What
- Power, MW
- 1.2
- Energy, MWh
- 4.18
- Hours at full power
- 3.48
- Kind
- behind the meter (municipal transport)
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: start date given as 2002-05-10 (company date, not storage)
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-07-30); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Enea queue no. 62884/2024, MZK, Bydgoszcz Błonie field 20 behind the meter, storage 1.2 MW in / 2 MW, agreement 2025-11-27. Matched by applicant name.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Real start date of storage operation. Supplier.
Sources. register (operator.enea.pl); site (wyszukiwarka.gunb.gov.pl)
Goczałkowice-Zdrój BESS (JAK Szkło Żogała) · Switched on · 1 MW
Who
- Owner
- JAK Szkło Żogała
- Project company
- JAK SZKŁO ŻOGAŁA, KRS 0000012797, NIP 6381002475
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Goczałkowice-Zdrój
- Powiat
- pszczyński
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- not found
- Connection point
- ul. Brzozowa 62, 43-230 Goczałkowice-Zdrój
What
- Power, MW
- 1.001
- Energy, MWh
- 2.002
- Hours at full power
- 2.00
- Kind
- commercial/industrial, likely behind the meter
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: start date blank
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-09-15); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- Discharge power 0.861 MW.
- Still missing
- Whether behind the meter. Supplier. Start date.
Sources. register (tauron-dystrybucja.pl)
Gliwice BESS (Śląskie Centrum Logistyki) · Switched on · 1 MW
Who
- Owner
- Śląskie Centrum Logistyki S.A.
- Project company
- ŚLĄSKIE CENTRUM LOGISTYKI S.A., KRS 0000047612, NIP 6310000121
- Developer
- not found
- Also called
- not found
Where
- Gmina
- Gliwice
- Powiat
- gliwicki
- Voivodeship
- śląskie
- Coordinates
- 50.33118, 18.63020 (the land parcel of building permit ST-SL-GL/WNIOSEK/19141/2024 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 6
- Connection point
- cable heads of 6 kV supply cable in station G190
What
- Power, MW
- 1
- Energy, MWh
- 2.12
- Hours at full power
- 2.12
- Kind
- commercial/industrial, likely behind the meter (logistics site)
- Cells, integrator and builder
- LFP (register)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- register: storage activity from 2026-09-15
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Entered in the operator's art. 43g storage register (first entry 2026-07-10); the register lists connected storage. No report of commercial operation found.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Behind-the-meter or front-of-meter (owner). Supplier. Coordinates.
Sources. register (tauron-dystrybucja.pl); site (wyszukiwarka.gunb.gov.pl)
Ceków hybrid PV+BESS (Domagała Nieruchomości) · Switched on · 1 MW
Who
- Owner
- Domagała Nieruchomości
- Project company
- Domagała Nieruchomości sp. z o.o. (KRS/NIP not found)
- Developer
- not found
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- wielkopolskie
- Coordinates
- not found
- Grid operator
- Energa-Operator
- Connection, kV
- SN
- Connection point
- GPZ Ceków
What
- Power, MW
- 1
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- hybrid PV (1.029 MW) + storage, probably behind a commercial meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- 2024-12-19
- Connection date in the agreement
- after 30 Jun 2026 (as printed)
- Building started
- not found
- Switched on
- by 30 Jun 2026 (queue status "connected")
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Energa-Operator list (data to 30 Jun 2026): status "connected".
- Its row in the connection lists
- Energa queue P/24/084846, GPZ Ceków, SN, MIX, storage 1 MW (charge 1 MW), PV 1.029 MW, connected. Direct row.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Energy capacity, owner details, start date. Borderline for a grid-scale register at 1 MW.
Sources. queue (cdn-netpr.pl)
Being built
Siedlce BESS (Greenvolt) · Being built · 600 MW
Who
- Owner
- Greenvolt Power (KKR)
- Project company
- Magazyn EE Siedlce sp. z o.o. (PSE applicant); capacity contract held by GREENVOLT POWER TRADING sp. z o.o., NIP 5213983839
- Developer
- Greenvolt Power
- Also called
- MEE Siedlce (capacity-market unit); MEE Siedlce 1 i 2 (PSE queue)
Where
- Gmina
- Zbuczyn (from the permit’s parcel)
- Powiat
- siedlecki
- Voivodeship
- mazowieckie
- Coordinates
- 52.11017, 22.40890 (the land parcel of building permit ST-MZ-SI/WNIOSEK/31435/2023 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE
- Connection, kV
- 400
- Connection point
- Siedlce Ujrzanów (PSE)
What
- Power, MW
- 600
- Energy, MWh
- 2400
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- BYD Energy Storage (10 MWh 20-ft Haohan containers); EPC P&Q and ONDE; SCADA/EMS contract awarded Sept 2026
Money
- Capacity unit
- JRM/1154
- Capacity obligation, MW
- 510
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 536.8
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- 2022-02-09
- Connection date in the agreement
- 2027-12-30
- Building started
- 2026-09 (start announced 24 Sep 2026)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- targeted end-2027
Evidence
- Why this status
- Energy-storage.news and energyglobal 24 Sep 2026; gramwzielone 28 Sep 2026: construction has started.
- Its row in the connection lists
- PSE list: "MEE Siedlce 1 i 2", Magazyn EE Siedlce sp. z o.o., Siedlce Ujrzanów 400 kV, 600 MW, agreement 2022-02-09, start of delivery 2027-12-30. Matched by name.
- How the contract was matched
- By unit name "MEE Siedlce" (URE 2028 main list).
- Where sources disagree
- none recorded
- Still missing
- Gmina/powiat and coordinates (Greenvolt, building permit). Financing. Optimiser/offtake. KRS of SPV.
Sources. status (energy-storage.news); status pl (gramwzielone.pl); supplier (gramwzielone.pl); scada (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl); site (wyszukiwarka.gunb.gov.pl)
Dzięgielewo BESS (R.Power) · Being built · 300 MW
Who
- Owner
- R.Power
- Project company
- Elektrownia PV 96 sp. z o.o., NIP 5213969035
- Developer
- R.Power
- Also called
- MEE Dzięgielewo (PSE queue); "Dzięgielewo w miejscowości Dziarnowo" (NFOŚiGW)
Where
- Gmina
- Stara Biała (from the permit’s parcel)
- Powiat
- płocki
- Voivodeship
- mazowieckie
- Coordinates
- 52.64089, 19.67353 (the land parcel of building permit ST-MZ-PL/WNIOSEK/23768/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE
- Connection, kV
- 400
- Connection point
- Płock (PSE)
What
- Power, MW
- 300
- Energy, MWh
- 1200
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- ONDE (contract 117,814,096 zł net: design, procurement, civil and electrical works; construction starts on investor's written instruction); battery supplier not named
Money
- Capacity unit
- JRM/2407
- Capacity obligation, MW
- 40.17
- Contract years
- 17
- First delivery year
- 2030
- Four-hour equivalent, MW
- 300.0
- Other capacity contracts
- not found
- Grant
- €43.05m (188,420,875.61 zł). NFOŚiGW FM: grant 188,420,875.61 zł plus loan 198,924,097.75 zł recommended (cost 542,698,800 zł)
- Trader, optimiser or toll
- Axpo 10-year optimisation agreement with a floor (May 2026)
- Financing
- Green bonds and state grants (ESS News)
When
- Connection agreement signed
- 2026-07-22
- Connection date in the agreement
- 2030-03-31
- Building started
- 2026-07 (contract signed 15 Jul 2026; start reported 23-28 Jul 2026)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- turn of 2027/2028 (ONDE: handover in 2027)
Evidence
- Why this status
- ESS News 23 Jul 2026 and gramwzielone 28 Jul 2026 report construction starting. ONDE (15 Jul 2026): works begin only on the investor's written instruction, so physical start is not separately confirmed.
- Its row in the connection lists
- PSE list: "MEE Dzięgielewo", Elektrownia PV 96 sp. z o.o., Płock 400 kV, 300 MW, agreement 2026-07-22, start of delivery 2030-03-31. Matched by company.
- How the contract was matched
- By NIP 5213969035 (2030 main auction; unit names not published in that list).
- Where sources disagree
- Capacity delivery from 2029 (gramwzielone, ESS News) vs 2030 main auction in URE list. PSE connection date 2030 vs COD 2027/28.
- Still missing
- Gmina (Dziarnowo is a village in mazowieckie; confirm gmina). Confirm physical start. Battery supplier. Coordinates.
Sources. status (ess-news.com); status pl (gramwzielone.pl); epc (biznesradar.pl); optimiser (energy-storage.news); optimiser 10yr (energy-storage.news); grant (gov.pl); queue (pse.pl); cm (ure.gov.pl); site (wyszukiwarka.gunb.gov.pl)
Żarnowiec BESS (PGE) · Being built · 262 MW
Who
- Owner
- PGE Polska Grupa Energetyczna
- Project company
- PGE Inwest 14 sp. z o.o. (PSE applicant and KPO beneficiary; KRS/NIP not found); capacity contract held by PGE Polska Grupa Energetyczna S.A., NIP 5260250541
- Developer
- PGE Energia Odnawialna
- Also called
- BMEE Żarnowiec; MEE Żarnowiec (capacity-market unit); MEE Kartoszyno (PSE queue)
Where
- Gmina
- Krokowa (Kartoszyno, from PSE row name; confirm)
- Powiat
- pucki
- Voivodeship
- pomorskie
- Coordinates
- 54.74428, 18.09528 (the land parcel of building permit ST-PM-PU/WNIOSEK/5043/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE
- Connection, kV
- 400
- Connection point
- Żarnowiec (PSE); 30/400 kV transformer
What
- Power, MW
- 262
- Energy, MWh
- 981
- Hours at full power
- 3.74
- Kind
- standalone, front-of-meter, transmission-connected (next to Żarnowiec pumped storage)
- Cells, integrator and builder
- LG Energy Solution Wrocław: general contractor and DC-Link containers (204 planned); 400 kV transformer from South Korea
Money
- Capacity unit
- JRM/602
- Capacity obligation, MW
- 137.925
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 225.0
- Other capacity contracts
- not found
- Grant
- over €108.98m (477,000,000 zł). KPO "Systemy magazynowania energii" grant "over 477 m zł" (NFOŚiGW, Dec 2025); FM application (470.7 m zł requested) rejected
- Trader, optimiser or toll
- PGE group
- Financing
- KPO grant plus PGE; budget about 1.3 bn zł (H1 2026) / contract 1.555 bn zł gross
When
- Connection agreement signed
- 2023-11-15
- Connection date in the agreement
- 2028-06-30
- Building started
- 2025-09-19
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q2 2027
Evidence
- Why this status
- PGE H1 2026 report (gramwzielone 23 Sep 2026): about 85% complete; all units and HV transformer works finished Aug 2026; COD Q2 2027.
- Its row in the connection lists
- PSE list: "MEE Kartoszyno", PGE Inwest 14, Żarnowiec 400 kV, 263.2 MW (charge 269.4), agreement 2023-11-15, start of delivery 2028-06-30. Matched by company (KPO beneficiary PGE Inwest 14) and size.
- How the contract was matched
- By unit name "MEE Żarnowiec" and supplier PGE (URE 2029 main list); 137.925 / 0.613 = 225 MW = 900 MWh / 4.
- Where sources disagree
- Energy: 981 MWh (contract, KPO) vs about 1,020 MWh nominal (H1 2026 report) vs 900 MWh (2024 tender). Power 262 vs 263 MW. Cost 1.555 bn zł gross (contract) vs about 1.3 bn zł (H1 2026 budget).
- Still missing
- Exact KPO grant amount (NFOŚiGW agreement). Gmina and coordinates (PGE, Geoportal). KRS/NIP of PGE Inwest 14.
Sources. status (gramwzielone.pl); construction start (biznesradar.pl); equipment (gramwzielone.pl); grant (gramwzielone.pl); kpo beneficiary (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl); fm rejected (gov.pl); site (wyszukiwarka.gunb.gov.pl)
Gdańsk II BESS (R.Power) · Being built · 250 MW
Who
- Owner
- R.Power
- Project company
- Elektrownia PV 61 sp. z o.o., NIP 5213892278
- Developer
- R.Power
- Also called
- Magazyn energii Gdańsk II (capacity-market unit); MEE Gdańsk 2 (PSE queue)
Where
- Gmina
- Gdańsk
- Powiat
- Gdańsk
- Voivodeship
- pomorskie
- Coordinates
- not found
- Grid operator
- PSE
- Connection, kV
- 110
- Connection point
- Gdańsk Błonia (PSE)
What
- Power, MW
- 250
- Energy, MWh
- 1000
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, 110 kV at a PSE substation
- Cells, integrator and builder
- ESIX (EPC or balance-of-plant: a reader comment calls these BoP contracts); battery supplier not named
Money
- Capacity unit
- JRM/1513
- Capacity obligation, MW
- 153.25
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 250.0
- Other capacity contracts
- not found
- Grant
- €35.32m (154,570,037.41 zł). NFOŚiGW FM: grant 154,570,037.41 zł plus loan 163,186,298.40 zł recommended (cost 445,200,000 zł)
- Trader, optimiser or toll
- not found
- Financing
- Green bonds and state grants (ESS News); R.Power recapitalisation €250m
When
- Connection agreement signed
- 2025-03-18
- Connection date in the agreement
- 2032-06-30
- Building started
- 2026-07 (contracts signed; start reported 23-28 Jul 2026)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- turn of 2027/2028
Evidence
- Why this status
- ESS News 23 Jul 2026 ("moves into construction") and gramwzielone 28 Jul 2026 ("construction starts"). Physical works not separately confirmed.
- Its row in the connection lists
- PSE list: "MEE Gdańsk 2", Elektrownia PV 61 sp. z o.o., Gdańsk Błonia 110 kV, 250 MW, agreement 2025-03-18, start of delivery 2032-06-30. Matched by company.
- How the contract was matched
- By NIP 5213892278 and unit name.
- Where sources disagree
- PSE agreed connection date 30 Jun 2032 is years after the planned COD (2027/28); a capacity obligation starts 2029.
- Still missing
- Confirm physical construction start and that the PSE connection date was brought forward (PSE list, R.Power). Battery supplier. Exact site and coordinates. Whether NFOŚiGW agreements were signed (R.Power says 499.1 m zł received in total).
Sources. status (ess-news.com); status pl (gramwzielone.pl); epc (energy-storage.news); grant (gov.pl); r power grants total (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl)
Mieczysławów BESS (Northland Power) · Being built · 200 MW
Who
- Owner
- Northland Power (bought from Greenvolt, Nov 2025)
- Project company
- Magazyn EE Mieczysławów sp. z o.o. (PSE applicant, NFOŚiGW beneficiary); capacity contract held by GREENVOLT POWER TRADING sp. z o.o., NIP 5213983839
- Developer
- Greenvolt Power (to pre-construction)
- Also called
- MEE Mieczysławów
Where
- Gmina
- Ślesin (from the permit’s parcel)
- Powiat
- koniński
- Voivodeship
- wielkopolskie
- Coordinates
- 52.33062, 18.24447 (the land parcel of building permit ST-WK-KN/WNIOSEK/9879/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE
- Connection, kV
- 220
- Connection point
- Pątnów (PSE)
What
- Power, MW
- 200
- Energy, MWh
- 800
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1150
- Capacity obligation, MW
- 170
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 178.9
- Other capacity contracts
- not found
- Grant
- €40.99m (179,413,200 zł). NFOŚiGW FM grant 179,413,200 zł (cost 520,021,625 zł); Northland/PKO: grants for both projects about 280 m zł
- Trader, optimiser or toll
- not found
- Financing
- About 500 m zł for Mieczysławów and Kamionka: PKO Bank Polski, Bank Pekao (agent), BGK and Export Development Canada; financial close announced 30 Sep 2026; total cost of both about 1 bn zł
When
- Connection agreement signed
- 2022-02-01
- Connection date in the agreement
- 2027-05-30
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2028 (early 2028 per ESN; mid-2028 per gramwzielone)
Evidence
- Why this status
- PKO BP 8 Oct 2026 and gramwzielone 1 Oct 2026: both projects already under construction.
- Its row in the connection lists
- PSE list: "MEE Mieczysławów", Magazyn EE Mieczysławów sp. z o.o., Pątnów 220 kV, 200 MW, agreement 2022-02-01, start of delivery 2027-05-30. Matched by name.
- How the contract was matched
- By unit name "MEE Mieczysławów".
- Where sources disagree
- COD: early 2028 (energy-storage.news 2 Oct 2026) vs mid-2028 (gramwzielone 1 Oct 2026, which gives Kamionka early 2028). Energy-storage.news says grants of about 1 bn zł; PKO and gramwzielone say about 280 m zł, which matches the ranking list (282.0 m zł).
- Still missing
- Gmina and coordinates. Equipment supplier and EPC (Northland). Construction start date. Which COD is right.
Sources. status (pkobp.pl); cod pl (gramwzielone.pl); cod en (energy-storage.news); acquisition (energy-storage.news); grant (gov.pl); queue (pse.pl); cm (ure.gov.pl); site (wyszukiwarka.gunb.gov.pl)
Jedwabno BESS (R.Power) · Being built · 150 MW
Who
- Owner
- R.Power
- Project company
- Magazyn Energii Jedwabno sp. z o.o., NIP 5214076492 (earlier Elektrownia PV 76 sp. z o.o. held the URE concession promise)
- Developer
- R.Power
- Also called
- Magazyn Energii Jedwabno (capacity-market unit)
Where
- Gmina
- Lubicz
- Powiat
- toruński
- Voivodeship
- kujawsko-pomorskie
- Coordinates
- 53.05883, 18.77490 (the land parcel of building permit ST-KP-TO/WNIOSEK/5961/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Energa-Operator
- Connection, kV
- 110
- Connection point
- SE Toruń Elana
What
- Power, MW
- 150
- Energy, MWh
- 300
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, 110 kV
- Cells, integrator and builder
- EPC Nomad Electric (R.Power group) with ESIX; 64 battery containers, 32 MV transformer stations; battery supplier not named
Money
- Capacity unit
- JRM/1255
- Capacity obligation, MW
- 45.975
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 75.0
- Other capacity contracts
- T-1 2027 supplementary auction: R.Power won 75.994 MW for Jedwabno and Herby together
- Grant
- NFOŚiGW FM grant and loan applications not recommended
- Trader, optimiser or toll
- Axpo long-term optimisation (signed Jan or Feb 2026 per R.Power/energyglobal; ESS News says May)
- Financing
- Project finance about 270 m zł (€64m), Siemens Bank (Siemens Financial Services) and Erste Group, June 2026
When
- Connection agreement signed
- 2024-10-14
- Connection date in the agreement
- after 30 Jun 2026 (as printed)
- Building started
- 2026-02 (energyglobal; ESS News says ground broken in March)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- grid connection planned Dec 2026
Evidence
- Why this status
- Energyglobal 8 Oct 2026 and gramwzielone 8 Oct 2026: all 64 containers delivered and installed; grid connection planned for December 2026.
- Its row in the connection lists
- Energa queue P/23/006183: Magazyn Energii Jedwabno sp. z o.o., SE Toruń Elana, 110 kV, 150 MW, agreement 2024-10-14; second row P/25/041776 (31.44 MW, agreement 2026-04-27). Matched by applicant name.
- How the contract was matched
- By unit name and NIP 5214076492.
- Where sources disagree
- Construction start Feb 2026 (energyglobal) vs March 2026 (ESS News). Axpo deal Jan 2026 (energyglobal) vs Feb 2026 (gramwzielone) vs May 2026 (ESS News).
- Still missing
- Battery supplier (R.Power). Coordinates. Second Energa row (31.44 MW) purpose.
Sources. status (energyglobal.com); containers (gramwzielone.pl); financing (gramwzielone.pl); gmina (gramwzielone.pl); voivodeship (gramwzielone.pl); epc (ess-news.com); queue (cdn-netpr.pl); cm (ure.gov.pl); grant not recommended (gov.pl); site (wyszukiwarka.gunb.gov.pl)
Trzebinia BESS (DRI / DTEK, to Actis) · Being built · 133 MW
Who
- Owner
- DRI (DTEK Renewables International, DTEK group); Actis to acquire on completion (announced 6 Oct 2026)
- Project company
- Fotowoltaika HIG XVIII sp. z o.o., NIP 5213943455 (capacity contract and PSE applicant)
- Developer
- Columbus Energy (to RtB), then DRI
- Also called
- MEE Trzebinia (PSE queue); BESS Trzebinia
Where
- Gmina
- Trzebinia (name) or Chrzanów (Columbus 2024 article): see disagreements
- Powiat
- chrzanowski
- Voivodeship
- małopolskie
- Coordinates
- not found
- Grid operator
- PSE
- Connection, kV
- 220
- Connection point
- Siersza (PSE)
What
- Power, MW
- 133
- Energy, MWh
- 622
- Hours at full power
- 4.68
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- Fluence Smartstack; EPC Electrum
Money
- Capacity unit
- JRM/730
- Capacity obligation, MW
- 123.852
- Contract years
- 17
- First delivery year
- 2027
- Four-hour equivalent, MW
- 130.4
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- Entrix optimisation and trading (June 2026)
- Financing
- About 470 m zł non-recourse project finance: Erste Bank Polska (coordinator, agent), PKO Bank Polski, UniCredit; KUKE guarantee under the ITE programme (June 2026)
When
- Connection agreement signed
- 2024-07-03
- Connection date in the agreement
- 2027-01-30
- Building started
- 2026 (start announced by June 2026)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned early 2027
Evidence
- Why this status
- Gramwzielone 10 and 22 Jun 2026: construction under way; commissioning planned early 2027. Energy-storage.news 8 Oct 2026: Actis deal completes once operational.
- Its row in the connection lists
- PSE list: "MEE Trzebinia", Fotowoltaika HIG XVIII sp. z o.o., Siersza 220 kV, 132.264 MW, agreement 2024-07-03, start of delivery 2027-01-30. Matched by company.
- How the contract was matched
- By NIP 5213943455 (Fotowoltaika HIG XVIII), 2027 main auction; Columbus and DRI statements tie this SPV to the project.
- Where sources disagree
- Energy: 532 MWh (Columbus 2024) vs 622 MWh (Fluence, DRI) vs 623 MWh (Actis). Power 133 vs 132 MW. Gmina: Columbus 2024 article said gmina Chrzanów; project name and PSE substation (Siersza) point to Trzebinia.
- Still missing
- Gmina and coordinates (building permit, Geoportal). Construction start date. Energisation date (due before 2027 capacity obligation).
Sources. status (gramwzielone.pl); status (gramwzielone.pl); mwh (ir.fluenceenergy.com); optimiser (gramwzielone.pl); actis (energy-storage.news); columbus sale (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl)
Kamionka BESS (Northland Power) · Being built · 100 MW
Who
- Owner
- Northland Power (bought from Greenvolt, Nov 2025)
- Project company
- Magazyn EE Kamionka sp. z o.o. (PSE applicant, NFOŚiGW beneficiary); capacity contract held by GREENVOLT POWER TRADING sp. z o.o., NIP 5213983839
- Developer
- Greenvolt Power (to pre-construction)
- Also called
- MEE Kamionka; "Turek 1 etap 1" (PSE queue)
Where
- Gmina
- not found
- Powiat
- turecki
- Voivodeship
- wielkopolskie
- Coordinates
- 52.00873, 18.53751 (the land parcel of building permit ST-WK-TU/WNIOSEK/7680/2023 in GUNB’s register, placed by GUGiK)
- Grid operator
- PSE
- Connection, kV
- 110
- Connection point
- Adamów (PSE)
What
- Power, MW
- 100
- Energy, MWh
- 400
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, transmission-connected
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1149
- Capacity obligation, MW
- 85
- Contract years
- 17
- First delivery year
- 2028
- Four-hour equivalent, MW
- 89.5
- Other capacity contracts
- not found
- Grant
- €23.45m (102,619,500 zł). NFOŚiGW FM grant 102,619,500 zł (cost 304,040,263 zł)
- Trader, optimiser or toll
- not found
- Financing
- Shared about 500 m zł loan with Mieczysławów (PKO BP, Pekao, BGK, EDC), announced 30 Sep 2026
When
- Connection agreement signed
- 2022-03-15
- Connection date in the agreement
- 2026-12-26
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2028 (mid-2028 per ESN; early 2028 per gramwzielone)
Evidence
- Why this status
- PKO BP 8 Oct 2026 and gramwzielone 1 Oct 2026: under construction.
- Its row in the connection lists
- PSE list: "MEE Kamionka (Turek 1 etap 1)", Magazyn EE Kamionka sp. z o.o., Adamów 110 kV, 100 MW, agreement 2022-03-15, start of delivery 2026-12-26. Matched by name.
- How the contract was matched
- By unit name "MEE Kamionka".
- Where sources disagree
- COD differs between sources (see Mieczysławów). PSE agreed delivery date 26 Dec 2026 vs COD 2028.
- Still missing
- Gmina and coordinates. Supplier and EPC. Construction start.
Sources. status (pkobp.pl); cod pl (gramwzielone.pl); cod en (energy-storage.news); grant (gov.pl); queue (pse.pl); cm (ure.gov.pl); site (wyszukiwarka.gunb.gov.pl)
Lwówek Śląski BESS (Green Capital) · Being built · 80 MW
Who
- Owner
- Green Capital S.A. and Prime Capital AG (50% of this project), joint venture
- Project company
- Słoneczko V sp. z o.o., NIP 8911632269
- Developer
- Green Capital
- Also called
- Płóczki Górne (NFOŚiGW); possibly "ME Rząsiny" (capacity-market unit)
Where
- Gmina
- Lwówek Śląski
- Powiat
- lwówecki
- Voivodeship
- dolnośląskie
- Coordinates
- 51.06535, 15.53949 (the land parcel of building permit ST-DL-LS/WNIOSEK/3988/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Tauron Dystrybucja
- Connection, kV
- 110
- Connection point
- possibly Tauron station LWO4 (inferred)
What
- Power, MW
- 80
- Energy, MWh
- 320
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter, 110 kV
- Cells, integrator and builder
- Electrum full-wrap EPC (design, technology supply, civil, HV, grid integration, EMS/SCADA, 5-year O&M); battery supplier not named
Money
- Capacity unit
- JRM/1133
- Capacity obligation, MW
- 48.794
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 79.6
- Other capacity contracts
- not found
- Grant
- €22.12m (96,810,090.73 zł). NFOŚiGW FM grant 96,810,090.73 zł recommended (cost 228,139,400 zł; "80 MW and 320 MWh in Płóczki Górne")
- Trader, optimiser or toll
- not found
- Financing
- Prime Capital equity (50%); NFOŚiGW grant
When
- Connection agreement signed
- 2023-12-06 (inferred Tauron match)
- Connection date in the agreement
- not found
- Building started
- 2026-Q2 (planned)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2027
Evidence
- Why this status
- Gramwzielone 20 May 2026: Green Capital has 80 MW of storage under construction (this is its only 80 MW project). Construction was scheduled to start in Q2 2026 (gramwzielone 20 Apr 2026).
- Its row in the connection lists
- Possible Tauron queue row: station LWO4, 110 kV, storage 80 MW, agreement 2023-12-06 (inferred from station code and size).
- How the contract was matched
- By company Słoneczko V (same as grant beneficiary) and size: 48.794 / 0.613 = 79.6 MW four-hour equivalent. Unit name "ME Rząsiny" differs from Płóczki Górne; check both villages are the site.
- Where sources disagree
- A reader comment claims the site is in a flood zone and faces local opposition (unverified).
- Still missing
- Dated confirmation that works began (Green Capital). Confirm ME Rząsiny = this project. Connection point. Coordinates.
Sources. status (gramwzielone.pl); cod (gramwzielone.pl); epc en (energy-storage.news); grant (gov.pl); cm (ure.gov.pl); queue (tauron-dystrybucja.pl); site (wyszukiwarka.gunb.gov.pl)
Osiek Jasielski BESS (OX2) · Being built · 50 MW
Who
- Owner
- OX2
- Project company
- OX2 Green sp. z o.o., NIP 5252813797 (capacity contract holder)
- Developer
- OX2
- Also called
- Osiek BESS; OX2's first Polish battery
Where
- Gmina
- Osiek Jasielski
- Powiat
- jasielski
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja (Rzeszów branch)
- Connection, kV
- 110
- Connection point
- not found
What
- Power, MW
- 50
- Energy, MWh
- 120
- Hours at full power
- 2.40
- Kind
- standalone, front-of-meter, 110 kV
- Cells, integrator and builder
- Fluence Smartstack; OX2 usually keeps EPC in-house
Money
- Capacity unit
- JRM/758
- Capacity obligation, MW
- 21.09
- Contract years
- 17
- First delivery year
- 2027
- Four-hour equivalent, MW
- 22.2
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- Long-term project financing from NORD/LB and CaixaBank (also covers OX2's Lion PV farm), June 2026
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- 2024 (works on both sides of the connection point, July 2024); investment decision 1 Jun 2026
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- 2027 ("next year", June 2026); earlier target mid-2026
Evidence
- Why this status
- Energy-storage.news 4 Jun 2026: FID taken and construction under way. OX2 press release 1 Jun 2026: investment decision.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- By supplier OX2 Green sp. z o.o. and press: OX2's only 2027-auction unit, "21 MW portion" of the battery.
- Where sources disagree
- Energy: 100 MWh (gramwzielone 2024) vs 120 MWh (OX2 2026). "Construction underway" in July 2024 vs investment decision announced June 2026.
- Still missing
- Connection substation (PGE Dystrybucja queue, not captured). Project-company KRS. Coordinates. Energisation before the 2027 capacity obligation.
Sources. status (energy-storage.news); financing (ox2.com); supplier (gramwzielone.pl); 2024 (gramwzielone.pl); cm (ure.gov.pl)
Bydgoszcz BESS (Tavion) · Being built · 20 MW
Who
- Owner
- Tavion (Sweden)
- Project company
- not found
- Developer
- Tavion
- Also called
- Tavion's first Polish battery park
Where
- Gmina
- Bydgoszcz
- Powiat
- Bydgoszcz
- Voivodeship
- kujawsko-pomorskie
- Coordinates
- not found
- Grid operator
- Enea Operator
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 20
- Energy, MWh
- 40
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- HyperStrong (BESS integration); Esix Polska (part of works); Ayesa (engineer)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- Tavion equity (€34m round led by Leitmotif and Oberon Capital) plus debt raised Sept 2026 (€50m total incl. €16m credit line)
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- 2026-10 (reported started 13 Oct 2026)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- grid connection expected 2027
Evidence
- Why this status
- Gramwzielone 13 Oct 2026: construction has started.
- Its row in the connection lists
- Possible Enea queue rows: ALFAMA sp. z o.o., Bydgoszcz Południe SN, 2 x 9.415 MW, agreement 2025-11-04 (unconfirmed; matched only by city and size).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Project company and site (Tavion). Connection point (Enea queue match). Coordinates.
Sources. status (gramwzielone.pl); financing (gramwzielone.pl); queue (operator.enea.pl)
Puławy BESS (RelyAssets) · Being built · 4 MW
Who
- Owner
- RelyAssets (Spain)
- Project company
- not found
- Developer
- RelyAssets
- Also called
- not found
Where
- Gmina
- Puławy
- Powiat
- puławski
- Voivodeship
- lubelskie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja (assumed: Lublin region)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 4
- Energy, MWh
- 16
- Hours at full power
- 4.00
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- A RelyAssets company won about 4 MW in the T-1 2027 supplementary auction (WysokieNapiecie/Modo via earlier research; unit not named)
- Grant
- not found
- Trader, optimiser or toll
- Entrix: optimisation and commercialisation (ancillary services, day-ahead, intraday)
- Financing
- RelyAssets raised over €2.3m for the project
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- by June 2026
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Sept 2026 (not confirmed)
Evidence
- Why this status
- Gramwzielone 22 Jun 2026: being built, commissioning planned for September 2026. No later report found.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- Unconfirmed (T-1 2027 list not read).
- Where sources disagree
- none recorded
- Still missing
- Whether it was energised in Sept 2026 (RelyAssets/Entrix). Project company. T-1 2027 capacity contract (URE final T-1 list). Coordinates.
Financed, not started
Gryfino BESS (PGE) · Financed, not started · 400 MW
Who
- Owner
- PGE Polska Grupa Energetyczna
- Project company
- PGE Inwest 22 sp. z o.o. (PSE applicant, FM applicant); capacity contract held by PGE Polska Grupa Energetyczna S.A., NIP 5260250541
- Developer
- PGE Energia Odnawialna
- Also called
- Magazyn Energii Gryfino; ME Gryfino (capacity-market unit); site at Nowe Czarnowo
Where
- Gmina
- Gryfino
- Powiat
- gryfiński
- Voivodeship
- zachodniopomorskie
- Coordinates
- not found
- Grid operator
- PSE
- Connection, kV
- 400
- Connection point
- Krajnik (PSE)
What
- Power, MW
- 400
- Energy, MWh
- 800
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, transmission-connected (two-hour)
- Cells, integrator and builder
- Fluence SmartStack; design-build turnkey contract with SPEC BAU Polska and EL Professional, 1.142 bn zł gross (1.1 bn zł per H1 report); contract engineer Elbis (Apr 2026)
Money
- Capacity unit
- JRM/1165
- Capacity obligation, MW
- 120.782
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 197.0
- Other capacity contracts
- not found
- Grant
- NFOŚiGW FM application (383.3 m zł requested) not recommended
- Trader, optimiser or toll
- PGE group
- Financing
- PGE balance sheet (future capex commitments about 940 m zł at 30 Jun 2026)
When
- Connection agreement signed
- 2025-05-26
- Connection date in the agreement
- 2028-11-30
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned end-2028
Evidence
- Why this status
- PGE H1 2026 report (gramwzielone 23 Sep 2026): EPC contract signed, in design phase, no construction yet.
- Its row in the connection lists
- PSE list: "MEE Gryfino", PGE Inwest 22, Krajnik 400 kV, 400.069 MW, agreement 2025-05-26, start of delivery 2028-11-30. Matched by name.
- How the contract was matched
- By unit name "ME Gryfino" and supplier PGE (URE 2029 list).
- Where sources disagree
- Contract value 1.142 bn zł gross (tender result) vs 1.1 bn zł (H1 report).
- Still missing
- Construction start date. Coordinates.
Sources. status (gramwzielone.pl); epc (gramwzielone.pl); queue (pse.pl); cm (ure.gov.pl); grant rejected (gov.pl)
Zwartowo III PV + BESS (Respect Energy) · Financed, not started · 184 MW
Who
- Owner
- Respect Energy
- Project company
- Respect Energy Solar Zwartowo sp. z o.o.
- Developer
- Respect Energy
- Also called
- PV+MEE Zwartowo III (PSE queue; formerly PV Zwartowo / FW Choczewo)
Where
- Gmina
- Choczewo (Zwartowo village; confirm)
- Powiat
- wejherowski
- Voivodeship
- pomorskie
- Coordinates
- not found
- Grid operator
- PSE
- Connection, kV
- 110
- Connection point
- Żarnowiec (PSE)
What
- Power, MW
- 184
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- hybrid with 255 MWp PV
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- KPO Fundusz Wsparcia Energetyki preferential financing over 326 m zł via BGK for PV (255 MWp) and BESS together (loan or grant not stated)
- Trader, optimiser or toll
- Respect Energy group
- Financing
- BGK/KPO preferential financing agreement over 326 m zł (May 2026)
When
- Connection agreement signed
- 2010-05-05 (as printed in PSE list)
- Connection date in the agreement
- 2030-04-10
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 27 May 2026: financing agreement signed with BGK; project described in future tense, no construction start. Partial financing only; included because a financing agreement is signed; treat as borderline.
- Its row in the connection lists
- PSE list: "PV+MEE Zwartowo III (wcześniej PV Zwartowo; FW Choczewo)", Respect Energy Solar Zwartowo sp. z o.o., Żarnowiec 110 kV, MIX 184 MW, start of delivery 2030-04-10. Matched by name and company.
- How the contract was matched
- not found
- Where sources disagree
- PSE agreement date 2010-05-05 reflects the original wind-farm agreement.
- Still missing
- Battery MWh, share of financing for storage, construction schedule (Respect Energy, BGK). Whether this is full financial close.
Tauron BESS Laryszów · Financed, not started · 84 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME8 sp. z o.o., NIP 6343042662
- Developer
- Tauron (in-house)
- Also called
- BME Laryszów; ME Laryszów (capacity-market unit)
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 84
- Energy, MWh
- 358
- Hours at full power
- 4.26
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1413
- Capacity obligation, MW
- 49.371
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 80.5
- Other capacity contracts
- not found
- Grant
- €24.58m (107,568,872.06 zł). NFOŚiGW FM grant 107,568,872.06 zł (cost 309,830,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q4 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- By unit name and Tauron SPV; four-hour equivalent 80.5 MW.
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl); cm (ure.gov.pl)
Tauron hybrid Ogrodzieniec (BESS part) · Financed, not started · 55 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Zielona Energia sp. z o.o.
- Developer
- Tauron (in-house)
- Also called
- IH Ogrodzieniec; ME Ogrodzieniec
Where
- Gmina
- Ogrodzieniec
- Powiat
- not found
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 55
- Energy, MWh
- 237
- Hours at full power
- 4.31
- Kind
- hybrid with Tauron PV (85 MW PV, 140 MW total)
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €21.64m (94,734,270 zł). NFOŚiGW FM grant 94,734,270.00 zł (cost 210,525,600 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported. Tauron says it took investment decisions on three of its four hybrid installations in H1 2026 without naming them.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron BESS Bałków · Financed, not started · 54 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Zielona Energia sp. z o.o.
- Developer
- Tauron (in-house)
- Also called
- BME Bałków
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- świętokrzyskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 54
- Energy, MWh
- 242
- Hours at full power
- 4.48
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €21.24m (92,947,500 zł). NFOŚiGW FM grant 92,947,500.00 zł (cost 206,555,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2027
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron BESS Dąbrowa Środkowa · Financed, not started · 45 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Zielona Energia sp. z o.o.
- Developer
- Tauron (in-house)
- Also called
- BME Dąbrowa Środkowa
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 45
- Energy, MWh
- 192
- Hours at full power
- 4.27
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €17.70m (77,456,250 zł). NFOŚiGW FM grant 77,456,250.00 zł (cost 172,130,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q2 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron BESS Twardogóra · Financed, not started · 42 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Zielona Energia sp. z o.o.
- Developer
- Tauron (in-house)
- Also called
- BME Twardogóra
Where
- Gmina
- Twardogóra
- Powiat
- not found
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 42
- Energy, MWh
- 179
- Hours at full power
- 4.26
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €16.52m (72,292,500 zł). NFOŚiGW FM grant 72,292,500.00 zł (cost 160,655,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q4 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron hybrid Stare Bogaczowice I (BESS part) · Financed, not started · 30 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON Zielona Energia sp. z o.o.
- Developer
- Tauron (in-house)
- Also called
- IH Stare Bogaczowice I; ME Stare Bogaczowice I
Where
- Gmina
- Stare Bogaczowice
- Powiat
- not found
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 30
- Energy, MWh
- 134
- Hours at full power
- 4.47
- Kind
- hybrid with Tauron PV (28.5 MW PV, 58.5 MW total)
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €9.10m (39,840,322.99 zł). NFOŚiGW FM grant 39,840,322.99 zł (cost 114,755,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q3 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported. Tauron says it took investment decisions on three of its four hybrid installations in H1 2026 without naming them.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- Tauron also holds capacity unit JRM/1399 "ME Stare Bogaczowice 3" (TAURON BME7, 63.121 MW = 103 MW four-hour equivalent), which fits Stare Bogaczowice II (105 MW, no grant), not this project.
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron BESS Bytom · Financed, not started · 18 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME9 sp. z o.o., NIP 6343042685
- Developer
- Tauron (in-house)
- Also called
- BME Bytom; ME Bytom (capacity-market unit)
Where
- Gmina
- Bytom
- Powiat
- not found
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 18
- Energy, MWh
- 77
- Hours at full power
- 4.28
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1415
- Capacity obligation, MW
- 10.702
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 17.5
- Other capacity contracts
- not found
- Grant
- €6.69m (29,261,250 zł). NFOŚiGW FM grant 29,261,250.00 zł (cost 65,030,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q4 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- By unit name and Tauron SPV; four-hour equivalent 17.5 MW.
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl); cm (ure.gov.pl)
Trześń BESS (PEI PV 03 / Eko Prime) · Financed, not started · 16 MW
Who
- Owner
- Not confirmed (grant beneficiary PEI PV 03 sp. z o.o.)
- Project company
- PEI PV 03 sp. z o.o. (KRS/NIP not found)
- Developer
- not found
- Also called
- "Magazyn energii TRZEŚŃ 2-3-4" (NFOŚiGW)
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- not found
- Connection, kV
- 15
- Connection point
- not found
What
- Power, MW
- 16.25
- Energy, MWh
- 65
- Hours at full power
- 4.00
- Kind
- standalone (three blocks)
- Cells, integrator and builder
- EPC Eko Prime Inwestycje; 13 Linyang 5.015 MWh containers; Kehua converters
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €3.79m (16,577,671.23 zł). NFOŚiGW FM grant 16,577,671.23 zł recommended (cost 47,952,200 zł)
- Trader, optimiser or toll
- Arbitrage first, balancing after PSE qualification (plan)
- Financing
- NFOŚiGW grant
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q1 2027
Evidence
- Why this status
- Gramwzielone 31 Aug 2026 (sponsored): contracted, equipment already at port, commissioning Q1 2027.
- Its row in the connection lists
- Not matched (PGE Dystrybucja queue not captured).
- How the contract was matched
- not found
- Where sources disagree
- Source is sponsored content. Link between Eko Prime's Trześń contract and PEI PV 03's grant is by place name only.
- Still missing
- Gmina (several villages are called Trześń), owner, connection, construction start.
CLIP logistics centre BESS near Poznań (EDP) · Financed, not started · 8 MW
Who
- Owner
- Grupa CLIP (client; ownership model with EDP not stated)
- Project company
- NFOŚiGW beneficiaries: CLIP Logistyka sp. z o.o., Clip Ubezpieczenia sp. z o.o., STS Logistic sp. z o.o., MB Poznań sp. z o.o. (link to this EDP project inferred)
- Developer
- EDP Energia Polska
- Also called
- Four battery systems for Grupa CLIP
Where
- Gmina
- Swarzędz (from the permit’s parcel)
- Powiat
- poznański (assumed)
- Voivodeship
- wielkopolskie
- Coordinates
- 52.39845, 17.12140 (the land parcel of building permit ST-WK-PO/WNIOSEK/25014/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- Enea Operator (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 8
- Energy, MWh
- 20
- Hours at full power
- 2.50
- Kind
- commercial/industrial, behind the meter (four systems of about 2 MW)
- Cells, integrator and builder
- EDP Energia Polska builds; supplier not named
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €1.91m (8,345,757 zł). NFOŚiGW FM grants to four CLIP-group companies, about 2.07-2.09 m zł each, 8,345,757 zł together (container BESS with transformer stations, wielkopolskie); link to this project inferred
- Trader, optimiser or toll
- Own use with about 8 MW of rooftop PV
- Financing
- NFOŚiGW grants (inferred) plus client/EDP
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 23 Jul 2026: EDP will build four systems (8 MW / 20 MWh) for CLIP; energy-storage.news 24 Jul 2026 says EDP is deploying them.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- Four systems of about 2 MW each; only the total is above 1 MW per site if each is 2 MW (not stated).
- Still missing
- Per-system size, site, whether grants are these systems, construction start (EDP or CLIP).
Sources. status (gramwzielone.pl); edp en (energy-storage.news); grant (gov.pl); site (wyszukiwarka.gunb.gov.pl)
Przeworsk BESS (LC Energia) · Financed, not started · 8 MW
Who
- Owner
- LC Energia (joint venture of Low Carbon, Evercon and InCommodities)
- Project company
- Not confirmed (LC ENERGIA 19 sp. z o.o. applied for a grant for ME Wylewa)
- Developer
- Evercon
- Also called
- Possibly "Magazyn Energii ME Wylewa", gmina Przeworsk (LC Energia 19 grant application, not funded)
Where
- Gmina
- Przeworsk
- Powiat
- przeworski
- Voivodeship
- podkarpackie
- Coordinates
- 50.05830, 22.51319 (the land parcel of building permit ST-PK-PZ/WNIOSEK/8086/2025 in GUNB’s register, placed by GUGiK)
- Grid operator
- PGE Dystrybucja (assumed)
- Connection, kV
- SN
- Connection point
- own on-site substation, medium-voltage cable connection
What
- Power, MW
- 8
- Energy, MWh
- 16
- Hours at full power
- 2.00
- Kind
- standalone, front-of-meter, medium voltage
- Cells, integrator and builder
- EPC Goldbeck Solar Polska (design to commissioning); four battery containers, two PCS units with transformers; suppliers not named
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- NFOŚiGW FM application for ME Wylewa not recommended
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- planned Q2 2026 (not confirmed)
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned turn of Q1/Q2 2027
Evidence
- Why this status
- Gramwzielone 18 Mar 2026: EPC contract signed, works to start Q2 2026. No later confirmation found.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Whether works began in Q2 2026 (Goldbeck, Evercon). Project company and exact site.
Sources. status (gramwzielone.pl); grant not recommended (gov.pl); site (wyszukiwarka.gunb.gov.pl)
Tauron BESS Radlna Tarnowiec · Financed, not started · 6 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME9 sp. z o.o., NIP 6343042685
- Developer
- Tauron (in-house)
- Also called
- BME Radlna Tarnowiec; ME Radlna-Tarnowiec (capacity-market unit)
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- małopolskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 6
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1398
- Capacity obligation, MW
- 3.567
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 5.8
- Other capacity contracts
- not found
- Grant
- €1.82m (7,968,064.60 zł). NFOŚiGW FM grant 7,968,064.60 zł (cost 22,955,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q2 2027
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- By unit name and Tauron SPV; four-hour equivalent 5.8 MW.
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl); cm (ure.gov.pl)
Warzyce BESS (BESS-Group) · Financed, not started · 5 MW
Who
- Owner
- BESS-Group (investor not otherwise named)
- Project company
- not found
- Developer
- BESS-Group
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- jasielski
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 5
- Energy, MWh
- 10
- Hours at full power
- 2.00
- Kind
- standalone (assumed)
- Cells, integrator and builder
- ML System+ (design and build, incl. NexuView SCADA/EMS); two identical contracts together about 17.6 m zł net
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 29 Sep 2026: design-and-build contract signed with ML System+ (treated here as an investment decision); no construction start reported.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- not found
- Where sources disagree
- Contract value: "nearly 17.6 m zł net" (body) vs "over 17 m zł" (summary).
- Still missing
- Owner, financing, connection, schedule (ML System ESPI filing or BESS-Group). Gmina.
Sources. all (gramwzielone.pl)
Niegłowice BESS (BESS-Group) · Financed, not started · 5 MW
Who
- Owner
- BESS-Group (investor not otherwise named)
- Project company
- not found
- Developer
- BESS-Group
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- jasielski
- Voivodeship
- podkarpackie
- Coordinates
- not found
- Grid operator
- PGE Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 5
- Energy, MWh
- 10
- Hours at full power
- 2.00
- Kind
- standalone (assumed)
- Cells, integrator and builder
- ML System+ (design and build, incl. NexuView SCADA/EMS); two identical contracts together about 17.6 m zł net
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- not found
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 29 Sep 2026: design-and-build contract signed with ML System+ (treated here as an investment decision); no construction start reported.
- Its row in the connection lists
- PGE Dystrybucja queue not captured.
- How the contract was matched
- not found
- Where sources disagree
- Contract value: "nearly 17.6 m zł net" (body) vs "over 17 m zł" (summary).
- Still missing
- Owner, financing, connection, schedule (ML System ESPI filing or BESS-Group). Gmina.
Sources. all (gramwzielone.pl)
Krotoszyn PV-coupled BESS (Ekoenergia Solar 10 / Eko Prime) · Financed, not started · 5 MW
Who
- Owner
- Not confirmed (grant beneficiary Ekoenergia Solar 10 sp. z o.o.; Eko Prime is the contractor)
- Project company
- EKOENERGIA SOLAR 10 sp. z o.o. (KRS/NIP not found)
- Developer
- not found
- Also called
- "Magazyn energii dla elektrowni fotowoltaicznej Krotoszyn" (NFOŚiGW)
Where
- Gmina
- Krotoszyn
- Powiat
- krotoszyński
- Voivodeship
- wielkopolskie
- Coordinates
- not found
- Grid operator
- Energa-Operator
- Connection, kV
- SN
- Connection point
- GPZ Krotoszyn Południe
What
- Power, MW
- 5
- Energy, MWh
- 25
- Hours at full power
- 5.00
- Kind
- co-located with PV (5.897 MW PV in queue row)
- Cells, integrator and builder
- EPC Eko Prime Inwestycje; Linyang 5.015 MWh containers; Polish bidirectional converter (five 1.25 MVA units)
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €2.03m (8,888,721 zł). NFOŚiGW FM grant 8,888,721 zł recommended (cost 33,015,667 zł)
- Trader, optimiser or toll
- not found
- Financing
- NFOŚiGW grant
When
- Connection agreement signed
- 2023-10-20
- Connection date in the agreement
- 2027-09-30
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q1 2027
Evidence
- Why this status
- Gramwzielone 31 Aug 2026 (sponsored Eko Prime material): contracted, commissioning Q1 2027. Grant on NFOŚiGW list.
- Its row in the connection lists
- Energa queue P/21/075976: EKOENERGIA SOLAR 10, GPZ Krotoszyn Południe, SN, MIX, storage 4.9 MW out / 5 MW in, PV 5.897 MW, agreement 2023-10-20, agreed date 2027-09-30. Matched by company (grant) and town.
- How the contract was matched
- not found
- Where sources disagree
- Source is sponsored content.
- Still missing
- Confirm Eko Prime's Krotoszyn contract is the Ekoenergia Solar 10 project (owner). Construction start. Owner group.
Sources. equipment (gramwzielone.pl); grant (gov.pl); queue (cdn-netpr.pl)
Tauron BESS Baranowice · Financed, not started · 3.9 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME9 sp. z o.o., NIP 6343042685
- Developer
- Tauron (in-house)
- Also called
- BME Baranowice
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- śląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 3.9
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- €1.18m (5,179,241.99 zł). NFOŚiGW FM grant 5,179,241.99 zł (cost 14,922,500 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q4 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- not found
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates. Possible capacity unit JRM/1440 "ME Rybnik" (TAURON BME9, 2.317 MW = 3.8 MW four-hour equivalent), not confirmed.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl)
Tauron BESS Pilchowice · Financed, not started · 2 MW
Who
- Owner
- Tauron Polska Energia
- Project company
- TAURON BME4 sp. z o.o., NIP 6343042745
- Developer
- Tauron (in-house)
- Also called
- BME Pilchowice; ME Pilchowice I (capacity-market unit)
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- dolnośląskie
- Coordinates
- not found
- Grid operator
- Tauron Dystrybucja (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- 2
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- JRM/1403
- Capacity obligation, MW
- 1.226
- Contract years
- 17
- First delivery year
- 2029
- Four-hour equivalent, MW
- 2.0
- Other capacity contracts
- not found
- Grant
- €0.58m (2,537,976.13 zł). NFOŚiGW FM grant 2,537,976.13 zł (cost 7,315,000 zł); Tauron secured 537.75 m zł of NFOŚiGW co-financing for 11 projects (reported 5 Jan 2026)
- Trader, optimiser or toll
- Tauron group
- Financing
- NFOŚiGW grant (35-45% of cost) plus Tauron
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- planned Q2 2028
Evidence
- Why this status
- NFOŚiGW co-financing secured (energyglobal, 5 Jan 2026) and listed by Tauron among storage investments in execution, "early stage" (H1 2026 report, gramwzielone 24 Sep 2026). No construction reported.
- Its row in the connection lists
- Not matched (anonymised Tauron queue).
- How the contract was matched
- By unit name and Tauron SPV; four-hour equivalent 2.0 MW.
- Where sources disagree
- none recorded
- Still missing
- Site, gmina, connection point and voltage (Tauron, Tauron queue by station code). Construction start. Supplier/EPC (Tauron tenders). Coordinates.
Sources. status (gramwzielone.pl); grant (gov.pl); grant signed (energyglobal.com); mwh (gramwzielone.pl); cm (ure.gov.pl)
Luboń BESS (Tavion) · Financed, not started · · MW
Who
- Owner
- Tavion (Sweden)
- Project company
- not found
- Developer
- Tavion
- Also called
- Tavion sister project to Bydgoszcz
Where
- Gmina
- Luboń
- Powiat
- poznański
- Voivodeship
- wielkopolskie
- Coordinates
- not found
- Grid operator
- Enea Operator (assumed)
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- not found
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- standalone, front-of-meter
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- Part of Tavion's three-park financing (equity plus debt raised Sept 2026); the 13 Oct article implies financial close for Luboń was still pending
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- due about two weeks after 13 Oct 2026
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- grid connection expected 2027
Evidence
- Why this status
- Gramwzielone 13 Oct 2026: construction to start within about two weeks; land, grid connection and permits secured. Gramwzielone 15 Sep 2026: three projects (69 MW) financed and to start in 2026.
- Its row in the connection lists
- Possible Enea queue rows: WA Farm 4 sp. z o.o., Luboń SN, 2 x 10 MW, agreements 2025-12-18 and 2026-01-14 (unconfirmed; matched by town and size).
- How the contract was matched
- not found
- Where sources disagree
- Size not published; Bydgoszcz 20 MW plus Luboń plus a third park total 69 MW.
- Still missing
- MW and MWh, project company, connection point, financial close date, construction start (Tavion).
Sources. status (gramwzielone.pl); financing (gramwzielone.pl); queue (operator.enea.pl)
Third Tavion park (undisclosed site) · Financed, not started · · MW
Who
- Owner
- Tavion (Sweden)
- Project company
- not found
- Developer
- Tavion
- Also called
- not found
Where
- Gmina
- not found
- Powiat
- not found
- Voivodeship
- not found
- Coordinates
- not found
- Grid operator
- not found
- Connection, kV
- not found
- Connection point
- not found
What
- Power, MW
- not found
- Energy, MWh
- not found
- Hours at full power
- not found
- Kind
- standalone (assumed)
- Cells, integrator and builder
- not found
Money
- Capacity unit
- not found
- Capacity obligation, MW
- not found
- Contract years
- not found
- First delivery year
- not found
- Four-hour equivalent, MW
- not found
- Other capacity contracts
- not found
- Grant
- not found
- Trader, optimiser or toll
- not found
- Financing
- Covered by Tavion's September 2026 debt raise
When
- Connection agreement signed
- not found
- Connection date in the agreement
- not found
- Building started
- not found
- Switched on
- not found
- Qualified for PSE’s balancing
- not found
- Commercial operation
- not found
Evidence
- Why this status
- Gramwzielone 13 Oct 2026: a third park is financed by the September debt; site, size and schedule not disclosed.
- Its row in the connection lists
- Not matched.
- How the contract was matched
- not found
- Where sources disagree
- Luboń and this park together are 49 MW if Bydgoszcz is 20 MW of the 69 MW total.
- Still missing
- Everything except owner: site, size, schedule (Tavion).
Sources. status (gramwzielone.pl)
What is known, and what is still missing
For each fact, how many of the batteries in each status have it. The darker the cell, the more complete. Owners, sizes and statuses are near complete; exact sites, building dates, switch-on dates and balancing qualification are the gaps, and most need a person to ask.
| Fact | Running | Switched on | Being built | Financed, not started | All |
|---|---|---|---|---|---|
| Owner | 13 of 13 | 13 of 14 | 12 of 12 | 20 of 20 | 98% |
| Project company and its KRS or NIP | 12 of 13 | 13 of 14 | 10 of 12 | 16 of 20 | 86% |
| Gmina | 9 of 13 | 12 of 14 | 11 of 12 | 10 of 20 | 71% |
| Coordinates | 4 of 13 | 6 of 14 | 7 of 12 | 2 of 20 | 32% |
| Grid operator | 13 of 13 | 13 of 14 | 12 of 12 | 18 of 20 | 95% |
| Connection point | 11 of 13 | 14 of 14 | 9 of 12 | 4 of 20 | 64% |
| Connection voltage | 7 of 13 | 11 of 14 | 10 of 12 | 5 of 20 | 56% |
| Power | 13 of 13 | 14 of 14 | 12 of 12 | 18 of 20 | 97% |
| Energy | 13 of 13 | 11 of 14 | 12 of 12 | 14 of 20 | 85% |
| Cells, integrator or builder | 9 of 13 | 8 of 14 | 9 of 12 | 7 of 20 | 56% |
| Grant | 11 of 13 | 4 of 14 | 7 of 12 | 16 of 20 | 64% |
| Trader, optimiser or toll | 13 of 13 | 4 of 14 | 5 of 12 | 14 of 20 | 61% |
| Financing | 11 of 13 | 3 of 14 | 11 of 12 | 17 of 20 | 71% |
| Connection agreement date | 4 of 13 | 5 of 14 | 9 of 12 | 3 of 20 | 36% |
| Building start | 4 of 13 | 1 of 14 | 10 of 12 | 2 of 20 | 29% |
| Switch-on date | 1 of 13 | 13 of 14 | 0 of 12 | 0 of 20 | 24% |
| Balancing qualification | 2 of 13 | 1 of 14 | 0 of 12 | 0 of 20 | 5% |
| Commercial operation, actual or planned | 11 of 13 | 3 of 14 | 12 of 12 | 15 of 20 | 69% |
Points to check first
- Two batteries owe capacity from 1 January 2027 with no sign of building, and no building permit in either name. Battery ESS-1 sp. z o.o. holds 9.2 MW of obligation (JRM/777) and its owner is not known; PKE Pomorze holds 6.65 MW (JRM/774) for a 7.5 MW Hynfra project near Wrocław.
- Renegia Bulla won capacity for 2026, and none of its batteries is in Tauron’s register. It holds 11 units around Opole, about 50 MW of obligation from 2028, and quarter-long contracts for 50.2 MW in the first and fourth quarters of 2026, which require delivery this year. GUNB’s register shows building permits in its name in Opole, decided on 31 March 2025, and nothing since.
- PSE’s list of 31 August still shows Turośń Kościelna as an agreement, not as connected, though the plant opened on 30 July and the same row gives 30 July as its delivery start.
- For three large batteries, PSE’s agreed connection date is years after the planned opening. Gdańsk II is due around the turn of 2027 and 2028 and its PSE date is June 2032; Dzięgielewo’s is March 2030; Ełk runs on a temporary 220 kV connection, and its PSE row is for a later 400 kV connection, dated February 2030.
- Stary Grodków’s capacity contract is held by Respect Energy, not EDF. URE lists Respect Energy S.A. for JRM/885, which fits the news that Respect Energy now trades the plant. A search by EDF’s name misses it.
- Tauron’s Proszówek battery does not fit the contract of the company that owns it. The register lists 9.5 MW under FF Park PV sp. z o.o.; the same tax number holds JRM/2150, whose obligation stands for a 55 MW four-hour battery, probably the planned 47 MW Proszówek II.
- The grid operators’ registers carry errors, kept as published and flagged in each row: a 3.084 MW battery at Bytnica listed with 0.006 MWh, company founding dates given as storage start dates, a nine-digit KRS number, and a start date after the entry date.
Where the sources disagree
Where two sources give different figures, both are kept, in the row and here. The register uses the owner’s own figure unless a grid operator’s register is more recent.
Every disagreement, battery by battery
| Battery | What differs |
|---|---|
| Turośń Kościelna BESS | PSE queue row is for 294 MW against 200 MW built. The PSE list of 31 Aug 2026 still shows the agreement in force, not "connected", although its delivery start date (30 Jul 2026) has passed. IFC had planned construction completion for June 2026. |
| Stary Grodków BESS | Size: 50 MW / 120 MWh (EDF, gramwzielone, register 120.36 MWh) vs 50 MW / 100 MWh and two-hour duration (gramwzielone 20 Oct 2026). Register installed power 60.192 MW with 50 MW discharge; ESS News says 60 MW installed, 50 MW grid connection. The URE list names Respect Energy, not an EDF company, as capacity supplier. |
| Nowe Czarnowo I BESS | 24 MW / 56 MWh (Energix, Axpo, gramwzielone) vs 28 MW (Modo, Apr 2026). |
| Łozienica BESS | 9.4 MW / 18.8 MWh (NGEN, press) vs 9.636 MW / 19.272 MWh (Enea register). Modo counts 9.4 MW. |
| Bystra hybrid BESS | Gramwzielone (Dec 2022) said it would be connected to the national system after the pilot phase, so its grid status in 2021-2022 is unclear. |
| Garbce traction BESS | Energy: 1.2 MWh usable (Railway Gazette) vs 1.88 MWh total / 1.5 MWh usable (gramwzielone 15 Jun 2021). Power 5.5 MW (Railway Gazette) vs 5 MW (Railtech). |
| Herby BESS | Register: 5.04 MW / 10.03 MWh vs 5 MW / 10 MWh. Register start date (28 Jul) is after first-entry date (10 Jul). |
| Tauron BESS Przewóz | Register: 4.41 MW installed / 4.0 MW discharge / 17.556 MWh, vs 4 MW / 16 MWh in Tauron statements. Register owner is TAURON Ekoenergia, capacity contract holder TAURON BME4. Register lists the site as Rybitwy; Tauron calls it Przewóz (adjacent Kraków districts); matched by Tauron press saying both Kraków units sit on hydro-plant land. Building permit for "BESS Przewóz" (GUNB ST-MA-KR/WNIOSEK/14947/2025) names TAURON BME4 sp. z o.o. as investor; the register lists the battery under TAURON Ekoenergia. |
| Tauron BESS Dąbie | Register: 4.41 MW installed / 4.0 MW discharge / 17.556 MWh vs 4 MW / 16 MWh (Tauron). |
| Cieszanowice BESS | Installed 3,330 kW but maximum charge/discharge 2,000 kW. Gramwzielone (11 Feb 2026) misprinted it as 33 MW. |
| Ełk BESS | EBRD NTS: 200.6 MW and 842 MWh grid-side vs 200 MW / 800 MWh. EBRD planned commissioning for Sept 2026, IFC for April 2026. PSE queue gives 294 MW and 2030 for the permanent connection. |
| Nowe Czarnowo II BESS | 25 MW / 71 MWh (gramwzielone) vs 52 MWh (Energix website, no MW). |
| Zawiercie BESS | Register: 9.823 MW installed, 8.07 MW discharge, 19.6 MWh. |
| Tauron BESS Proszówek | 8 MW / 16 MWh (Tauron, Dec 2025) vs 9.5 MW (Tauron H1 2026) vs 10 MW installed / 8 MW discharge / 20.064 MWh (register). Match of register row "FF Park PV, Grębocice, Kalinówka" to Tauron's "BESS Proszówek (gmina Grębocice, on a PV farm)" is by gmina and timing, not by name. |
| Tauron BESS Kuźnia Raciborska | Register: 7.5 MW installed / 6.9 MW discharge / 30.096 MWh; Tauron Dec 2025: 6.9 MW / 28 MWh; NFOŚiGW grant release (energyglobal): 6.9 MW / 30 MWh. |
| Stawiszyn hybrid PV+BESS | Storage figures in the row: discharge 6 MW, charge 2.5 MW, "mw" 5.04. |
| Września BESS | One-hour battery (5.0 MW / 5.0 MWh). Register KRS has 9 digits. |
| Bytnica BESS | Register gives 0.006 MWh, which cannot be right for a 3.084 MW battery; energy left blank. |
| Kunice BESS | Register discharge power 0.995 MW, below 1 MW; installed 2.032 MW. |
| Goczałkowice-Zdrój BESS | Discharge power 0.861 MW. |
| Dzięgielewo BESS | Capacity delivery from 2029 (gramwzielone, ESS News) vs 2030 main auction in URE list. PSE connection date 2030 vs COD 2027/28. |
| Żarnowiec BESS | Energy: 981 MWh (contract, KPO) vs about 1,020 MWh nominal (H1 2026 report) vs 900 MWh (2024 tender). Power 262 vs 263 MW. Cost 1.555 bn zł gross (contract) vs about 1.3 bn zł (H1 2026 budget). |
| Gdańsk II BESS | PSE agreed connection date 30 Jun 2032 is years after the planned COD (2027/28); a capacity obligation starts 2029. |
| Mieczysławów BESS | COD: early 2028 (energy-storage.news 2 Oct 2026) vs mid-2028 (gramwzielone 1 Oct 2026, which gives Kamionka early 2028). Energy-storage.news says grants of about 1 bn zł; PKO and gramwzielone say about 280 m zł, which matches the ranking list (282.0 m zł). |
| Jedwabno BESS | Construction start Feb 2026 (energyglobal) vs March 2026 (ESS News). Axpo deal Jan 2026 (energyglobal) vs Feb 2026 (gramwzielone) vs May 2026 (ESS News). |
| Trzebinia BESS | Energy: 532 MWh (Columbus 2024) vs 622 MWh (Fluence, DRI) vs 623 MWh (Actis). Power 133 vs 132 MW. Gmina: Columbus 2024 article said gmina Chrzanów; project name and PSE substation (Siersza) point to Trzebinia. |
| Kamionka BESS | COD differs between sources (see Mieczysławów). PSE agreed delivery date 26 Dec 2026 vs COD 2028. |
| Lwówek Śląski BESS | A reader comment claims the site is in a flood zone and faces local opposition (unverified). |
| Osiek Jasielski BESS | Energy: 100 MWh (gramwzielone 2024) vs 120 MWh (OX2 2026). "Construction underway" in July 2024 vs investment decision announced June 2026. |
| Gryfino BESS | Contract value 1.142 bn zł gross (tender result) vs 1.1 bn zł (H1 report). |
| Zwartowo III PV + BESS | PSE agreement date 2010-05-05 reflects the original wind-farm agreement. |
| Tauron hybrid Stare Bogaczowice I | Tauron also holds capacity unit JRM/1399 "ME Stare Bogaczowice 3" (TAURON BME7, 63.121 MW = 103 MW four-hour equivalent), which fits Stare Bogaczowice II (105 MW, no grant), not this project. |
| Trześń BESS | Source is sponsored content. Link between Eko Prime's Trześń contract and PEI PV 03's grant is by place name only. |
| CLIP logistics centre BESS near Poznań | Four systems of about 2 MW each; only the total is above 1 MW per site if each is 2 MW (not stated). |
| Warzyce BESS | Contract value: "nearly 17.6 m zł net" (body) vs "over 17 m zł" (summary). |
| Niegłowice BESS | Contract value: "nearly 17.6 m zł net" (body) vs "over 17 m zł" (summary). |
| Krotoszyn PV-coupled BESS | Source is sponsored content. |
| Luboń BESS | Size not published; Bydgoszcz 20 MW plus Luboń plus a third park total 69 MW. |
| Third Tavion park | Luboń and this park together are 49 MW if Bydgoszcz is 20 MW of the 69 MW total. |
Left out, and why
A project enters the register only with a dated source for building, a signed supply or building contract, or closed financing. Those with only grid conditions, a grid agreement, a capacity contract or a recommended grant are left out; the most notable are here, to be moved in when that evidence appears.
The 28 projects watched, and why each is left out
| Project | Owner | Size, MW / MWh | Why left out |
|---|---|---|---|
| Kobiernice (Porąbka) | EDF + Eurus | 120 MW / 280 MWh | Building "about to start" (Jul 2026); opening H2 2027 |
| Tursko Wielkie | Engie (from R.Power) | 250 MW / 1,000 MWh (+70/280) | Ready to build; building from early 2027 |
| Trębaczew | Engie (from Mithra, Futureal) | 438 / 876 | Ready to build only in Q4 2026 |
| Kozienice | Actis (from DRI) | 112 / 518 | Ready to build; 95 MW capacity contract from 2028 |
| Baczyna | Ergy + Eiffel | 46 / 184 | Ready to build; opening 2028 |
| Jelenia Góra | GoldenPeaks | 8 / 32 | Capacity contract only |
| Wolborz | Gore Street fund | 40 / 160 | Acquired; opening Q1 2028; no building reported |
| Szprotawa | Polenergia | 50 / 101.6 | Grant given up; no contractor chosen |
| Lotnisko, Ścieki, Wojciechowo, Pelplin | PGE | 372 MWh together | Contractors still being chosen; grants of about 178 m zł |
| Storage portfolio | Enea | about 1.4 GW | Contractors to be chosen in 2026; building from 2027 |
| 13 projects | Energa Green Development | up to 119 / 467 | Grants of 210 m zł; no investment decision reported |
| Alastor 1–2, Albus 1–2 | Grenergy | about 32 MW / 135 MWh | Grants; contractor chosen March 2026; no building reported |
| Kowala, Radkowice | Qair | 2 × 200 / 400 | 2029 capacity contracts only |
| Mościska, Zabrze II | Hynfra | 100 MW, 204 MW | 2029 capacity contracts only |
| Seven Krotoszyn units | Mithra | about 1.5 GW four-hour equivalent | 2030 capacity contracts only |
| HEP 001/002; Rybnik | Harmony Energy | 2 × 200; 200 | Capacity contracts; Rybnik decision not taken |
| Ząbkowice, Klikowa, Rzeszów | former Columbus companies (sold to Ruby01A, Oct 2026) | 80, 63, 202 MW | No building reported |
| Krosno; second joint-venture project | Green Capital | up to 220 MW; not disclosed | In development |
| Jodłowa, Kolno I | OX2 | 2 × 99.5 / 199 | In preparation |
| Malbork, Sztum | European Energy | 2 × 42 MW | 2029 capacity contracts and grid agreements only |
| Small 2028-delivery units | Encos, FRV (4), NRG 21, Neo Energy, MEWRO, Claritas, Grand Solar | 3.7–130 MW of obligation | Must deliver from 1 Jan 2028; no building found |
| Battery ESS-1, PKE Pomorze | unknown; Hynfra/HCMG | 9.2 and 6.65 MW of obligation | See the points to check |
| Second Polish project | NGEN | not published | EBRD loan approved; site not named |
| Adamówka | Eko Prime | about 5 MWh, power unknown | May be below 1 MW |
| Rova Systems project | unnamed | 10 / 20 | Investor and site not named |
| Łagisza, Ostrów Szlachecki, Stare Bogaczowice II, Proszówek II, Opole-Zawada, Mierzyn, IH Bytom | Tauron | 20–105 MW | Early stage, no grant |
| Port Polska airport | CPK | 50 MW, two hours | Design contract only |
| Cisna | PGE | about 2 MW | Planned in 2021; no report it was built |
How it was built
Every battery of 1 MW and more in Tauron’s and Enea’s storage registers; the rows marked connected in the four connection lists; then a search for every owner and every capacity contract holder, the storage sections of gramwzielone.pl from May to October 2026 and energy-storage.news back to March 2025, lenders’ disclosures (EBRD, IFC), suppliers’ releases and stock-exchange filings. A status is given only with a dated source: running when a source reports commercial operation or the unit has run for years; switched on when it is connected and powered with no commercial operation reported, which an entry in a storage register shows, since those registers hold connected batteries only; being built when a dated source says building has started; financed when a supply or building contract is signed or financing has closed, and for Tauron alone, a secured grant with Tauron’s statement that the project is in progress. Each battery is matched to its connection row and its capacity unit by tax number, company name, or for Tauron, whose list withholds names, by substation code and size, marked inferred. Money in euros at the ECB rate of 20 October 2026, 4.3768 zł, with złoty in brackets.
Sources: Tauron Dystrybucja and Enea Operator, storage registers under art. 43g of the Energy Law; PSE, Energa-Operator, Enea Operator and Tauron Dystrybucja, connection lists under art. 7 ust. 8l; URE, final results of the capacity auctions for 2027 to 2030 and the quarterly auctions for 2026 and 2027; NFOŚiGW, the ranking list of the storage grant call, 10 December 2025; and the owners’, lenders’, suppliers’ and press sources linked in each battery. PGE Dystrybucja’s area is the weakest: its site could not be read from a data centre.