Since 31 August 2026: 13 batteries entered, 2,851 MW, 8 left, 44 other changes.
PSE publishes its list of the projects asking to connect every month. Every edition is kept from 20 October 2026, and the difference between one edition and the one before is printed, project by project. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.
By month
| Month | Entered | MW entered | Left | Other changes | Respelt or refiled |
|---|---|---|---|---|---|
| September 2026 | 13 | 2,851 | 8 | 44 | · |
Where this can be wrong
A project that lapses, is refused or is connected appears once with its new status and then drops out of PSE’s list, so an edition missed is a record lost. The first edition held is a baseline, not a report.
PSE’s list of storage projects asking to connect
PSE publishes the list monthly. A project that lapses, is refused or is connected appears once with its new status and then drops out, so the editions either side of a deadline are the only record of what left. Projects are matched across editions by PSE’s object id where it gives one, otherwise by name, applicant and point. 2 captures held, 31 August 2026 to 30 September 2026.
30 September 2026, against 31 August 2026
65 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| ME Siedlce, Magazyn EE Siedlce Sp. z o.o (wcześniej: Krajowy System Magazynów Energii Sp. z o.o.) WWP/100239/1 | entered | · | · | 1,050 | new to this list |
| MEE Krzewina, Energia Przykona XVIII Sp. z o.o. MEE Krzewina|Energia Przykona XVIII Sp. z o.o.|Piła Krzewina | entered | · | · | 305 | new to this list |
| MEE BESS Płock, Grenergy Polska Sp. z o.o. MEE BESS Płock|Grenergy Polska Sp. z o.o.|Płock | entered | · | · | 288 | new to this list |
| MEE Świętoszowice, RES Baltic Solar 3 Sp. z o.o. MEE Świętoszowice|RES Baltic Solar 3 Sp. z o.o.|Rokitnica | entered | · | · | 234 | new to this list |
| ME Trzebinia, Fotowoltaika HIG XVIII Sp. z o.o. WWP/100488/1 | entered | · | · | 220 | new to this list |
| ME Kozienice, Magazyn EE Kozienice Sp. z o.o. WWP/100578/1 | entered | · | · | 141 | new to this list |
| ME Baczyna, NRG 22 Sp. z o.o. (wcześniej Projekt Energia Sp. z o.o.) WWP/100718/1 | entered | · | · | 121 | new to this list |
| MEE Buk, Nala Renewables Poland 8 Sp. z o. o. MEE Buk|Nala Renewables Poland 8 Sp. z o. o.|Plewiska | entered | · | · | 110 | new to this list |
| MEE Zwonowice, Energia Przykona XV Sp. z o.o. MEE Zwonowice|Energia Przykona XV Sp. z o.o.|Wielopole | entered | · | · | 103 | new to this list |
| PV+ME Łagów, Elektrownie MPA15 Sp. z o.o. WWP/100587/1 | entered | · | · | 90 | new to this list |
| MEE Krzewina - zm. WP, Energia Przykona XVIII Sp. z o.o. MEE Krzewina - zm. WP|Energia Przykona XVIII Sp. z o.o.|Piła Krzewina | left | · | · | 305 | gone from this list |
| MEE BESS Płock, Grenergy Polska sp. z o.o. MEE BESS Płock|Grenergy Polska sp. z o.o.|Płock | left | · | · | 288 | gone from this list |
| MEE Świętoszowice - zm. WP, RES Baltic Solar 3 Sp. z o.o. MEE Świętoszowice - zm. WP|RES Baltic Solar 3 Sp. z o.o.|Rokitnica | left | · | · | 234 | gone from this list |
| MEE Duninowo, Neo Energia Przykona XXII Sp. z o.o. MEE Duninowo|Neo Energia Przykona XXII Sp. z o.o.|Krzemienica | left | · | · | 198 | gone from this list |
| MEE+PV Buk, Nala Renewables Poland 8 Sp. z o. o. MEE+PV Buk|Nala Renewables Poland 8 Sp. z o. o.|Plewiska | left | · | · | 110 | gone from this list |
| MEE Zwanowice, Energia Przykona XV Sp. z o.o. MEE Zwanowice|Energia Przykona XV Sp. z o.o.|Wielopole | left | · | · | 103 | gone from this list |
| MEE Duninowo, Neo Energia Przykona XXII Sp. z o. o. MEE Duninowo|Neo Energia Przykona XXII Sp. z o. o.|Krzemienica | stage | Application complete, being assessed | Connection conditions issued, no agreement | 424 | changed |
| MEE Duninowo, Neo Energia Przykona XXII Sp. z o. o. MEE Duninowo|Neo Energia Przykona XXII Sp. z o. o.|Krzemienica | conditions issued | · | 2026-09-18 | 424 | changed |
| MEE Janówka, Eplant 84 Sp. z o.o. MEE Janówka|Eplant 84 Sp. z o.o.|Rogowiec | stage | Connection conditions issued, no agreement | Application withdrawn | 414 | changed |
| MEE Połaniec 2, RSE 10 Sp. z o.o. MEE Połaniec 2|RSE 10 Sp. z o.o.|Połaniec | stage | Connection conditions issued, no agreement | Application withdrawn | 400 | changed |
| MEE Środa, FCB Bess Sp. z o.o. MEE Środa|FCB Bess Sp. z o.o.|Kromolice | stage | Connection conditions issued, no agreement | Refused | 369 | changed |
| MEE Środa, FCB Bess Sp. z o.o. MEE Środa|FCB Bess Sp. z o.o.|Kromolice | storage power, MW | 130 | 369 | 369 | up by 239 |
| MEE Środa, FCB Bess Sp. z o.o. MEE Środa|FCB Bess Sp. z o.o.|Kromolice | conditions issued | 2025-05-26 | · | 369 | changed |
| PV+ME Sajczyce, Eplant 83 Sp. z o.o. PV+ME Sajczyce|Eplant 83 Sp. z o.o.|Chełm Systemowa | stage | Application complete, being assessed | Connection conditions issued, no agreement | 308 | changed |
| PV+ME Sajczyce, Eplant 83 Sp. z o.o. PV+ME Sajczyce|Eplant 83 Sp. z o.o.|Chełm Systemowa | conditions issued | · | 2026-09-18 | 308 | changed |
| PV + ME Karsinka II, Elektrownia PV 76 Sp. z o.o. PV + ME Karsinka II|Elektrownia PV 76 Sp. z o.o.|Żydowo Kierzkowo | stage | Application complete, being assessed | Connection conditions issued, no agreement | 302 | changed |
| PV + ME Karsinka II, Elektrownia PV 76 Sp. z o.o. PV + ME Karsinka II|Elektrownia PV 76 Sp. z o.o.|Żydowo Kierzkowo | conditions issued | · | 2026-09-10 | 302 | changed |
| MEE Brańszczyk, NRG 20 Sp. z o.o. MEE Brańszczyk|NRG 20 Sp. z o.o.|Wyszków | stage | Connection conditions issued, no agreement | Connection agreement signed | 300 | changed |
| MEE Brańszczyk, NRG 20 Sp. z o.o. MEE Brańszczyk|NRG 20 Sp. z o.o.|Wyszków | agreement signed | · | 2026-09-04 | 300 | changed |
| PV+ME Barzkowice, Enery Poland Barzkowice Sp. z o.o. PV+ME Barzkowice|Enery Poland Barzkowice Sp. z o.o.|Morzyczyn | stage | Application complete, being assessed | Refused | 273 | changed |
| MEE Miękinia, Neo Energia Przykona XXVII Sp. z o.o. MEE Miękinia|Neo Energia Przykona XXVII Sp. z o.o.|MKAL | stage | Connection conditions issued, no agreement | Application withdrawn | 273 | changed |
| MEE Święte, Iberdrola Renewables Polska Sp. z o.o. MEE Święte|Iberdrola Renewables Polska Sp. z o.o.|Legnica (MKA) | stage | Application complete, being assessed | Connection conditions issued, no agreement | 266 | changed |
| MEE Święte, Iberdrola Renewables Polska Sp. z o.o. MEE Święte|Iberdrola Renewables Polska Sp. z o.o.|Legnica (MKA) | conditions issued | · | 2026-09-18 | 266 | changed |
| MEE Elko 1, Enea Wytwarzanie Sp. z o.o. MEE Elko 1|Enea Wytwarzanie Sp. z o.o.|Kozienice | stage | Connection conditions issued, no agreement | Connection agreement signed | 259 | changed |
| MEE Elko 1, Enea Wytwarzanie Sp. z o.o. MEE Elko 1|Enea Wytwarzanie Sp. z o.o.|Kozienice | agreement signed | · | 2026-09-10 | 259 | changed |
| MEE Żagań Bess, Bess13 Sp. z o.o. MEE Żagań Bess|Bess13 Sp. z o.o.|Marszów (Żagań) | stage | Connection conditions issued, no agreement | Application withdrawn | 208 | changed |
| MEE Żarnowiec, PV Rypin Sp. z o.o. MEE Żarnowiec|PV Rypin Sp. z o.o.|Żarnowiec | stage | Connection agreement signed | Agreement ended | 206 | changed |
| PV + ME Gaworzyce, LS 1 Sp. z o.o. PV + ME Gaworzyce|LS 1 Sp. z o.o.|Polkowice | stage | Application complete, being assessed | Connection conditions issued, no agreement | 202 | changed |
| PV + ME Gaworzyce, LS 1 Sp. z o.o. PV + ME Gaworzyce|LS 1 Sp. z o.o.|Polkowice | conditions issued | · | 2026-09-18 | 202 | changed |
| MEE Raczkowice, KJ5 Sp. z o.o. MEE Raczkowice|KJ5 Sp. z o.o.|Joachimów | stage | Connection conditions issued, no agreement | Conditions lapsed | 200 | changed |
| MEE Suwałki Poddubówek, Neo Energia Przykona III Sp. z o.o. MEE Suwałki Poddubówek|Neo Energia Przykona III Sp. z o.o.|WigryY/(planowana) | stage | Connection conditions issued, no agreement | Application withdrawn | 174 | changed |
| MEE Kamionka, Magazyn EE Kamionka Sp. z o.o. MEE Kamionka|Magazyn EE Kamionka Sp. z o.o.|Adamów | stage | Application complete, being assessed | Connection conditions issued, no agreement | 122 | changed |
| MEE Kamionka, Magazyn EE Kamionka Sp. z o.o. MEE Kamionka|Magazyn EE Kamionka Sp. z o.o.|Adamów | conditions issued | · | 2026-09-04 | 122 | changed |
| MEE Lubsko-Lipinki, LS 12 Sp. z o.o. MEE Lubsko-Lipinki|LS 12 Sp. z o.o.|Marszów (Żagań) | stage | Connection conditions issued, no agreement | Application withdrawn | 120 | changed |
| MEE Plewiska, Alueco Recykling Sp. z o.o. MEE Plewiska|Alueco Recykling Sp. z o.o.|Plewiska | stage | Connection conditions issued, no agreement | Conditions lapsed | 101 | changed |
| MEE Nowy Konik (uprzednio MEE Miłosna EDPR), EDP Renewables Polska Solar Sp. z o.o. MEE Nowy Konik (uprzednio MEE Miłosna EDPR)|EDP Renewables Polska Solar Sp. z o.o.|Stanisławów | stage | Connection conditions issued, no agreement | Connection agreement signed | 101 | changed |
| MEE Nowy Konik (uprzednio MEE Miłosna EDPR), EDP Renewables Polska Solar Sp. z o.o. MEE Nowy Konik (uprzednio MEE Miłosna EDPR)|EDP Renewables Polska Solar Sp. z o.o.|Stanisławów | agreement signed | · | 2026-09-09 | 101 | changed |
| MEE Pogwizdów, Future Bess Sp. z o.o. MEE Pogwizdów|Future Bess Sp. z o.o.|Podborze | stage | Connection agreement signed | Agreement ended | 99 | changed |
| MEE Żydowo Polanów, Qair Polska S. A. MEE Żydowo Polanów|Qair Polska S. A.|Żydowo Kierzkowo | stage | Connection conditions issued, no agreement | Conditions lapsed | 96 | changed |
| MEE BESS Siedlce 1.S 4078, Energix Polska Sp. z o.o. Development Sp.J. MEE BESS Siedlce 1.S 4078|Energix Polska Sp. z o.o. Development Sp.J.|Siedlce Ujrzanów | stage | Application complete, being assessed | Connection conditions issued, no agreement | 88 | changed |
The 50 largest changes are shown. The other 15, each of 88 MW or less, are in the CSV: 3 entered, 2 left, 10 other changes.