Vitreous LabsEnergy transparency
Poland · the change ledger

Since 31 August 2026: 13 batteries entered, 2,851 MW, 8 left, 44 other changes.

PSE publishes its list of the projects asking to connect every month. Every edition is kept from 20 October 2026, and the difference between one edition and the one before is printed, project by project. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.

2captures held across 1 list, the oldest from 31 August 2026
13batteries entered a list, 2,851 MW
8left a list
44other changes that moved something; 0 more were respellings or refilings

By month

MonthEnteredMW enteredLeftOther changesRespelt or refiled
September 2026132,851844·

Where this can be wrong

A project that lapses, is refused or is connected appears once with its new status and then drops out of PSE’s list, so an edition missed is a record lost. The first edition held is a baseline, not a report.

The whole ledger as a CSV.

PSE’s list of storage projects asking to connect

PSE publishes the list monthly. A project that lapses, is refused or is connected appears once with its new status and then drops out, so the editions either side of a deadline are the only record of what left. Projects are matched across editions by PSE’s object id where it gives one, otherwise by name, applicant and point. 2 captures held, 31 August 2026 to 30 September 2026.

30 September 2026, against 31 August 2026

65 changes.

BatteryWhat changedFromToMWOur reading
ME Siedlce, Magazyn EE Siedlce Sp. z o.o (wcześniej: Krajowy System Magazynów Energii Sp. z o.o.)
WWP/100239/1
entered··1,050new to this list
MEE Krzewina, Energia Przykona XVIII Sp. z o.o.
MEE Krzewina|Energia Przykona XVIII Sp. z o.o.|Piła Krzewina
entered··305new to this list
MEE BESS Płock, Grenergy Polska Sp. z o.o.
MEE BESS Płock|Grenergy Polska Sp. z o.o.|Płock
entered··288new to this list
MEE Świętoszowice, RES Baltic Solar 3 Sp. z o.o.
MEE Świętoszowice|RES Baltic Solar 3 Sp. z o.o.|Rokitnica
entered··234new to this list
ME Trzebinia, Fotowoltaika HIG XVIII Sp. z o.o.
WWP/100488/1
entered··220new to this list
ME Kozienice, Magazyn EE Kozienice Sp. z o.o.
WWP/100578/1
entered··141new to this list
ME Baczyna, NRG 22 Sp. z o.o. (wcześniej Projekt Energia Sp. z o.o.)
WWP/100718/1
entered··121new to this list
MEE Buk, Nala Renewables Poland 8 Sp. z o. o.
MEE Buk|Nala Renewables Poland 8 Sp. z o. o.|Plewiska
entered··110new to this list
MEE Zwonowice, Energia Przykona XV Sp. z o.o.
MEE Zwonowice|Energia Przykona XV Sp. z o.o.|Wielopole
entered··103new to this list
PV+ME Łagów, Elektrownie MPA15 Sp. z o.o.
WWP/100587/1
entered··90new to this list
MEE Krzewina - zm. WP, Energia Przykona XVIII Sp. z o.o.
MEE Krzewina - zm. WP|Energia Przykona XVIII Sp. z o.o.|Piła Krzewina
left··305gone from this list
MEE BESS Płock, Grenergy Polska sp. z o.o.
MEE BESS Płock|Grenergy Polska sp. z o.o.|Płock
left··288gone from this list
MEE Świętoszowice - zm. WP, RES Baltic Solar 3 Sp. z o.o.
MEE Świętoszowice - zm. WP|RES Baltic Solar 3 Sp. z o.o.|Rokitnica
left··234gone from this list
MEE Duninowo, Neo Energia Przykona XXII Sp. z o.o.
MEE Duninowo|Neo Energia Przykona XXII Sp. z o.o.|Krzemienica
left··198gone from this list
MEE+PV Buk, Nala Renewables Poland 8 Sp. z o. o.
MEE+PV Buk|Nala Renewables Poland 8 Sp. z o. o.|Plewiska
left··110gone from this list
MEE Zwanowice, Energia Przykona XV Sp. z o.o.
MEE Zwanowice|Energia Przykona XV Sp. z o.o.|Wielopole
left··103gone from this list
MEE Duninowo, Neo Energia Przykona XXII Sp. z o. o.
MEE Duninowo|Neo Energia Przykona XXII Sp. z o. o.|Krzemienica
stageApplication complete, being assessedConnection conditions issued, no agreement424changed
MEE Duninowo, Neo Energia Przykona XXII Sp. z o. o.
MEE Duninowo|Neo Energia Przykona XXII Sp. z o. o.|Krzemienica
conditions issued·2026-09-18424changed
MEE Janówka, Eplant 84 Sp. z o.o.
MEE Janówka|Eplant 84 Sp. z o.o.|Rogowiec
stageConnection conditions issued, no agreementApplication withdrawn414changed
MEE Połaniec 2, RSE 10 Sp. z o.o.
MEE Połaniec 2|RSE 10 Sp. z o.o.|Połaniec
stageConnection conditions issued, no agreementApplication withdrawn400changed
MEE Środa, FCB Bess Sp. z o.o.
MEE Środa|FCB Bess Sp. z o.o.|Kromolice
stageConnection conditions issued, no agreementRefused369changed
MEE Środa, FCB Bess Sp. z o.o.
MEE Środa|FCB Bess Sp. z o.o.|Kromolice
storage power, MW130369369up by 239
MEE Środa, FCB Bess Sp. z o.o.
MEE Środa|FCB Bess Sp. z o.o.|Kromolice
conditions issued2025-05-26·369changed
PV+ME Sajczyce, Eplant 83 Sp. z o.o.
PV+ME Sajczyce|Eplant 83 Sp. z o.o.|Chełm Systemowa
stageApplication complete, being assessedConnection conditions issued, no agreement308changed
PV+ME Sajczyce, Eplant 83 Sp. z o.o.
PV+ME Sajczyce|Eplant 83 Sp. z o.o.|Chełm Systemowa
conditions issued·2026-09-18308changed
PV + ME Karsinka II, Elektrownia PV 76 Sp. z o.o.
PV + ME Karsinka II|Elektrownia PV 76 Sp. z o.o.|Żydowo Kierzkowo
stageApplication complete, being assessedConnection conditions issued, no agreement302changed
PV + ME Karsinka II, Elektrownia PV 76 Sp. z o.o.
PV + ME Karsinka II|Elektrownia PV 76 Sp. z o.o.|Żydowo Kierzkowo
conditions issued·2026-09-10302changed
MEE Brańszczyk, NRG 20 Sp. z o.o.
MEE Brańszczyk|NRG 20 Sp. z o.o.|Wyszków
stageConnection conditions issued, no agreementConnection agreement signed300changed
MEE Brańszczyk, NRG 20 Sp. z o.o.
MEE Brańszczyk|NRG 20 Sp. z o.o.|Wyszków
agreement signed·2026-09-04300changed
PV+ME Barzkowice, Enery Poland Barzkowice Sp. z o.o.
PV+ME Barzkowice|Enery Poland Barzkowice Sp. z o.o.|Morzyczyn
stageApplication complete, being assessedRefused273changed
MEE Miękinia, Neo Energia Przykona XXVII Sp. z o.o.
MEE Miękinia|Neo Energia Przykona XXVII Sp. z o.o.|MKAL
stageConnection conditions issued, no agreementApplication withdrawn273changed
MEE Święte, Iberdrola Renewables Polska Sp. z o.o.
MEE Święte|Iberdrola Renewables Polska Sp. z o.o.|Legnica (MKA)
stageApplication complete, being assessedConnection conditions issued, no agreement266changed
MEE Święte, Iberdrola Renewables Polska Sp. z o.o.
MEE Święte|Iberdrola Renewables Polska Sp. z o.o.|Legnica (MKA)
conditions issued·2026-09-18266changed
MEE Elko 1, Enea Wytwarzanie Sp. z o.o.
MEE Elko 1|Enea Wytwarzanie Sp. z o.o.|Kozienice
stageConnection conditions issued, no agreementConnection agreement signed259changed
MEE Elko 1, Enea Wytwarzanie Sp. z o.o.
MEE Elko 1|Enea Wytwarzanie Sp. z o.o.|Kozienice
agreement signed·2026-09-10259changed
MEE Żagań Bess, Bess13 Sp. z o.o.
MEE Żagań Bess|Bess13 Sp. z o.o.|Marszów (Żagań)
stageConnection conditions issued, no agreementApplication withdrawn208changed
MEE Żarnowiec, PV Rypin Sp. z o.o.
MEE Żarnowiec|PV Rypin Sp. z o.o.|Żarnowiec
stageConnection agreement signedAgreement ended206changed
PV + ME Gaworzyce, LS 1 Sp. z o.o.
PV + ME Gaworzyce|LS 1 Sp. z o.o.|Polkowice
stageApplication complete, being assessedConnection conditions issued, no agreement202changed
PV + ME Gaworzyce, LS 1 Sp. z o.o.
PV + ME Gaworzyce|LS 1 Sp. z o.o.|Polkowice
conditions issued·2026-09-18202changed
MEE Raczkowice, KJ5 Sp. z o.o.
MEE Raczkowice|KJ5 Sp. z o.o.|Joachimów
stageConnection conditions issued, no agreementConditions lapsed200changed
MEE Suwałki Poddubówek, Neo Energia Przykona III Sp. z o.o.
MEE Suwałki Poddubówek|Neo Energia Przykona III Sp. z o.o.|WigryY/(planowana)
stageConnection conditions issued, no agreementApplication withdrawn174changed
MEE Kamionka, Magazyn EE Kamionka Sp. z o.o.
MEE Kamionka|Magazyn EE Kamionka Sp. z o.o.|Adamów
stageApplication complete, being assessedConnection conditions issued, no agreement122changed
MEE Kamionka, Magazyn EE Kamionka Sp. z o.o.
MEE Kamionka|Magazyn EE Kamionka Sp. z o.o.|Adamów
conditions issued·2026-09-04122changed
MEE Lubsko-Lipinki, LS 12 Sp. z o.o.
MEE Lubsko-Lipinki|LS 12 Sp. z o.o.|Marszów (Żagań)
stageConnection conditions issued, no agreementApplication withdrawn120changed
MEE Plewiska, Alueco Recykling Sp. z o.o.
MEE Plewiska|Alueco Recykling Sp. z o.o.|Plewiska
stageConnection conditions issued, no agreementConditions lapsed101changed
MEE Nowy Konik (uprzednio MEE Miłosna EDPR), EDP Renewables Polska Solar Sp. z o.o.
MEE Nowy Konik (uprzednio MEE Miłosna EDPR)|EDP Renewables Polska Solar Sp. z o.o.|Stanisławów
stageConnection conditions issued, no agreementConnection agreement signed101changed
MEE Nowy Konik (uprzednio MEE Miłosna EDPR), EDP Renewables Polska Solar Sp. z o.o.
MEE Nowy Konik (uprzednio MEE Miłosna EDPR)|EDP Renewables Polska Solar Sp. z o.o.|Stanisławów
agreement signed·2026-09-09101changed
MEE Pogwizdów, Future Bess Sp. z o.o.
MEE Pogwizdów|Future Bess Sp. z o.o.|Podborze
stageConnection agreement signedAgreement ended99changed
MEE Żydowo Polanów, Qair Polska S. A.
MEE Żydowo Polanów|Qair Polska S. A.|Żydowo Kierzkowo
stageConnection conditions issued, no agreementConditions lapsed96changed
MEE BESS Siedlce 1.S 4078, Energix Polska Sp. z o.o. Development Sp.J.
MEE BESS Siedlce 1.S 4078|Energix Polska Sp. z o.o. Development Sp.J.|Siedlce Ujrzanów
stageApplication complete, being assessedConnection conditions issued, no agreement88changed

The 50 largest changes are shown. The other 15, each of 88 MW or less, are in the CSV: 3 entered, 2 left, 10 other changes.