Poland · who holds the queue

220 applicants hold the 279 storage projects in PSE’s queue

As PSE names them in its list of 30 September 2026, with every project, its stage, the date it reached it, the connection date a signed agreement sets, and what the Grid Act asks of it.

ApplicantGroupMW agreed or connectedMW in conditionsMW applied for
Respect Energy Pomerania Sp. z o.o.Respect Energy1,00000
Magazyn EE Siedlce Sp. z o.o.Greenvolt (KKR)60000
Mithra Bess E Sp. z o.o.ENGIE43200
Mithra Bess C Sp. z o.o.Mithra Energy / Barrallier Limited43200
PGE Inwest 22 Sp. z o.o.PGE40000
Pomeranian Energy Sp. z o.o.Proland Group sp. z o.o.39600
LS4 Sp. z o.o.Kudła Fundacja Rodzinna W Organizacji34900
NRG 20 Sp. z o.o.Sagittarius Power Pte. Ltd.3007510
Elektrownia PV 96 Sp. z o.o.R.Power3000222
Magazyn EE Ełk Sp. z o.o.Greenvolt (KKR)29400
PGE Inwest 14 Sp. z o.o.PGE2633130
Enea Wytwarzanie Sp. z o.o.Enea25900
Elektrownia PV 61 Sp. z o.o.R.Power25000
Magazyn Energii Tursko Wielkie Sp. z o.o.ENGIE25000
Grand Solar 23 Sp. z o.o.Equinor24700
PV Lipnica Sp. z o.o.Enlight22500
Eplant 83 Sp. z o.o.Sunly2203080
ZE PAK S.A.ZE PAK20600
Aarten ES Sp. z o.o.Arten ES sp. z o.o.20400
Alwind Sp. z o.o.Vortex Energy20400
Fotowoltaika HIG XXI Sp. z o.o.Gemstone ASI20200
BI4 Sp. z o.o.Reveria Limited20200
Grand Solar 4 Sp. z o.o.Equinor20100
Global Constellation Sp. z o.o.EDF20000
HEP1 Sp. z o.o.Harmony Energy20000
HEP6 Sp. z o.o.Harmony Energy20000
Qair Polska S.A.Qair2001,0000
Magazyn EE Mieczysławów Sp. z o.o.Northland Power2002450
Power Reserve Sp. z o.o.Mixed: natural persons 70% / Fundacja Rodzinna Pola W Organizacji 30%20000
Bess10 Sp. z o.o.Prime Capital20000
Future Bess Sp. z o. o.SCPL Midco II GmbH19800
Neo Energia Przykona X Sp. z o.o.ZE PAK18400
Respect Energy Solar Zwartowo Sp. z o.o.Respect Energy18400
Greenvolt Wind 7 Sp. z o.o.Greenvolt (KKR)17600
EE Green 4 Sp. z o.o.European Energy1681680
CSH Renewables III Sp. z o.o.EDP Renováveis (EDP)16800
OX2 Green Sp. z o.o.OX2 (EQT)159147171
EW Pasat Sp. z o.o.SCPL Midco II GmbH15200
Neo Energia Przykona IX Sp. z o.o.Goalscreen Holdings Limited13800
Fotowoltaika HIG XVIII Sp. z o.o.DTEK1320220
Grenergy Polska Sp. z o.o.Grenergy1267470
Solar Plant 25 Sp. z o.o.Solar Plant 25 sp. z o.o.12200
ME Kobiernice Sp. z o.o.EDF / Eurus Energy (joint venture, 50% each)1201410
Neo Energia Przykona VII Sp. z o.o.Goalscreen Holdings Limited12000
Grand Solar 5 Sp. z o.o.Equinor11900
Grand Solar 28 Sp. z o.o.Equinor11900
Krajowy System Magazynów Energii Sp. z o.o.Actis11200
Eplant 90 Sp. z o.o.Sunly10700
EDP Renewables Polska Solar Sp. z o.o.EDP Renováveis (EDP)10100
Bess6 Sp. z o.o.LVL Fundacja Rodzinna / Fundacja Rodzinna Rodziny Mendyk (joint venture, 50% each)10000
BESS 9 Sp. z o.o.Enlight10000
Magazyn EE Kamionka Sp. z o.o.Northland Power1001220
QES 1 Sp. z o.o.Qair10000
G Solar Energy 2 Sp. z o.o.Equinor9700
Neo Energia Przykona XV Sp. z o.o.Goalscreen Holdings Limited9700
Neo Energia Przykona XII Sp. z o.o.Goalscreen Holdings Limited9700
PGE Energia Odnawialna S.A.PGE8900
FRV Poland I Sp. z o.o.FRV812010
Fotowoltaika HIG XV Sp. z o.o.Iberdrola8000
Magazyn Energii Tursko WielkieENGIE7000
Eplant 51 Sp. z o.o.Sunly69069
Fotowoltaika HIG XX Sp. z o.o.Gemstone ASI6300
JF Energia Dobroń Sp. z o.o.Volta Investissements5900
Solar West II Sp. z o.o.OX2 (EQT)5400
Future Bess Sp. z o.o.SCPL Midco II GmbH5100
BESS Pelplin Sp. z o.o.not traced5100
RSE 10 Sp. z o.o.Emeren5000
Nala Renewables 5 Sp. z o.o.Nala Renewables (Trafigura / IFM)5000
Sun Energy Projekt Sp. z o.o.Nofar Energy5000
Platerowka Energy Park Sp. z o.o.Ignitis4900
NRG 22 Sp. z o.o.NRG 22 sp. z o.o.4600
Elektrownia PV Lasocice Sp. z o.o.R.Power4400
NALA Renewables 6 Sp. z o.o.Nala Renewables (Trafigura / IFM)4000
ENERGA Storage Sp. z o.o.Orlen (via Energa)03161,680
MP Energetyka Sp. z o.onot traced001,295
Elektrownia PV 106 Sp. z o.o.R.Power01,1040
Magazyn EE Siedlce Sp. z o.o (wcześniej: Krajowy System Magazynów Energii Sp. z o.o.)not traced001,050
Szamal Investment Sp. z o.o.Masdar / Taaleri (joint venture, 50% each)0302302
Altilium Energy 1 Sp. z o.o.Altilium Energy P.S.A.05990
PV 1030 sp. z o.o.Sonnedix (J.P. Morgan)05900
Statkraft Poland Invest 2 Sp. z o.o.Statkraft05760
Solarig Development Poland Sp. z o.o.Solarig05180
R.Power Solar Sp. z o.o.R.Power05040
PVE 185 Sp. z o.o.Pro Vento (PVE)05020
Solar-Ledno Sp. z o.o.not traced00500
PV 1360 Sp. z o.o.RWE04990
Altilium Energy 2 Sp. z o.o.Altilium Energy P.S.A.04980
Eplant 58 Sp. z o.o.Sunly04830
TAURON Wytwarzanie S.A.Tauron04650
ARPH06 Sp. z o.o.Mixed: BWS Advisors sp. z o.o. 40% / Arsago Renewables 30% / Fundacja Rodzinna Rodziny Grabowskich 20% / Oneau sp. z o.o. 10%04550
Mithra Bess H Sp. z o.o.Mithra Energy / Barrallier Limited04320
Mithra Bess F Sp. z o.o.Mithra Energy / Barrallier Limited04320
Mithra Bess J Sp. z o.o.Mithra Energy / Barrallier Limited04320
Mithra Bess D Sp. z o.o.Mithra Energy / Barrallier Limited04320
Mithra Bess A Sp. z o.o.Futureal / Mithra Energy / Barrallier Limited (joint venture, 50% each)04320
Neo Energia Przykona XXII Sp. z o. o.NEO Energia Przykona XXII sp. z o.o.04240
Eplant 32 Sp. z o.o.Sunly04140
Eplant 36 Sp. z o.o.Sunly04140
ESVJ-1 Sp. z o.o.Mixed: natural persons 52.27% / Przedsiębiorstwo Usług Technicznych I Handlowych Polcarbo sp.j. Ryskalok & S-KA 38.64%04090
PGE Inwest 25 Sp. z o.o.PGE04010
PGE INWEST 25 Sp. z o.o.PGE04010
HEP3 Sp. z o.o.Harmony Energy04010
RSE 11 Sp. z o.o.Emeren04000
EE Boleszkowice Sp. z o.o.European Energy04000
VRS 12 Sp. z o.o.Greenvolt (KKR)04000
Europejska Grupa Energetyczna Sp. z o.o.not traced00400
Intelligent Energy Wrocław Sp. z o.o.Energosuccess sp. z o.o.03720
Elektrownia PV Szara Sp. z o.o.not traced00338
Iberdrola Renewables Polska Sp. z o.o.Iberdrola03270
PV 1420 Sp. z o.o.RWE03250
Energa Storage Sp. z o.o.Orlen (via Energa)03160
Projekt-Solartechnik Development Sp. z o.o.Famur / Grenevia (TDJ)03070
Energia Przykona XVIII Sp. z o.o.Energia Przykona XVIII sp. z o.o.03050
Elektrownia PV 76 Sp. z o.o.not traced03020
CEPV 87 Sp. z o.o.Pro Vento (PVE)03000
Magazyn EE Turośń Kościelna Sp. z o.o.Greenvolt (KKR)29400
Eplant 35 Sp. z o.o.Sunly02760
Eplant 81 Sp. z o.o.Sunly02760
Solarfarm Brzezinka Sp. z o.o.VSB02760
Eplant 73 Sp. z o.o.Sunly02760
Eplant 72 Sp. z o.o.Sunly02760
Eplant 64 Sp. z o.o.Sunly02760
Elektrownie MPA15 Sp. z o.o.not traced00269
Lightsource Development Polska Sp. z o.o.Lightsource bp (bp)02520
Carmona Holdings Sp. z o.o.Fundacja Rodzinna Rodziny Domalik-Plakwicz W Organizacji02510
FRV Pomeralia Sp. z o.o.FRV02510
Bess4 Poland I Sp. z o.o.Enlight02460
Tarnawa Solar Park Sp. z o.o.Greenvolt (KKR)02460
Enea Nowa Energia Sp. z o.o.Enea020040
Energetyka Szczecinek Sp. z o.o.Energetyka Szczecinek sp. z o.o.02260
Green Park XXIX Sp. z o.o.Green Capital02200
NE GW 3 Sp. z o.o.NE GW 3 sp. z o.o.02200
TAURON Zielona Energia Sp. z o.o.Tauron02180
KJ7 Sp. z o.o.Grupa Elektrofarm sp. z o.o.02100
Projekt-Solartechnik Dystrybucja Sp. z o.o.not traced00210
Arten Green Sp. z o.o.Arten Green sp. z o.o.02040
Bess12 Sp. z o.o.Mixed: Invest VC Group sp. z o.o. 45% / LUX Perpetua Fundacja Rodzinna W Organizacji / Bohemia ONE sp. z o.o. / Salata Fundacja Rodzinna Z Siedzibą W Krakowie (partners in a partnership) 35% / LVL Energy sp. z o.o. 20%02040
Vivos 10 Sp. z o.o.Vortex Energy02040
Vivos 2 Sp. z o.o.Vortex Energy02040
Vivos 4 Sp. z o.o.Vortex Energy02040
Vivos 8 Sp. z o.o.Vortex Energy02040
Vortex Energy Solar Sp. z o.o.Vortex Energy02040
Vortex Energy Windpark Sp. z o.o.Vortex Energy02040
Neo Energia Przykona XXIII Sp. z o.o.NEO Energia Przykona XXIII sp. z o.o.02020
Energy Wrocław Sp. z o. o.not traced02020
Elektrownia PV 92 Sp. z o.o.R.Power02020
Galileo Lasuno Green Energy Sp. z o.o.not traced00202
BESS 2 Ostrów Wlkp Sp. z o.o.Lafrentz Polska sp. z o.o.02020
LS 1 Sp. z o.o.not traced02020
GF Perun Sp. z o.o.GreenFuture UK Wind Limited02000
PAC Akwamaryn Sp. z o.o.Pacifico Energy Partners02000
Harker Sp. z o.o.PAD RES02000
PVE 165 Sp. z o.o.Pro Vento (PVE)02000
VRS 10 Sp. z o.o.Greenvolt (KKR)02000
VRS 11 Sp. z o.o.Greenvolt (KKR)02000
PVE 3 Sp. z o.o.not traced02000
VRS 24 Sp. z o.o.Greenvolt (KKR)02000
EE Green 7 Sp. z o. o.European Energy01950
Lasuno Energy Sp. z o.o.KGAL01900
Neo Energia Przykona XXI Sp. z o.o.NEO Energia Przykona XXI sp. z o.o.01900
Energia Przykona XX Sp. z o.o.Energia Przykona XX sp. z o.o.01860
Stigma Sp. z o.o.not traced00184
TORP Energy Bis Sp. z o.o.not traced00181
SWM Renewables Poland Sp. z o.o.Stadtwerke München (City of Munich)01700
SUN-POL Trzecia Sp. z o.o.ib vogt01700
Enpower Płużnica Sp. z o.o.Mixed: natural persons 74.34% / Fundacja Rodzinna Czajkowskich 25.67%01620
Sunren X Sp. z o.o.Enlight047111
Powerme Sp. z o.o.TJG Fundacja Rodzinna01520
Domrel Inwestycje Sp. z o.o.Mixed: MCH Investment sp. z o.o. 20% / RK Investment sp. z o.o. 19.33% / JZ Investment sp. z o.o. 16% / TZK Inwestycje sp. z o.o. 16%01500
Magazyn EE Kozienice Sp. z o.o.Actis00141
Elektrownia PV 121 Sp. z o.o.not traced00141
Solarus Plus Sp. z o.o.Solarus Plus sp. z o.o.01400
Elektrownia PV Żary-Marciszów Sp. z o.o.not traced00136
FCB Bess Sp. z o.o.Cameonio B.V.01300
RWE Solar Poland Sp. z o.oRWE01230
NRG 22 Sp. z o.o. (wcześniej Projekt Energia Sp. z o.o.)not traced00121
PEG-ZS Sp. z o.o.not traced00120
EE Jelonki Sp. z o.o.European Energy01160
Elektrownia PV 124 Sp. z o.o.not traced00111
Nala Renewables Poland 1 Sp. z o.o.Nala Renewables (Trafigura / IFM)01100
Nala Renewables Poland 8 Sp. z o. o.not traced01100
Solar Webs Bis Sp. z o.o.not traced00105
Nord Wind Energy I Sp. z o.o.Enerconet S.A.01020
Econergy PV 3 Sp. z o.o.Econergy01010
Energy Solar 77 Sp. z o.o.Equinor01010
PAD RES Bełżyce Sp. z o.o.PAD RES01000
FFKM 112 Sp. z o.o.TotalEnergies01000
Solar SGE II Sp. z o.o.Solar SGE II sp. z o.o.01000
QWP Wądroże Wielkie 2 Sp. z o.o.Qair01000
VRS 3 Sp. z o.o.Greenvolt (KKR)01000
Econergy Poland Sp. z o.o.Econergy01000
PV Konin Sp. z o.o.Scatec0980
Energix Polska Sp. z o.o. Development Sp. j.Energix0950
PV Godetowo Sp. z o.o.not traced0088
Energix Polska Sp. z o.o. Development Sp.J.Energix0880
Energia Dobroń I Sp. z o.o.JF Invest sp. z o.o.0870
RWE Solar Poland Sp. z o.o.RWE0870
PGE Energia Ciepła S.A.PGE0850
Energix Polska Sp. z o.o. Development Sp.j.Energix0840
JINKO Power Poland Sp. z o.o.not traced0081
Relax Wind Park I Sp. z o.o.not traced0080
Farma Odnawialnej Energii Glinka Sp. z o. o.not traced0080
K&F Green Energy Sp. z o.o.Ennecor sp. z o.o.0750
PV Gorzów Sp. z o.o.not traced0075
Polskie Farmy PV2 Sp. z o. o.Atlas Energy Limited0650
Sunren VII Sp. z o.o.not traced0060
FRV PSH 17 Sp. z o.o.FRV0600
Boryszew Inwestycje Sp. z o.o.Boryszew S.A.0530
West Warsaw Energy Park Sp. z o.o.West Warsaw Holding Limited0520
Insun Energy IV Sp. z o.o.Insun Energy IV sp. z o.o.0510
Lewice 1 PV Sp. z o.o.not traced0050
La Energy Sp. z o.o.VSB0500
Wena Projekt 6 Sp. z o.o.Wena Projekt 6 sp. z o.o.0450
Solarpark Polanów Sp. z o.o.not traced0045
Elektrownia PV 82 Sp. z o.o.not traced0440
Fotones Sp. z o.o.not traced0400
Słoneczne OZE 5 Sp. z o.o.not traced0034
PGE Energia Odnawialna Sp. z o.o.PGE0250
Certipalion Investments Sp. z o.o.not traced0200
Worm 33 Sp. z o.o.not traced0150

Respect Energy Pomerania Sp. z o.o.

Group, traced through KRS: Respect Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Zwartowo VChoczewoConnection agreement signed27 February 202631 August 2031Agreement signed before 30 April 2026 with a connection date of 31 August 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)1,000

Magazyn EE Siedlce Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Siedlce 1 i 2Siedlce UjrzanówConnection agreement signed9 February 202230 December 2027Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed600

Mithra Bess E Sp. z o.o.

Group, traced through KRS: ENGIE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess TrębaczewTrębaczewConnection agreement signed31 July 202630 June 2032·432

Mithra Bess C Sp. z o.o.

Group, traced through KRS: Mithra Energy / Barrallier Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess BaczynaBaczyna SystemowaConnection agreement signed5 December 202530 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)432

PGE Inwest 22 Sp. z o.o.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE GryfinoKrajnikConnection agreement signed26 May 202530 November 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)400

Pomeranian Energy Sp. z o.o.

Group, traced through KRS: Proland Group sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE SłosinkoŻydowo KierzkowoConnection agreement signed15 October 202530 September 2029Agreement signed before 30 April 2026 with a connection date of 30 September 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)396

LS4 Sp. z o.o.

Group, traced through KRS: Kudła Fundacja Rodzinna W Organizacji. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE UstronieCzarnaConnection agreement signed4 September 202530 December 2029Agreement signed before 30 April 2026 with a connection date of 30 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)349

NRG 20 Sp. z o.o.

Group, traced through KRS: Sagittarius Power Pte. Ltd.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Baczyna 3Baczyna SystemowaConnection conditions issued, no agreement24 January 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)301
MEE Radzanowo-PłockPłockConnection conditions issued, no agreement28 October 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)300
MEE BrańszczykWyszkówConnection agreement signed4 September 202631 March 2030·300
MEE Średnia WieśNysaConnection conditions issued, no agreement13 November 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)150

Elektrownia PV 96 Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE DzięgielewoPłockConnection agreement signed22 July 202631 March 2030·300
PV+ME PieniążkowoPelplinApplication complete, being assessed3 June 2026··222

Magazyn EE Ełk Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE EłkEłk BisConnection agreement signed1 February 202228 February 2030Agreement signed before 30 April 2026 with a connection date of 28 February 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed294

PGE Inwest 14 Sp. z o.o.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KartoszynoŻarnowiecConnection conditions issued, no agreement20 August 2026··313
MEE KartoszynoŻarnowiecConnection agreement signed15 November 202330 June 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)263

Enea Wytwarzanie Sp. z o.o.

Group, traced through KRS: Enea. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Elko 1KozieniceConnection agreement signed10 September 202628 February 2031·259

Elektrownia PV 61 Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Gdańsk 2Gdańsk BłoniaConnection agreement signed18 March 202531 August 2029Agreement signed before 30 April 2026 with a connection date of 31 August 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)250

Magazyn Energii Tursko Wielkie Sp. z o.o.

Group, traced through KRS: ENGIE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Tursko WielkiePołaniecConnection agreement signed22 May 202530 June 2032Agreement signed before 30 April 2026 with a connection date of 30 June 2032, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)250

Grand Solar 23 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE TurówJoachimówConnection agreement signed20 March 202531 January 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)150
MEE ChałupkiRadkowiceConnection agreement signed13 May 202530 June 2029Agreement signed before 30 April 2026 with a connection date of 30 June 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)97

PV Lipnica Sp. z o.o.

Group, traced through KRS: Enlight. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE SokóleStanisławówConnection agreement signed2 January 202615 October 2029Agreement signed before 30 April 2026 with a connection date of 15 October 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)225

Eplant 83 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME SajczyceChełm SystemowaConnection conditions issued, no agreement18 September 2026··308
PV+MEE SajczyceChełmConnection agreement signed5 December 202526 May 2031Agreement signed before 30 April 2026 with a connection date of 26 May 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)220

ZE PAK S.A.

Group, traced through KRS: ZE PAK. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KoninKoninConnection agreement signed28 May 202531 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)206

Aarten ES Sp. z o.o.

Group, traced through KRS: Arten ES sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE LeźnoGdańsk PrzyjaźńConnection agreement signed25 February 202630 June 2029Agreement signed before 30 April 2026 with a connection date of 30 June 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)204

Alwind Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE+FW Moryń CedyniaKrajnikConnection agreement signed3 July 202615 July 2032·204

Fotowoltaika HIG XXI Sp. z o.o.

Group, traced through KRS: Gemstone ASI. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE RzeszówRzeszówConnection agreement signed19 September 202431 January 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)202

BI4 Sp. z o.o.

Group, traced through KRS: Reveria Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Klikowa 2KlikowaConnection agreement signed30 November 202431 January 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)202

Grand Solar 4 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KoźleBlachowniaConnection agreement signed12 February 20257 May 2033Agreement signed before 30 April 2026 with a connection date of 7 May 2033, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)201

Global Constellation Sp. z o.o.

Group, traced through KRS: EDF. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE HEP 002WyszkówConnection agreement signed17 October 202430 September 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)200

HEP1 Sp. z o.o.

Group, traced through KRS: Harmony Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE HEP 001OłtarzewConnection agreement signed11 April 202517 January 2030Agreement signed before 30 April 2026 with a connection date of 17 January 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)200

HEP6 Sp. z o.o.

Group, traced through KRS: Harmony Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Harmony Energy WielopoleWielopoleConnection agreement signed24 March 202631 January 2032Agreement signed before 30 April 2026 with a connection date of 31 January 2032, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)200

Qair Polska S.A.

Group, traced through KRS: Qair. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ChoczewoChoczewoConnection conditions issued, no agreement20 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)1,000
PV+MEE WiszniceChełmConnection agreement signed12 August 202630 December 2030·100
MEE ChęcinyRadkowiceConnection agreement signed29 May 202531 January 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)100

Magazyn EE Mieczysławów Sp. z o.o.

Group, traced through KRS: Northland Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MieczysławówPątnówConnection conditions issued, no agreement4 September 2026··245
MEE MieczysławówPątnówConnection agreement signed1 February 202231 January 2028Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed200

Power Reserve Sp. z o.o.

Group, traced through KRS: Mixed: natural persons 70% / Fundacja Rodzinna Pola W Organizacji 30%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Skawina 2SkawinaConnection agreement signed8 October 202531 December 2029Agreement signed before 30 April 2026 with a connection date of 31 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)200

Bess10 Sp. z o.o.

Group, traced through KRS: Prime Capital. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Zabrze IIRokitnicaConnection agreement signed28 August 20265 December 2031·200

Future Bess Sp. z o. o.

Group, traced through KRS: SCPL Midco II GmbH. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Wólka Czarnińska - zm. WPStanisławówConnection agreement signed28 May 202631 December 2029·101
MEE OstrowiecOstrowiecConnection agreement signed28 April 202631 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)97

Neo Energia Przykona X Sp. z o.o.

Group, traced through KRS: ZE PAK. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PawłowiczkiBlachowniaConnection agreement signed28 February 20257 May 2033Agreement signed before 30 April 2026 with a connection date of 7 May 2033, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)184

Respect Energy Solar Zwartowo Sp. z o.o.

Group, traced through KRS: Respect Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Zwartowo III (wcześniej PV Zwartowo; FW Choczewo)ŻarnowiecConnection agreement signed5 May 201010 April 2030Agreement signed before 30 April 2026 with a connection date of 10 April 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed184

Greenvolt Wind 7 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Kozienice 3KozieniceConnection agreement signed28 April 202630 November 2030Agreement signed before 30 April 2026 with a connection date of 30 November 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)176

EE Green 4 Sp. z o.o.

Group, traced through KRS: European Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE ŁęgPołaniecConnection conditions issued, no agreement23 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)168
MEE Rzeszów 2RzeszówConnection agreement signed19 June 202630 June 2030·168

CSH Renewables III Sp. z o.o.

Group, traced through KRS: EDP Renováveis (EDP). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Jarosław IIIJarosław (planowana)Connection agreement signed28 August 202630 November 2031·168

OX2 Green Sp. z o.o.

Group, traced through KRS: OX2 (EQT). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME Olecko BisEłk BisApplication incomplete···171
MEE Kolno 1OstrołękaConnection agreement signed6 September 20241 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)100
MEE Olecko BisEłk BisConnection agreement signed30 October 202430 June 2029Agreement signed before 30 April 2026 with a connection date of 30 June 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)59
PV+MEE Olecko BisEłk BisConnection conditions issued, no agreement22 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)58
MEE Jarosław - Krakowska 1Jarosław (planowana)Connection conditions issued, no agreement2 December 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)50
PV+MEE ZłotogłowiceNysaConnection conditions issued, no agreement5 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)39

EW Pasat Sp. z o.o.

Group, traced through KRS: SCPL Midco II GmbH. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MicigózdKielceConnection agreement signed26 June 202530 September 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)101
MEE SarnówŁagiszaConnection agreement signed27 December 202530 September 2031Agreement signed before 30 April 2026 with a connection date of 30 September 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)51

Neo Energia Przykona IX Sp. z o.o.

Group, traced through KRS: Goalscreen Holdings Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KrerowoKromoliceConnection agreement signed7 July 202531 December 2030Agreement signed before 30 April 2026 with a connection date of 31 December 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)138

Fotowoltaika HIG XVIII Sp. z o.o.

Group, traced through KRS: DTEK. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME TrzebiniaSierszaApplication complete, being assessed10 September 2026··220
MEE TrzebiniaSierszaConnection agreement signed3 July 202430 January 2027Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)132

Grenergy Polska Sp. z o.o.

Group, traced through KRS: Grenergy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS TurówJoachimówConnection conditions issued, no agreement9 June 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)165
MEE BESS PlewiskaPlewiskaConnection conditions issued, no agreement27 June 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)126
MEE Bess WyszkówWyszkówConnection conditions issued, no agreement6 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)126
MEE PłochocinOłtarzewConnection agreement signed29 April 202631 December 2029Agreement signed before 30 April 2026 with a connection date of 31 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)126
MEE Starołęcka 1PlewiskaConnection conditions issued, no agreement30 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)110
MEE DunowoDunowoConnection conditions issued, no agreement5 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)110
MEE GRN GdańskGdańsk BłoniaConnection conditions issued, no agreement5 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)110

Solar Plant 25 Sp. z o.o.

Group, traced through KRS: Solar Plant 25 sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Ełk Solar Plant 25Ełk BisConnection agreement signed15 April 202517 December 2029Agreement signed before 30 April 2026 with a connection date of 17 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)122

ME Kobiernice Sp. z o.o.

Group, traced through KRS: EDF / Eurus Energy (joint venture, 50% each). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KobierniceBujakówConnection conditions issued, no agreement17 July 2026··141
MEE KobierniceBujakówConnection agreement signed27 November 202430 August 2027Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)120

Neo Energia Przykona VII Sp. z o.o.

Group, traced through KRS: Goalscreen Holdings Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PromnikKielceConnection agreement signed13 March 202531 December 2031Agreement signed before 30 April 2026 with a connection date of 31 December 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)120

Grand Solar 5 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Lubiszyn PołudnieBaczyna SystemowaConnection agreement signed6 October 202531 March 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)119

Grand Solar 28 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŻagańMarszów (Żagań)Connection agreement signed6 November 202530 April 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)119

Krajowy System Magazynów Energii Sp. z o.o.

Group, traced through KRS: Actis. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KozieniceKozieniceConnection agreement signed3 November 202130 May 2028Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed112

Eplant 90 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE DźbówJoachimówConnection agreement signed4 September 202526 June 2030Agreement signed before 30 April 2026 with a connection date of 26 June 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)107

EDP Renewables Polska Solar Sp. z o.o.

Group, traced through KRS: EDP Renováveis (EDP). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Nowy Konik (uprzednio MEE Miłosna EDPR)StanisławówConnection agreement signed9 September 202631 December 2036·101

Bess6 Sp. z o.o.

Group, traced through KRS: LVL Fundacja Rodzinna / Fundacja Rodzinna Rodziny Mendyk (joint venture, 50% each). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Grzybowice 2RokitnicaConnection agreement signed29 December 202529 August 2029Agreement signed before 30 April 2026 with a connection date of 29 August 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)100

BESS 9 Sp. z o.o.

Group, traced through KRS: Enlight. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mościska BESSMościskaConnection agreement signed7 January 20261 September 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)100

Magazyn EE Kamionka Sp. z o.o.

Group, traced through KRS: Northland Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KamionkaAdamówConnection conditions issued, no agreement4 September 2026··122
MEE Kamionka (Turek 1 etap 1)AdamówConnection agreement signed15 March 202229 October 2027Agreement signed before 30 April 2022: it expires unless a final building permit is notified within three months (art. 14); from when those months run is disputed100

QES 1 Sp. z o.o.

Group, traced through KRS: Qair. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Kosów MniejszyRożkiConnection agreement signed7 May 202530 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)100

G Solar Energy 2 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE LipnoLeszno GronowoConnection agreement signed3 January 202530 January 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)97

Neo Energia Przykona XV Sp. z o.o.

Group, traced through KRS: Goalscreen Holdings Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MikułowaMikułowaConnection agreement signed30 April 202531 December 2029Agreement signed before 30 April 2026 with a connection date of 31 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)97

Neo Energia Przykona XII Sp. z o.o.

Group, traced through KRS: Goalscreen Holdings Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ZgierzZgierzConnection agreement signed12 May 202531 March 2030Agreement signed before 30 April 2026 with a connection date of 31 March 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)97

PGE Energia Odnawialna S.A.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE+PV Lotnisko (za pośrednictwem istniejącej infrastrutkury FW Osieki)ŻarnowiecConnection agreement signed11 August 202631 December 2030·89

FRV Poland I Sp. z o.o.

Group, traced through KRS: FRV. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Murat - zm. WPOlsztyn MątkiConnection conditions issued, no agreement23 December 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)201
MEE+PV Goplan Elana 3Toruń ElanaConnection agreement signed12 October 202531 October 2031Agreement signed before 30 April 2026 with a connection date of 31 October 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)81

Fotowoltaika HIG XV Sp. z o.o.

Group, traced through KRS: Iberdrola. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ZąbkowiceZąbkowiceConnection agreement signed2 May 202424 May 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)80

Magazyn Energii Tursko Wielkie

Group, traced through KRS: ENGIE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PołaniecPołaniecConnection agreement signed19 May 202531 December 2028Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)70

Eplant 51 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Konin ŻagańskiŻagań (planowana)Application being checked···69
MEE Konin ŻagańskiMarszów (Żagań)Connection agreement signed30 May 202510 October 2030Agreement signed before 30 April 2026 with a connection date of 10 October 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)69

Fotowoltaika HIG XX Sp. z o.o.

Group, traced through KRS: Gemstone ASI. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KlikowaKlikowaConnection agreement signed18 September 202431 January 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)63

JF Energia Dobroń Sp. z o.o.

Group, traced through KRS: Volta Investissements. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PabianicePabianiceConnection agreement signed24 July 202630 September 2030·59

Solar West II Sp. z o.o.

Group, traced through KRS: OX2 (EQT). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE LubiszynBaczyna SystemowaConnection agreement signed16 June 202516 July 2031Agreement signed before 30 April 2026 with a connection date of 16 July 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)54

Future Bess Sp. z o.o.

Group, traced through KRS: SCPL Midco II GmbH. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Szczurowa 1KlikowaConnection agreement signed17 July 202531 December 2029Agreement signed before 30 April 2026 with a connection date of 31 December 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)51

BESS Pelplin Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KlonówkaPelplinConnection agreement signed19 September 202531 March 2031Agreement signed before 30 April 2026 with a connection date of 31 March 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)51

RSE 10 Sp. z o.o.

Group, traced through KRS: Emeren. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE RadkowiceRadkowiceConnection agreement signed16 October 202531 August 2029Agreement signed before 30 April 2026 with a connection date of 31 August 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)50

Nala Renewables 5 Sp. z o.o.

Group, traced through KRS: Nala Renewables (Trafigura / IFM). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BełchatówRogowiecConnection agreement signed9 December 202531 May 2029Agreement signed before 30 April 2026 with a connection date of 31 May 2029, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)50

Sun Energy Projekt Sp. z o.o.

Group, traced through KRS: Nofar Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Bakałarzewo-GóraEłk BisConnection agreement signed28 April 202630 June 2030Agreement signed before 30 April 2026 with a connection date of 30 June 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)50

Platerowka Energy Park Sp. z o.o.

Group, traced through KRS: Ignitis. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PlaterówkaMikułowaConnection agreement signed14 July 202531 January 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)49

NRG 22 Sp. z o.o.

Group, traced through KRS: NRG 22 sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BaczynaBaczyna SystemowaConnection agreement signed4 April 20253 March 2029Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)46

Elektrownia PV Lasocice Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE LasociceNysaConnection agreement signed7 June 20248 June 2030Agreement signed before 30 April 2026 with a connection date of 8 June 2030, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)44

NALA Renewables 6 Sp. z o.o.

Group, traced through KRS: Nala Renewables (Trafigura / IFM). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Zgierz 1ZgierzConnection agreement signed29 April 202631 May 2031Agreement signed before 30 April 2026 with a connection date of 31 May 2031, after 30 April 2029: it expires unless new security is lodged by 30 October 2026 (art. 11); Agreement signed between 30 April 2022 and 30 April 2026: it expires unless a final building permit for 80% of the power and energy is notified within 30 months, by 30 October 2028 (art. 13)40

ENERGA Storage Sp. z o.o.

Group, traced through KRS: Orlen (via Energa). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME BESS ChoczewoChoczewoApplication complete, being assessed31 July 2026··1,200
ME BESS OlsztynOlsztyn MątkiApplication complete, being assessed31 July 2026··480
MEE SkowronkowaGrudziądz WęgrowoConnection conditions issued, no agreement23 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)316

MP Energetyka Sp. z o.o

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MątkiOlsztyn MątkiApplication complete, being assessed17 April 2026··1,295

Elektrownia PV 106 Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Giełczyn 4Łomża SystemowaConnection conditions issued, no agreement13 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)302
MEE CzekanówOstrówConnection conditions issued, no agreement20 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)300
MEE WodnicaKrzemienicaConnection conditions issued, no agreement4 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)300
MEE WieńkowoGlinkiConnection conditions issued, no agreement27 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

Magazyn EE Siedlce Sp. z o.o (wcześniej: Krajowy System Magazynów Energii Sp. z o.o.)

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME SiedlceSiedlce UjrzanówApplication being checked···1,050

Szamal Investment Sp. z o.o.

Group, traced through KRS: Masdar / Taaleri (joint venture, 50% each). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME MazewoEłk BisApplication complete, being assessed11 May 2026··302
PV+MEE MazewoEłk BisConnection conditions issued, no agreement9 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)302

Altilium Energy 1 Sp. z o.o.

Group, traced through KRS: Altilium Energy P.S.A.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BałtówNORYConnection conditions issued, no agreement4 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200
MEE TwardowiceŁagiszaConnection conditions issued, no agreement30 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200
MEE BrzeźnicaKozieniceConnection conditions issued, no agreement8 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

PV 1030 sp. z o.o.

Group, traced through KRS: Sonnedix (J.P. Morgan). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Piła 1 BESSDunowoConnection conditions issued, no agreement19 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)590

Statkraft Poland Invest 2 Sp. z o.o.

Group, traced through KRS: Statkraft. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Stanisławów SKStanisławówConnection conditions issued, no agreement2 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)304
MEE Ożarów SKOłtarzewConnection conditions issued, no agreement2 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)152
MEE Kielce SKKielceConnection conditions issued, no agreement2 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)120

Solarig Development Poland Sp. z o.o.

Group, traced through KRS: Solarig. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS Piła KrzewinaPiła KrzewinaConnection conditions issued, no agreement28 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)154
MEE Żydowo 2 SolarigŻydowo KierzkowoConnection conditions issued, no agreement28 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)150
MEE Żydowo SolarigŻydowo KierzkowoConnection conditions issued, no agreement8 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)118
MEE BESS Zgierz SolarigZgierzConnection conditions issued, no agreement28 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)96

R.Power Solar Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Kobylin-RogówStryków (Dmosin)Connection conditions issued, no agreement19 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)302
MEE Jawiszów Kamienna GóraBoguszówConnection conditions issued, no agreement29 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

PVE 185 Sp. z o.o.

Group, traced through KRS: Pro Vento (PVE). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE MieszkowiceBaczyna SystemowaConnection conditions issued, no agreement23 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)502

Solar-Ledno Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME Solar LednoLeśniów and nowa SE RS "Wcinka"Application complete, being assessed25 March 2026··500

PV 1360 Sp. z o.o.

Group, traced through KRS: RWE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE NiemstówCzarnaConnection conditions issued, no agreement12 November 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)499

Altilium Energy 2 Sp. z o.o.

Group, traced through KRS: Altilium Energy P.S.A.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Czajków-ALTILIUMWitoniaConnection conditions issued, no agreement13 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)299
MEE KoluszkiStryków (Dmosin)Connection conditions issued, no agreement21 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

Eplant 58 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Gniewczyna ŁuńcuckaJarosław (planowana)Connection conditions issued, no agreement18 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)414
PV+MEE Rusocin 2NysaConnection conditions issued, no agreement4 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)69

TAURON Wytwarzanie S.A.

Group, traced through KRS: Tauron. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Jaworzno III 2ByczynaConnection conditions issued, no agreement25 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)232
MEE Jaworzno III 4ByczynaConnection conditions issued, no agreement25 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)232

ARPH06 Sp. z o.o.

Group, traced through KRS: Mixed: BWS Advisors sp. z o.o. 40% / Arsago Renewables 30% / Fundacja Rodzinna Rodziny Grabowskich 20% / Oneau sp. z o.o. 10%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Ostrowiec ŚwiętokrzyskiOstrowiecConnection conditions issued, no agreement29 June 2026··455

Mithra Bess H Sp. z o.o.

Group, traced through KRS: Mithra Energy / Barrallier Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess ŻarnowiecŻarnowiecConnection conditions issued, no agreement31 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)432

Mithra Bess F Sp. z o.o.

Group, traced through KRS: Mithra Energy / Barrallier Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess KrzemienicaKrzemienicaConnection conditions issued, no agreement28 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)432

Mithra Bess J Sp. z o.o.

Group, traced through KRS: Mithra Energy / Barrallier Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess PłockPłockConnection conditions issued, no agreement28 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)432

Mithra Bess D Sp. z o.o.

Group, traced through KRS: Mithra Energy / Barrallier Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess SłupskKrzemienicaConnection conditions issued, no agreement28 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)432

Mithra Bess A Sp. z o.o.

Group, traced through KRS: Futureal / Mithra Energy / Barrallier Limited (joint venture, 50% each). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Mithra Bess ŻydowoŻydowo KierzkowoConnection conditions issued, no agreement28 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)432

Neo Energia Przykona XXII Sp. z o. o.

Group, traced through KRS: NEO Energia Przykona XXII sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE DuninowoKrzemienicaConnection conditions issued, no agreement18 September 2026··424

Eplant 32 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE NiwniceMikułowaConnection conditions issued, no agreement4 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)414

Eplant 36 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KalinowoŁomża SystemowaConnection conditions issued, no agreement22 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)414

ESVJ-1 Sp. z o.o.

Group, traced through KRS: Mixed: natural persons 52.27% / Przedsiębiorstwo Usług Technicznych I Handlowych Polcarbo sp.j. Ryskalok & S-KA 38.64%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE GolasowicePodborze (planowana)Connection conditions issued, no agreement11 August 2026··409

PGE Inwest 25 Sp. z o.o.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE RybnikWielopoleConnection conditions issued, no agreement12 August 2026··401

PGE INWEST 25 Sp. z o.o.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE RogowiecRogowiecConnection conditions issued, no agreement10 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)401

HEP3 Sp. z o.o.

Group, traced through KRS: Harmony Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Harmony Energy JarząbkowicePodborzeConnection conditions issued, no agreement15 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)401

RSE 11 Sp. z o.o.

Group, traced through KRS: Emeren. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MątkiOlsztyn MątkiConnection conditions issued, no agreement7 August 2026··400

EE Boleszkowice Sp. z o.o.

Group, traced through KRS: European Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+FW+MEE BoleszkowiceDunowoConnection conditions issued, no agreement30 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)400

VRS 12 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Ełk Bess 1Ełk BisConnection conditions issued, no agreement22 November 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200
MEE Ełk Bess 2Ełk BisConnection conditions issued, no agreement22 November 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

Europejska Grupa Energetyczna Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME BesiekierzZgierzApplication complete, being assessed31 July 2026··400

Intelligent Energy Wrocław Sp. z o.o.

Group, traced through KRS: Energosuccess sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Wrocław 4TrębaczewConnection conditions issued, no agreement19 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)372

Elektrownia PV Szara Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME JaśkiNOR (planowana)Application complete, being assessed10 August 2026··192
PV+ME Biesiekierz CieszynDunowoApplication complete, being assessed3 June 2026··146

Iberdrola Renewables Polska Sp. z o.o.

Group, traced through KRS: Iberdrola. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŚwięteLegnica (MKA)Connection conditions issued, no agreement18 September 2026··266
PV+MEE ŁukaszówCzarnaConnection conditions issued, no agreement19 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)61

PV 1420 Sp. z o.o.

Group, traced through KRS: RWE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Leśniów 1LeśniówConnection conditions issued, no agreement12 August 2026··273
MEE Leśniów 2LeśniówConnection conditions issued, no agreement12 August 2026··51

Energa Storage Sp. z o.o.

Group, traced through KRS: Orlen (via Energa). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Ostrołęka EOstrołękaConnection conditions issued, no agreement11 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)316

Projekt-Solartechnik Development Sp. z o.o.

Group, traced through KRS: Famur / Grenevia (TDJ). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KopciowiceByczynaConnection conditions issued, no agreement19 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)307

Energia Przykona XVIII Sp. z o.o.

Group, traced through KRS: Energia Przykona XVIII sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE KrzewinaPiła KrzewinaConnection conditions issued, no agreement18 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)305

Elektrownia PV 76 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME Karsinka IIŻydowo KierzkowoConnection conditions issued, no agreement10 September 2026··302

CEPV 87 Sp. z o.o.

Group, traced through KRS: Pro Vento (PVE). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BulkowoPłockConnection conditions issued, no agreement11 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)300

Magazyn EE Turośń Kościelna Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Turośń KościelnaNarewDelivering energy since 30 July 2026, by PSE’s list3 November 202130 July 2026·294

Eplant 35 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE DusznikiPlewiskaConnection conditions issued, no agreement7 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Eplant 81 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE BrzozowaPołaniecConnection conditions issued, no agreement1 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Solarfarm Brzezinka Sp. z o.o.

Group, traced through KRS: VSB. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE BrzezinkaPasikurowiceConnection conditions issued, no agreement11 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Eplant 73 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE MarianowoMorzyczynConnection conditions issued, no agreement22 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Eplant 72 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Wysoka IIA 200 - zm. WPRożkiConnection conditions issued, no agreement22 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Eplant 64 Sp. z o.o.

Group, traced through KRS: Sunly. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Żydowo IIIŻydowo KierzkowoConnection conditions issued, no agreement17 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)276

Elektrownie MPA15 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME ŁagówLeśniówApplication complete, being assessed3 September 2026··90
PV+ME ŁagówLeśniówApplication incomplete···90
PV+ME ŁagówLeśniówApplication incomplete···90

Lightsource Development Polska Sp. z o.o.

Group, traced through KRS: Lightsource bp (bp). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Plewiska KomornikiPlewiskaConnection conditions issued, no agreement22 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)252

Carmona Holdings Sp. z o.o.

Group, traced through KRS: Fundacja Rodzinna Rodziny Domalik-Plakwicz W Organizacji. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŁomżaŁomża SystemowaConnection conditions issued, no agreement14 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200
MEE 504 PlewiskaPlewiskaConnection conditions issued, no agreement21 October 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)51

FRV Pomeralia Sp. z o.o.

Group, traced through KRS: FRV. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE NiwnicaNysaConnection conditions issued, no agreement17 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)251

Bess4 Poland I Sp. z o.o.

Group, traced through KRS: Enlight. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Koryta TorzymBaczyna SystemowaConnection conditions issued, no agreement22 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)246

Tarnawa Solar Park Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Tarnawa 2Baczyna SystemowaConnection conditions issued, no agreement6 February 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)180
PV+MEE TarnawaBaczyna SystemowaConnection conditions issued, no agreement7 January 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)66

Enea Nowa Energia Sp. z o.o.

Group, traced through KRS: Enea. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Enea KozieniceKozieniceConnection conditions issued, no agreement11 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200
PV+ME Lubno IIIBaczyna Systemowa (planowana)Application complete, being assessed27 March 2026··40

Energetyka Szczecinek Sp. z o.o.

Group, traced through KRS: Energetyka Szczecinek sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE+ODB Kompleks energetyczno-chemicznyŻydowo KierzkowoConnection conditions issued, no agreement14 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)226

Green Park XXIX Sp. z o.o.

Group, traced through KRS: Green Capital. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Wróblik KrólewskiKrosno IskrzyniaConnection conditions issued, no agreement7 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)220

NE GW 3 Sp. z o.o.

Group, traced through KRS: NE GW 3 sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Baczyna 2Baczyna SystemowaConnection conditions issued, no agreement28 November 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)220

TAURON Zielona Energia Sp. z o.o.

Group, traced through KRS: Tauron. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Stalowa Wola 4ChmielówConnection conditions issued, no agreement20 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)218

KJ7 Sp. z o.o.

Group, traced through KRS: Grupa Elektrofarm sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE GłogówekBlachowniaConnection conditions issued, no agreement23 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)210

Projekt-Solartechnik Dystrybucja Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME Pątnów PokojePątnówApplication complete, being assessed4 August 2026··210

Arten Green Sp. z o.o.

Group, traced through KRS: Arten Green sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ParnowoDunowoConnection conditions issued, no agreement20 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Bess12 Sp. z o.o.

Group, traced through KRS: Mixed: Invest VC Group sp. z o.o. 45% / LUX Perpetua Fundacja Rodzinna W Organizacji / Bohemia ONE sp. z o.o. / Salata Fundacja Rodzinna Z Siedzibą W Krakowie (partners in a partnership) 35% / LVL Energy sp. z o.o. 20%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Kędzierzyn-Koźle BessBlachowniaConnection conditions issued, no agreement30 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vivos 10 Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Vivos 10Baczyna SystemowaConnection conditions issued, no agreement12 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vivos 2 Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Vivos 2KromoliceConnection conditions issued, no agreement12 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vivos 4 Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Vivos 4Żydowo KierzkowoConnection conditions issued, no agreement12 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vivos 8 Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Vivos 8KrzemienicaConnection conditions issued, no agreement12 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vortex Energy Solar Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Vortex EnergyPiła KrzewinaConnection conditions issued, no agreement12 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Vortex Energy Windpark Sp. z o.o.

Group, traced through KRS: Vortex Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE+FW PrabutyGrudziądz WęgrowoConnection conditions issued, no agreement14 October 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)204

Neo Energia Przykona XXIII Sp. z o.o.

Group, traced through KRS: NEO Energia Przykona XXIII sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŻydowoŻydowo KierzkowoConnection conditions issued, no agreement27 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

Energy Wrocław Sp. z o. o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE WrocławPasikurowiceConnection conditions issued, no agreement31 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

Elektrownia PV 92 Sp. z o.o.

Group, traced through KRS: R.Power. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE WysokaBaczyna SystemowaConnection conditions issued, no agreement29 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

Galileo Lasuno Green Energy Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME LeśniówLeśniówApplication complete, being assessed29 April 2026··202

BESS 2 Ostrów Wlkp Sp. z o.o.

Group, traced through KRS: Lafrentz Polska sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS 2 Ostrów WielkopolskiOstrówConnection conditions issued, no agreement15 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)202

LS 1 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME GaworzycePolkowiceConnection conditions issued, no agreement18 September 2026··202

GF Perun Sp. z o.o.

Group, traced through KRS: GreenFuture UK Wind Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE DębnoBaczyna SystemowaConnection conditions issued, no agreement18 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

PAC Akwamaryn Sp. z o.o.

Group, traced through KRS: Pacifico Energy Partners. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE GrodnaWitoniaConnection conditions issued, no agreement31 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

Harker Sp. z o.o.

Group, traced through KRS: PAD RES. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BłonieOłtarzewConnection conditions issued, no agreement18 June 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

PVE 165 Sp. z o.o.

Group, traced through KRS: Pro Vento (PVE). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Pelplin 2000PelplinConnection conditions issued, no agreement17 June 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

VRS 10 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŁobezMorzyczynConnection conditions issued, no agreement19 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100
PV+MEE ŁobezMorzyczynConnection conditions issued, no agreement16 January 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

VRS 11 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE GębarzówRożkiConnection conditions issued, no agreement2 January 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

PVE 3 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Nakło-BESSPiła KrzewinaConnection conditions issued, no agreement23 December 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

VRS 24 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE BiskupiecGrudziądz WęgrowoConnection conditions issued, no agreement10 December 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)200

EE Green 7 Sp. z o. o.

Group, traced through KRS: European Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE DzierzgońPelplinConnection conditions issued, no agreement29 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)195

Lasuno Energy Sp. z o.o.

Group, traced through KRS: KGAL. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE DołhobyczówMokreConnection conditions issued, no agreement5 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)159
MEE Kotowice PęcławPolkowiceConnection conditions issued, no agreement24 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)31

Neo Energia Przykona XXI Sp. z o.o.

Group, traced through KRS: NEO Energia Przykona XXI sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Żarnowiec 2ŻarnowiecConnection conditions issued, no agreement17 November 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)190

Energia Przykona XX Sp. z o.o.

Group, traced through KRS: Energia Przykona XX sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Krerowo 2KromoliceConnection conditions issued, no agreement17 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)186

Stigma Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME ZwartowoŻarnowiecApplication complete, being assessed3 August 2026··184

TORP Energy Bis Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME P.A.M.Żydowo KierzkowoApplication complete, being assessed14 April 2026··181

SWM Renewables Poland Sp. z o.o.

Group, traced through KRS: Stadtwerke München (City of Munich). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE+PV+FW JasnaGdańsk BłoniaConnection conditions issued, no agreement25 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)170

SUN-POL Trzecia Sp. z o.o.

Group, traced through KRS: ib vogt. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS OpoleGroszowiceConnection conditions issued, no agreement27 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)170

Enpower Płużnica Sp. z o.o.

Group, traced through KRS: Mixed: natural persons 74.34% / Fundacja Rodzinna Czajkowskich 25.67%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE PłużnicaGrudziądz WęgrowoConnection conditions issued, no agreement13 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)162

Sunren X Sp. z o.o.

Group, traced through KRS: Enlight. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME Czerwona Woda 2Mikułowa and ŚwiebodziceApplication complete, being assessed4 August 2026··111
PV+MEE Czerwona WodaMikułowaConnection conditions issued, no agreement18 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)47

Powerme Sp. z o.o.

Group, traced through KRS: TJG Fundacja Rodzinna. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Wysoka-PołudnieBaczyna SystemowaConnection conditions issued, no agreement15 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)81
MEE GronówkoLeszno GronowoConnection conditions issued, no agreement9 September 2026··71

Domrel Inwestycje Sp. z o.o.

Group, traced through KRS: Mixed: MCH Investment sp. z o.o. 20% / RK Investment sp. z o.o. 19.33% / JZ Investment sp. z o.o. 16% / TZK Inwestycje sp. z o.o. 16%. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Widuchowa 1KrajnikConnection conditions issued, no agreement16 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)150

Magazyn EE Kozienice Sp. z o.o.

Group, traced through KRS: Actis. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME KozieniceKozieniceApplication being checked···141

Elektrownia PV 121 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Parszowice 2CzarnaApplication complete, being assessed3 June 2026··141

Solarus Plus Sp. z o.o.

Group, traced through KRS: Solarus Plus sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Solarus PlusKrzemienicaConnection conditions issued, no agreement14 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)140

Elektrownia PV Żary-Marciszów Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Żary MarciszówŻagań (planowana)Application complete, being assessed24 June 2026··136

FCB Bess Sp. z o.o.

Group, traced through KRS: Cameonio B.V.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŚrodaKromoliceConnection conditions issued, no agreement26 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)130

RWE Solar Poland Sp. z o.o

Group, traced through KRS: RWE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Strzelce OpolskieDobrzeńConnection conditions issued, no agreement3 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)123

NRG 22 Sp. z o.o. (wcześniej Projekt Energia Sp. z o.o.)

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME BaczynaBaczyna Systemowa (planowana)Application being checked···121

PEG-ZS Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
Park Solarny PEG - ZSZąbkowiceApplication complete, being assessed21 May 2026··120

EE Jelonki Sp. z o.o.

Group, traced through KRS: European Energy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE JelonkiOlsztyn MątkiConnection conditions issued, no agreement31 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)116

Elektrownia PV 124 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Spręcowo SętalOlsztyn MątkiApplication complete, being assessed3 June 2026··111

Nala Renewables Poland 1 Sp. z o.o.

Group, traced through KRS: Nala Renewables (Trafigura / IFM). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE BukowicaPolkowiceConnection conditions issued, no agreement14 November 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)110

Nala Renewables Poland 8 Sp. z o. o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BukPlewiskaConnection conditions issued, no agreement2 September 2026··110

Solar Webs Bis Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Micigózd - PiekoszówKielceApplication complete, being assessed24 March 2026··105

Nord Wind Energy I Sp. z o.o.

Group, traced through KRS: Enerconet S.A.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Wyszków TurzynWyszkówConnection conditions issued, no agreement9 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)102

Econergy PV 3 Sp. z o.o.

Group, traced through KRS: Econergy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE JaniszewkoPelplinConnection conditions issued, no agreement22 October 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)101

Energy Solar 77 Sp. z o.o.

Group, traced through KRS: Equinor. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE ŚwiebodziceŚwiebodziceConnection conditions issued, no agreement17 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)101

PAD RES Bełżyce Sp. z o.o.

Group, traced through KRS: PAD RES. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
FW+MEE BełżyceAbramowiceConnection conditions issued, no agreement18 September 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

FFKM 112 Sp. z o.o.

Group, traced through KRS: TotalEnergies. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE ŚwidwinDunowoConnection conditions issued, no agreement6 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

Solar SGE II Sp. z o.o.

Group, traced through KRS: Solar SGE II sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Turośń Kościelna 2NarewConnection conditions issued, no agreement22 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

QWP Wądroże Wielkie 2 Sp. z o.o.

Group, traced through KRS: Qair. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE JenkówŚwiebodziceConnection conditions issued, no agreement4 March 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

VRS 3 Sp. z o.o.

Group, traced through KRS: Greenvolt (KKR). Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE GołdapEłk BisConnection conditions issued, no agreement18 February 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

Econergy Poland Sp. z o.o.

Group, traced through KRS: Econergy. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE PolanówŻydowo KierzkowoConnection conditions issued, no agreement18 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)100

PV Konin Sp. z o.o.

Group, traced through KRS: Scatec. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Honoratka 1 - zm. WPKoninConnection conditions issued, no agreement26 February 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)98

Energix Polska Sp. z o.o. Development Sp. j.

Group, traced through KRS: Energix. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE 4045 Chmielów 2SChmielówConnection conditions issued, no agreement16 October 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)95

PV Godetowo Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME GodetowoŻarnowiecApplication complete, being assessed29 April 2026··88

Energix Polska Sp. z o.o. Development Sp.J.

Group, traced through KRS: Energix. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS Siedlce 1.S 4078Siedlce UjrzanówConnection conditions issued, no agreement10 September 2026··88

Energia Dobroń I Sp. z o.o.

Group, traced through KRS: JF Invest sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Dobroń - zm. WPPabianiceConnection conditions issued, no agreement29 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)87

RWE Solar Poland Sp. z o.o.

Group, traced through KRS: RWE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE StrugaŚwiebodziceConnection conditions issued, no agreement14 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)87

PGE Energia Ciepła S.A.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Kraków 2WandaConnection conditions issued, no agreement14 November 2024·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)85

Energix Polska Sp. z o.o. Development Sp.j.

Group, traced through KRS: Energix. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE BESS SuwałkiWigryY and (planowana)Connection conditions issued, no agreement3 August 2026··84

JINKO Power Poland Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
ME Reptowo 70/280MorzyczynApplication complete, being assessed3 August 2026··81

Relax Wind Park I Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
FW+PV+ME MargoninPiła KrzewinaApplication complete, being assessed29 April 2026··80

Farma Odnawialnej Energii Glinka Sp. z o. o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME GlinkiLeszno GronowoApplication complete, being assessed12 March 2026··80

K&F Green Energy Sp. z o.o.

Group, traced through KRS: Ennecor sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE LyskiWielopoleConnection conditions issued, no agreement29 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)75

PV Gorzów Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Ściechówek GorzówBaczyna Systemowa (planowana)Application complete, being assessed28 April 2026··75

Polskie Farmy PV2 Sp. z o. o.

Group, traced through KRS: Atlas Energy Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE Suwałki 1 - Suwałki 2WigryY and (planowana)Connection conditions issued, no agreement14 January 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)65

Sunren VII Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME RybnikWielopoleApplication complete, being assessed31 July 2026··60

FRV PSH 17 Sp. z o.o.

Group, traced through KRS: FRV. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Plewiska GołuskiPlewiskaConnection conditions issued, no agreement20 May 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)60

Boryszew Inwestycje Sp. z o.o.

Group, traced through KRS: Boryszew S.A.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Boryszew Sochaczew 1CPKKConnection conditions issued, no agreement21 February 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)53

West Warsaw Energy Park Sp. z o.o.

Group, traced through KRS: West Warsaw Holding Limited. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Legacz (dawniej Stanisławów)StanisławówConnection conditions issued, no agreement7 April 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)52

Insun Energy IV Sp. z o.o.

Group, traced through KRS: Insun Energy IV sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Stalowa Wola 3ChmielówConnection conditions issued, no agreement23 December 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)51

Lewice 1 PV Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME Lewice 1SBO (planowana)Application incomplete···50

La Energy Sp. z o.o.

Group, traced through KRS: VSB. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Łambinowice 2NysaConnection conditions issued, no agreement16 July 2026··50

Wena Projekt 6 Sp. z o.o.

Group, traced through KRS: Wena Projekt 6 sp. z o.o.. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE LubinCzarnaConnection conditions issued, no agreement20 November 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)45

Solarpark Polanów Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME Solarpark PolanówŻydowo KierzkowoApplication complete, being assessed7 April 2026··45

Elektrownia PV 82 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE RecławRecławConnection conditions issued, no agreement29 August 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)44

Fotones Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV + ME NiedźwiedźLeśniówConnection conditions issued, no agreement10 September 2026··40

Słoneczne OZE 5 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+ME Projekt WiduchowaKrajnikApplication complete, being assessed10 March 2026··34

PGE Energia Odnawialna Sp. z o.o.

Group, traced through KRS: PGE. Who owns the pipeline.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
MEE Żarnowiec 3ŻarnowiecConnection conditions issued, no agreement19 March 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)25

Certipalion Investments Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE IłowaMarszów (Żagań)Connection conditions issued, no agreement3 July 2025·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)20

Worm 33 Sp. z o.o.

Project, as PSE names itConnection pointStageDate of that stageAgreed connection dateThe Grid ActMW
PV+MEE MikolinDobrzeńConnection conditions issued, no agreement7 April 2026·Conditions issued before 30 April 2026 and no agreement: they lapse unless the advance is topped up by 30 October 2026 (art. 9)15

PSE S.A., the art. 7 ust. 8l list, edition of 30 September 2026.