Finland has 2,057 MW of batteries connected, by Fingrid’s own count, and nobody publishes which they are. Their owners name 393 MW of them, and 1,434 MW more being built.
Fingrid’s open data read 16 October 2026, twice a week. The owners’ releases read to 12 October 2026 and checked against their own words. Reserve prices to October 2026. Rebuilt on every refresh.
Live · the batteries and the system, right now
Reading the batteries.
Reading the last 24 hours.
Reading Fingrid’s count.
Reading the system.
Fingrid publishes the whole fleet’s charging and discharging power every three minutes, and its count of the batteries connected every hour; there is no reading per battery, because no unit list exists. Every panel is measured by Fingrid rather than modelled. The system, right now
Finland publishes no list of its batteries. Fingrid, the transmission system operator, counts the storage of a megawatt or more in its network model and publishes the total every hour, and it publishes every reserve market those batteries earn in, completely. The Energy Authority’s register of power plants holds no battery. So this page is three things read side by side: Fingrid’s count, the batteries their owners and builders have named in their own words, and what one megawatt is paid in the markets Fingrid runs.
Fingrid’s count rose 841 MW in 7 months, and four arrivals of 60 MW or more carry 554 MW of it
Fingrid adds a battery to its network model up to a month before it starts, so each step in this line is a battery, or a batch of them, arriving on the grid; it does not say which. The count opened at 1,215 MW on 11 March 2026, the first hour Fingrid published it, and stood at 2,057 MW on 16 October 2026. Between the big steps the line climbs in small ones, many of exactly 1.25 MW, which is the size of one container battery.
Fingrid, dataset 424, “Total installed battery energy storage system capacity”, hourly, read 16 October 2026, CC BY 4.0. Fingrid’s figure counts storage of a megawatt or more, including units expected to connect within about a month, with the distribution grid’s part depending on what the distribution companies document. 3 one-hour readings in which the feed fell to a fraction of the hour before and came straight back are left out as faults in the feed. The dated steps are on the change ledger.
The first reading of each month, as a table
| Month | MW, first reading |
|---|---|
| March 2026 | 1,215 |
| April 2026 | 1,269 |
| May 2026 | 1,284 |
| June 2026 | 1,427 |
| July 2026 | 1,614 |
| August 2026 | 1,614 |
| September 2026 | 1,848 |
| October 2026 | 2,013 |
The best hour by hour stack paid one megawatt €17,621 in October 2025 and €13,339 in September 2026
Finland’s batteries earn mostly by holding reserve for Fingrid: FCR-N, FCR-D, aFRR and mFRR, each bought in an hourly market whose price and volume Fingrid publishes. The bars are the most one megawatt could have been paid each month with perfect hindsight, choosing the best product every hour, before any cost; a real battery earns less. Over the twelve months to September 2026 that ceiling was €127,090 for the megawatt, of which FCR-N alone would have paid €79,655.
Calculated by Vitreous from Fingrid’s hourly reserve prices and volumes (CC BY 4.0), read 16 October 2026; a price counts only in an hour in which Fingrid bought something. The grey bar is a part month. Energy trading on the day-ahead and intraday markets is not in these figures, because Nord Pool’s prices may not be shown here. Every market, month by month, and how each figure is made.
The markets are filling up: 5.5 megawatts of batteries for every megawatt of upward fast reserve Fingrid bought in October 2026, from 4.0 in March 2026
Fingrid buys a roughly steady amount of upward fast reserve each hour, in FCR-N, FCR-D up and FFR together, while the batteries able to sell it keep arriving. The ratio of its installed battery total to the upward reserve it bought in the same hours is the plainest measure of how crowded the market is getting, and the line only goes one way.
Each month, the average of Fingrid’s installed battery total (dataset 424) divided by the average upward volume it bought in its hourly FCR-N, FCR-D up and FFR markets (datasets 316, 315 and 276) in the same hours. Fingrid, CC BY 4.0. The table of the ratio month by month is on the markets page.
Where the named batteries are
One circle per battery named by its owner, at the place its name carries or the centre of its municipality, sized by power. Yellow operates; blue is being built; pale blue is announced.
69 of 77 batteries placed, every one from GeoNames because no source gives coordinates; 8 have no municipality in any source and are not drawn. 393 MW operating, 1,434 MW being built, 1,654 MW announced.
Open the Atlas, every battery on the map Every battery, one page each What changed, read by read The system and the batteries, right nowEvery battery named as operating
As the owner, developer or builder states it in its own release; the date is the owner’s stated start. Kauhava is energised and commissioning, not yet in commercial operation, and is counted here with the operating batteries. Every figure’s source is on the battery’s page.
| Battery | Owner | Municipality | MW | MWh | Started |
|---|---|---|---|---|---|
| Yllikkälä Power Reserve Two | Neoen (100%) | Lappeenranta | 56 | 113 | 2025 H1 |
| Kauhava (Nala Renewables) Energised, commissioning | Nala Renewables | Kauhava | 50 | 100 | 2026 end |
| Nurmijärvi (Helen and Evli) | Helen Ltd and Evli Renewable Energy Infrastructure Fund II | Nurmijärvi | 40 | 80 | 2025-12 |
| Mertaniemi | Joint venture of Ardian Clean Energy Evergreen Fund and Lappeenrannan Energia | Lappeenranta | 38 | 43 | 2025-05-15 |
| Yllikkälä Power Reserve One | Neoen | Lappeenranta | 30 | 30 | 2020-10 |
| Lempäälä BESS (Taaleri Energia fund) | A fund managed by Taaleri Energia | Lempäälä | 30 | 36 | 2024-11-23 |
| Simo, phase 1 | Joint venture of FRV and AMP Tank Finland Oy | Simo | 30 | 60 | 2025-05 |
| Ainola BESS (Piiparinmäki wind farm) | Nuveen Infrastructure (majority), Ilmatar (10%) | Pyhäntä | 30 | 41 | 2025-06 |
| Valkeakoski (Alpiq) | Alpiq | Valkeakoski | 30 | 36 | 2025-10 |
| Olana Selkiö | Olana Energy Oy | Pieksämäki | 10 | 12 | 2025 Q2 |
| Olana Siilinjärvi | Olana Energy Oy | Siilinjärvi | 10 | 12 | 2025 Q2 |
| Olana Gunnarsnäs | Olana Energy Oy | Parainen | 10 | 10 | 2026 Q3 |
| Olana Koski Tl | Olana Energy Oy | Koski Tl | 7 | 8 | 2026 Q3 |
| Lakiakangas wind farm storage (Helen, jointly owned) | Helen (jointly owned; partner not named) | · | 5 | 10 | by 2024-02 |
| Rando Grid | Rando Grid Oy, owned by JTel Oy and Rando Ventures Oy | Kuhmoinen | 5 | 10 | 2025-01 |
| Olana Turku | Olana Energy Oy | Turku | 5 | 6 | 2025 Q1 |
| Callio-Hitura hybrid storage, former Pyhäsalmi mine | Callio-Hitura Solarpark Oy | Pyhäjärvi | 4 | 8 | 2026-05-01 |
| Batcave (Järvenpää power plant) | Fortum | Järvenpää | 2 | 1 | 2017-03-01 |
| Merus Power test storage, Lempäälä | Merus Power | Lempäälä | 1 | 1 | 2025-03-25 |
Being built
| Battery | Owner | Municipality | MW | MWh | Expected |
|---|---|---|---|---|---|
| Haapajärvi (Pysäysperä) | Alpiq | Haapajärvi | 125 | 250 | 2027 H1 |
| Tuisku | Luxcara | Keminmaa | 125 | · | 2027 summer |
| AKKU One | Covenergo (majority) with Delta Capacity | Lapinlahti | 125 | 300 | 2027 Q4 |
| Kärppiö / Karppio (Delta Capacity) | Delta Capacity and Strioga Family Foundation | Teuva | 125 | 300 | 2027 Q4 |
| Nala Vuolijoki | Nala Renewables | Kajaani | 125 | 250 | · |
| Kannisto wind farm BESS (OX2) | OX2 | Halsua | 125 | 250 | 2028 |
| Korkeamaa wind farm BESS (OX2) | OX2 | Soini | 110 | 220 | 2028 |
| Nivala (Ingrid Capacity and Locus Energy) | Ingrid Capacity and Locus Energy (SEB Nordic Energy portfolio company) | Nivala | 70 | 140 | 2026 |
| Simo, phase 2 | FRV with AMP Tank | Simo | 70 | 140 | 2026 |
| Akkula Big Battery | Neoen (100%) | Rauma | 62 | 231 | 2027 |
| Uusnivala BESS | L&G NTR Clean Power (Europe) III Fund (Uusnivala Energy Storage Oy) | Nivala | 55 | 110 | 2026 mid |
| Kotka (Aquila Clean Energy) | Aquila Clean Energy EMEA | Kotka | 50 | 50 | 2025 |
| Kalanti BESS | Renewable Power Capital (RPC) | Uusikaupunki | 50 | 100 | 2026 summer |
| Isokangas (Eco Stor) | Å Energi (majority), with Farvatn Capital and Eco-Stor AS; AMP Tank keeps a minority | · | 50 | 50 | 2026 |
| Laukaa (WOOD & Company) | WOOD & Company Renewables Sub-Fund | Laukaa | 45 | 90 | 2027 Q2 |
| Rautavaara (Winda Energy) | Winda Energy | Rautavaara | 30 | 60 | 2026 |
| Äänekoski (WOOD & Company) | WOOD & Company Renewables Sub-Fund | Äänekoski | 30 | 60 | 2027 Q2 |
| Ristimäki (Olana Energy) | Olana Energy Oy | Pieksämäki | 30 | 34 | 2026 Q4 |
| Toppila (Oulun Energia) | Oulun Energia | Oulu | 20 | · | 2026 |
| Teuva wind farm battery (EPV Energy) | EPV Energy | Teuva | 12 | 12 | 2023 spring |
| Lohja solar park storage (Helen) | Helen | Lohja | 0 | · | · |
The owners with the most operating
Who builds them
Merus Power is named on 12 of the 77 batteries; the list names a builder or integrator for 42 of them. Nobody names the cell maker: no source read says whose cells are in any Finnish battery.
| Builder or integrator named | Batteries | MW |
|---|---|---|
| Merus Power | 12 | 261 |
| Sungrow | 2 | 155 |
| Nidec | 3 | 149 |
| Nordic Electro Power | 1 | 125 |
| Delta Capacity | 1 | 125 |
| Despro | 1 | 125 |
| SMA Altenso | 1 | 95 |
| Hitachi ABB Power Grids | 1 | 90 |
What is not here, and why
Which batteries make up Fingrid’s count, because no Finnish body publishes a unit list; the 1,663 MW the named list does not reach is, by Fingrid’s own February split, mostly units under 2 MW. What each battery earns, because Fingrid publishes the markets and not the bidders, so the money on this site is for one megawatt and never for a named battery. The day-ahead price, because it is Nord Pool’s and Nord Pool declined permission to show it. Coordinates, because no owner publishes them, so every point on the map is a GeoNames place. The connection queue, because Fingrid publishes enquiries only as totals and a map of where new storage may apply. A connection figure is never passed off as a battery’s size.
Sources: Fingrid Oyj open data, data.fingrid.fi, datasets 424 (installed battery capacity), 316 and 317 (FCR-N), 318 and 315 (FCR-D up), 283 and 281 (FCR-D down), 52, 51, 1 and 2 (aFRR), 329, 330, 327 and 328 (mFRR), CC BY 4.0, read 16 October 2026. The named batteries from fi/hand/batteries.csv, kept by hand from owners’, developers’ and builders’ own releases, council decisions and permit bulletins, every fact with its web address, checked against the owners’ own words on 12 October 2026. Places from GeoNames, CC BY 4.0. Fingrid’s February 2026 split of its count by size from its release of 24 February 2026. Nothing on this page is modelled.