Vitreous LabsEnergy transparency
Finland · the batteries, Fingrid’s count and the markets they earn in

Finland has 2,057 MW of batteries connected, by Fingrid’s own count, and nobody publishes which they are. Their owners name 393 MW of them, and 1,434 MW more being built.

2,057 MWof batteries connected on 16 October 2026, by Fingrid’s own count; 1,215 MW on 11 March 2026, its first reading
393 MWin the 19 batteries their owners name as operating or commissioning, about 19% of Fingrid’s count; the rest is small units nobody announces
1,434 MWin 21 batteries their owners say are being built, and 1,654 MW more announced in 37
€127,090is the most one megawatt could have been paid in Fingrid’s reserve markets in the twelve months to September 2026, selling the best product each hour

Fingrid’s open data read 16 October 2026, twice a week. The owners’ releases read to 12 October 2026 and checked against their own words. Reserve prices to October 2026. Rebuilt on every refresh.

Live  ·  the batteries and the system, right now

Reading the batteries.

Reading the last 24 hours.

Reading Fingrid’s count.

Reading the system.

Fingrid publishes the whole fleet’s charging and discharging power every three minutes, and its count of the batteries connected every hour; there is no reading per battery, because no unit list exists. Every panel is measured by Fingrid rather than modelled. The system, right now

Finland publishes no list of its batteries. Fingrid, the transmission system operator, counts the storage of a megawatt or more in its network model and publishes the total every hour, and it publishes every reserve market those batteries earn in, completely. The Energy Authority’s register of power plants holds no battery. So this page is three things read side by side: Fingrid’s count, the batteries their owners and builders have named in their own words, and what one megawatt is paid in the markets Fingrid runs.

Open the Atlas   What a megawatt is paid

Fingrid’s count rose 841 MW in 7 months, and four arrivals of 60 MW or more carry 554 MW of it

Fingrid adds a battery to its network model up to a month before it starts, so each step in this line is a battery, or a batch of them, arriving on the grid; it does not say which. The count opened at 1,215 MW on 11 March 2026, the first hour Fingrid published it, and stood at 2,057 MW on 16 October 2026. Between the big steps the line climbs in small ones, many of exactly 1.25 MW, which is the size of one container battery.

05001,0001,5002,0002,500Mar 2026AprMayJunJulAugSepOct+66 MW18 May+121 MW1 Jun+234 MW28 Aug in two hours+132 MW3 Sep1,215 MW, 11 Mar 20262,057 MW16 Oct 2026

Fingrid, dataset 424, “Total installed battery energy storage system capacity”, hourly, read 16 October 2026, CC BY 4.0. Fingrid’s figure counts storage of a megawatt or more, including units expected to connect within about a month, with the distribution grid’s part depending on what the distribution companies document. 3 one-hour readings in which the feed fell to a fraction of the hour before and came straight back are left out as faults in the feed. The dated steps are on the change ledger.

The first reading of each month, as a table
MonthMW, first reading
March 20261,215
April 20261,269
May 20261,284
June 20261,427
July 20261,614
August 20261,614
September 20261,848
October 20262,013

The best hour by hour stack paid one megawatt €17,621 in October 2025 and €13,339 in September 2026

Finland’s batteries earn mostly by holding reserve for Fingrid: FCR-N, FCR-D, aFRR and mFRR, each bought in an hourly market whose price and volume Fingrid publishes. The bars are the most one megawatt could have been paid each month with perfect hindsight, choosing the best product every hour, before any cost; a real battery earns less. Over the twelve months to September 2026 that ceiling was €127,090 for the megawatt, of which FCR-N alone would have paid €79,655.

0€5,000€10,000€15,000€20,000Oct 2025€17,621NovDecJan 2026€7,557FebMarAprMayJunJulAugSep€13,339Oct€7,736part month

Calculated by Vitreous from Fingrid’s hourly reserve prices and volumes (CC BY 4.0), read 16 October 2026; a price counts only in an hour in which Fingrid bought something. The grey bar is a part month. Energy trading on the day-ahead and intraday markets is not in these figures, because Nord Pool’s prices may not be shown here. Every market, month by month, and how each figure is made.

The markets are filling up: 5.5 megawatts of batteries for every megawatt of upward fast reserve Fingrid bought in October 2026, from 4.0 in March 2026

Fingrid buys a roughly steady amount of upward fast reserve each hour, in FCR-N, FCR-D up and FFR together, while the batteries able to sell it keep arriving. The ratio of its installed battery total to the upward reserve it bought in the same hours is the plainest measure of how crowded the market is getting, and the line only goes one way.

05x10xMar 2026AprMayJunJulAugSepOct5.5x4.0x

Each month, the average of Fingrid’s installed battery total (dataset 424) divided by the average upward volume it bought in its hourly FCR-N, FCR-D up and FFR markets (datasets 316, 315 and 276) in the same hours. Fingrid, CC BY 4.0. The table of the ratio month by month is on the markets page.

Where the named batteries are

One circle per battery named by its owner, at the place its name carries or the centre of its municipality, sized by power. Yellow operates; blue is being built; pale blue is announced.

Haapajärvi (Pysäysperä), 125 MWTuisku, 125 MWAKKU One, 125 MWKärppiö / Karppio (Delta Capacity), 125 MWNala Vuolijoki, 125 MWKannisto wind farm BESS (OX2), 125 MWKukonkylä, 125 MWVisulahti (Neoen), 120 MWKorkeamaa wind farm BESS (OX2), 110 MWKärppiö (Nala Renewables), 100 MWTeuva (Prime Capital, from Usva Energia), 100 MWPyhäjoki (Enlight, from Usva Energia), 100 MWMehtäperä battery storage (FRV Nivala Oy), 100 MWAlapitkä battery park, 95 MWOlkiluoto backup battery (TVO), 90 MWPyhäsalmi BESS (SENS and Dovre), 85 MWNivala (Ingrid Capacity and Locus Energy), 70 MWSimo, phase 2, 70 MWAkkula Big Battery, 62 MWPälli battery storage (Fortum), 60 MWYllikkälä Power Reserve Two, 56 MWUusnivala BESS, 55 MWKauhava (Nala Renewables), 50 MWKotka (Aquila Clean Energy), 50 MWKalanti BESS, 50 MWJämsä (Winda Energy), 50 MWPahkakoski BESS, 50 MWLaukaa (WOOD & Company), 45 MWPedersöre (Ingrid Capacity), 45 MWNurmijärvi (Helen and Evli), 40 MWMertaniemi, 38 MWYllikkälä Power Reserve One, 30 MWLempäälä BESS (Taaleri Energia fund), 30 MWSimo, phase 1, 30 MWAinola BESS (Piiparinmäki wind farm), 30 MWValkeakoski (Alpiq), 30 MWRautavaara (Winda Energy), 30 MWÄänekoski (WOOD & Company), 30 MWRistimäki (Olana Energy), 30 MWKellarijanka (UB Renewable Energy Fund), 30 MWRiihimäki, Kaunola (Ardian), 30 MWKuortti (Exilion), 30 MWRovaniemi (Neve), 30 MWSöderskogen wind farm BESS (wpd), 30 MWRelletinsuo battery storage and substation, 30 MWAlvar BESS, 25 MWVästervik–Riskula BESS, 25 MWToppila (Oulun Energia), 20 MWMäntsälä (MW Storage), 20 MWVarevaara wind farm BESS (Exilion), 20 MWTeuva wind farm battery (EPV Energy), 12 MWYpyrinneva BESS, 12 MWOlana Selkiö, 10 MWOlana Siilinjärvi, 10 MWOlana Gunnarsnäs, 10 MWForssa (Enertia), 10 MWPerkiönmäen Energiavarasto, 10 MWOlana Koski Tl, 7 MWRando Grid, 5 MWOlana Turku, 5 MWJuankoski (Savon Voima), 5 MWKouvola (Usva Energia), 5 MWCallio-Hitura hybrid storage, former Pyhäsalmi mine, 4 MWBatcave (Järvenpää power plant), 2 MWPaarmasuontie energy storage, Raahe, 2 MWNW JBox container battery, Raahe (Kivipelto, Romuperäntie), 1 MWNW JBox container battery, Raahe (Järvelä I, Mutalantie 97), 1 MWMerus Power test storage, Lempäälä, 1 MWLohja solar park storage (Helen), 0 MW
Battery, operatingBattery, being builtBattery, announcedBattery, status not stated

69 of 77 batteries placed, every one from GeoNames because no source gives coordinates; 8 have no municipality in any source and are not drawn. 393 MW operating, 1,434 MW being built, 1,654 MW announced.

Open the Atlas, every battery on the map Every battery, one page each What changed, read by read The system and the batteries, right now

Every battery named as operating

As the owner, developer or builder states it in its own release; the date is the owner’s stated start. Kauhava is energised and commissioning, not yet in commercial operation, and is counted here with the operating batteries. Every figure’s source is on the battery’s page.

BatteryOwnerMunicipalityMWMWhStarted
Yllikkälä Power Reserve TwoNeoen (100%)Lappeenranta561132025 H1
Kauhava (Nala Renewables)
Energised, commissioning
Nala RenewablesKauhava501002026 end
Nurmijärvi (Helen and Evli)Helen Ltd and Evli Renewable Energy Infrastructure Fund IINurmijärvi40802025-12
MertaniemiJoint venture of Ardian Clean Energy Evergreen Fund and Lappeenrannan EnergiaLappeenranta38432025-05-15
Yllikkälä Power Reserve OneNeoenLappeenranta30302020-10
Lempäälä BESS (Taaleri Energia fund)A fund managed by Taaleri EnergiaLempäälä30362024-11-23
Simo, phase 1Joint venture of FRV and AMP Tank Finland OySimo30602025-05
Ainola BESS (Piiparinmäki wind farm)Nuveen Infrastructure (majority), Ilmatar (10%)Pyhäntä30412025-06
Valkeakoski (Alpiq)AlpiqValkeakoski30362025-10
Olana SelkiöOlana Energy OyPieksämäki10122025 Q2
Olana SiilinjärviOlana Energy OySiilinjärvi10122025 Q2
Olana GunnarsnäsOlana Energy OyParainen10102026 Q3
Olana Koski TlOlana Energy OyKoski Tl782026 Q3
Lakiakangas wind farm storage (Helen, jointly owned)Helen (jointly owned; partner not named)·510by 2024-02
Rando GridRando Grid Oy, owned by JTel Oy and Rando Ventures OyKuhmoinen5102025-01
Olana TurkuOlana Energy OyTurku562025 Q1
Callio-Hitura hybrid storage, former Pyhäsalmi mineCallio-Hitura Solarpark OyPyhäjärvi482026-05-01
Batcave (Järvenpää power plant)FortumJärvenpää212017-03-01
Merus Power test storage, LempääläMerus PowerLempäälä112025-03-25

Being built

BatteryOwnerMunicipalityMWMWhExpected
Haapajärvi (Pysäysperä)AlpiqHaapajärvi1252502027 H1
TuiskuLuxcaraKeminmaa125·2027 summer
AKKU OneCovenergo (majority) with Delta CapacityLapinlahti1253002027 Q4
Kärppiö / Karppio (Delta Capacity)Delta Capacity and Strioga Family FoundationTeuva1253002027 Q4
Nala VuolijokiNala RenewablesKajaani125250·
Kannisto wind farm BESS (OX2)OX2Halsua1252502028
Korkeamaa wind farm BESS (OX2)OX2Soini1102202028
Nivala (Ingrid Capacity and Locus Energy)Ingrid Capacity and Locus Energy (SEB Nordic Energy portfolio company)Nivala701402026
Simo, phase 2FRV with AMP TankSimo701402026
Akkula Big BatteryNeoen (100%)Rauma622312027
Uusnivala BESSL&G NTR Clean Power (Europe) III Fund (Uusnivala Energy Storage Oy)Nivala551102026 mid
Kotka (Aquila Clean Energy)Aquila Clean Energy EMEAKotka50502025
Kalanti BESSRenewable Power Capital (RPC)Uusikaupunki501002026 summer
Isokangas (Eco Stor)Å Energi (majority), with Farvatn Capital and Eco-Stor AS; AMP Tank keeps a minority·50502026
Laukaa (WOOD & Company)WOOD & Company Renewables Sub-FundLaukaa45902027 Q2
Rautavaara (Winda Energy)Winda EnergyRautavaara30602026
Äänekoski (WOOD & Company)WOOD & Company Renewables Sub-FundÄänekoski30602027 Q2
Ristimäki (Olana Energy)Olana Energy OyPieksämäki30342026 Q4
Toppila (Oulun Energia)Oulun EnergiaOulu20·2026
Teuva wind farm battery (EPV Energy)EPV EnergyTeuva12122023 spring
Lohja solar park storage (Helen)HelenLohja0··

The owners with the most operating

Who builds them

Merus Power is named on 12 of the 77 batteries; the list names a builder or integrator for 42 of them. Nobody names the cell maker: no source read says whose cells are in any Finnish battery.

Builder or integrator namedBatteriesMW
Merus Power12261
Sungrow2155
Nidec3149
Nordic Electro Power1125
Delta Capacity1125
Despro1125
SMA Altenso195
Hitachi ABB Power Grids190

What is not here, and why

Which batteries make up Fingrid’s count, because no Finnish body publishes a unit list; the 1,663 MW the named list does not reach is, by Fingrid’s own February split, mostly units under 2 MW. What each battery earns, because Fingrid publishes the markets and not the bidders, so the money on this site is for one megawatt and never for a named battery. The day-ahead price, because it is Nord Pool’s and Nord Pool declined permission to show it. Coordinates, because no owner publishes them, so every point on the map is a GeoNames place. The connection queue, because Fingrid publishes enquiries only as totals and a map of where new storage may apply. A connection figure is never passed off as a battery’s size.

Sources: Fingrid Oyj open data, data.fingrid.fi, datasets 424 (installed battery capacity), 316 and 317 (FCR-N), 318 and 315 (FCR-D up), 283 and 281 (FCR-D down), 52, 51, 1 and 2 (aFRR), 329, 330, 327 and 328 (mFRR), CC BY 4.0, read 16 October 2026. The named batteries from fi/hand/batteries.csv, kept by hand from owners’, developers’ and builders’ own releases, council decisions and permit bulletins, every fact with its web address, checked against the owners’ own words on 12 October 2026. Places from GeoNames, CC BY 4.0. Fingrid’s February 2026 split of its count by size from its release of 24 February 2026. Nothing on this page is modelled.