Nurmijärvi (Helen and Evli)

Operating, 40 MW · 80 MWh, in Nurmijärvi, owned by Helen Ltd and Evli Renewable Energy Infrastructure Fund II. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power40 MW
Capacity80 MWh
Duration2.0 hours
StatusOperating, as of 2 December 2025
Owner’s dateDecember 2025, actual
MunicipalityNurmijärvi
Grid connectionNational grid near Fingrid transmission network
Placed on the mapat the centre of Nurmijärvi, its municipality (GeoNames)

Who is behind it

OwnerHelen Ltd and Evli Renewable Energy Infrastructure Fund II
DeveloperEvli (with Siemens)
Built bySiemens (technology supplier: electrification, energy management software, lifecycle services); 36 container modules, maker not named

A joint venture. Helen Oy is 2630573-4. YTJ lists Nurmijärven Sähkövarasto Oy (3333212-4) by name only; no source ties it to this battery.

Not published anywhere we have found: ultimate owner, cells. The page says so rather than guessing.

What the sources say

Helen says "over 40 MW" and "exceeding 80 MWh"; the figures here are those floors.

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B015.