Since 10 October 2026: 75 batteries entered, 857 MW, 8 left, 218 other changes.
The Bundesnetzagentur publishes the whole Marktstammdatenregister as a daily export. It is read once a week for the storage units of a megawatt or more, every export is kept, and the difference printed, unit by unit. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.
By month
| Month | Entered | MW entered | Left | Other changes | Respelt or refiled |
|---|---|---|---|---|---|
| November 2026 | 71 | 822 | 7 | 204 | 2 |
| October 2026 | 4 | 35 | 1 | 14 | · |
Where this can be wrong
The register is filled in by operators and checked by grid operators, so an entry can change because an operator corrected it, because the grid operator did, or because the plant changed; the register does not say which, and the "grid operator check" column is the nearest thing to a signal. A unit that falls below a megawatt leaves this ledger without leaving the register. The first export is a baseline, not a report.
The Marktstammdatenregister, batteries of a megawatt and up
A unit enters when it is registered at a megawatt or more and leaves when it is deleted from the register or falls below a megawatt; the register is read daily, and a planned unit becoming an operating one shows as a change of status. 3 captures held, 10 October 2026 to 24 November 2026.
24 November 2026, against 15 October 2026
284 changes, 2 of them the publisher respelling or refiling something.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| ECO POWER THREE C SEE928453677290 | entered | · | · | 100 | new to this list |
| ECO POWER THREE B SEE932200559470 | entered | · | · | 100 | new to this list |
| ROE II SEE919327282153 | entered | · | · | 55 | new to this list |
| ROE I SEE998384244380 | entered | · | · | 55 | new to this list |
| green flexibility BESS Obergünzburg gmbh SEE909980876691 | entered | · | · | 40 | new to this list |
| Attic-Speicher SEE994964655898 | entered | · | · | 25 | new to this list |
| GMH BESS Dillfeld I SEE982953486851 | entered | · | · | 23 | new to this list |
| BESS WWS Invest 3 GmbH & Co. KG SEE945262782694 | entered | · | · | 22 | new to this list |
| SpeicherWerk Münsterland - BESS Borken SEE901301865483 | entered | · | · | 22 | new to this list |
| SpeicherWerk Münsterland - BESS Coesfeld SEE985364294466 | entered | · | · | 22 | new to this list |
| Ems SEE968860612095 | entered | · | · | 21 | new to this list |
| trlyr23 Westerstede BESS SEE997145078134 | entered | · | · | 20 | new to this list |
| BESS-Breitenbich SEE943426085704 | entered | · | · | 18 | new to this list |
| S4 Energy Burhafe SEE905976745989 | entered | · | · | 17 | new to this list |
| Batterie Hansapark SEE990187259363 | entered | · | · | 16 | new to this list |
| trlyr 17 SEE900913716572 | entered | · | · | 15 | new to this list |
| Großbatteriespeicher Alfeld SEE918385807070 | net power, MW | 99.3 | 137.5 | 138 | up by 38.2 |
| ECO POWER THREE A SEE901024459440 | net power, MW | 300.0 | 100.0 | 100 | down by 200 |
| ECO POWER THREE A SEE901024459440 | name | ECO POWER THREE | ECO POWER THREE A | 100 | changed |
| ECO POWER THREE A SEE901024459440 | planned date | 2027-02-01 | 2027-02-19 | 100 | changed |
| Kyon-42 Battery Storage SEE954807594395 | planned date | 2026-10-31 | 2027-01-18 | 58 | changed |
| Kyon-38 Battery Storage West SEE989748439733 | planned date | 2026-10-31 | 2026-12-14 | 51 | changed |
| Kyon-38 Battery Storage Ost SEE914862084439 | planned date | 2026-10-31 | 2026-12-14 | 49 | changed |
| SGE Duisburg-Walsum SEE940654841652 | planned date | 2026-10-31 | 2026-11-30 | 47 | changed |
| BESS Manheimer Bucht 1 SEE968876748832 | status | In Planung | In Betrieb | 40 | changed |
| BESS Manheimer Bucht 1 SEE968876748832 | planned date | 2026-10-01 | · | 40 | changed |
| BESS Manheimer Bucht 1 SEE968876748832 | commissioning date | · | 2026-10-21 | 40 | changed |
| BESS Kölsa Batteriespeicher SEE999375739335 | planned date | 2026-10-31 | 2027-01-29 | 40 | changed |
| BESS Schlön SEE930343596277 | planned date | 2026-10-01 | 2026-12-01 | 36 | changed |
| Großbatteriespeicher SEE935898651709 | operator | Hermann Braig Entsorgungsfachbetrieb | Hermann Braig Papierrohstoffe e.K. | 30 | changed |
| Batteriespeicher JT Energy Systems GmbH SEE905820921729 | net power, MW | 25.0 | 29.7 | 30 | up by 4.7 |
| Döbrichau BESS SEE932375452705 | net power, MW | 45.0 | 28.0 | 28 | down by 17 |
| Döbrichau BESS SEE932375452705 | planned date | 2026-12-22 | 2026-11-11 | 28 | changed |
| BESS Neubrandenburg SEE983429560709 | planned date | 2026-10-05 | 2026-12-31 | 26 | changed |
| Großbatteriespeicher Irsingen SEE958262376688 | operator | Hermann Braig Entsorgungsfachbetrieb | Hermann Braig Papierrohstoffe e.K. | 25 | changed |
| Kyon-26 Battery Storage SEE908517074623 | planned date | 2026-10-08 | 2026-11-16 | 24 | changed |
| Großbatteriespeicher Irsingen SEE941340244788 | operator | Hermann Braig Entsorgungsfachbetrieb | Hermann Braig Papierrohstoffe e.K. | 20 | changed |
| Großbatteriespeicher Schwenningen SEE962311804787 | operator | Hermann Braig Entsorgungsfachbetrieb | Hermann Braig Papierrohstoffe e.K. | 20 | changed |
| Batteriespeicher Knetzgau SEE974972238993 | planned date | 2026-08-03 | 2026-11-13 | 20 | changed |
| PV-Batteriespeicher Overath 1 SEE974247615207 | operator | enlop GmbH | a natural person | 20 | changed |
| TEP Vesta GmbH & Co KG (Speicher) SEE935322911287 | status | In Planung | In Betrieb | 19 | changed |
| TEP Vesta GmbH & Co KG (Speicher) SEE935322911287 | net power, MW | 22.6 | 19.2 | 19 | down by 3.4 |
| TEP Vesta GmbH & Co KG (Speicher) SEE935322911287 | planned date | 2026-09-18 | · | 19 | changed |
| TEP Vesta GmbH & Co KG (Speicher) SEE935322911287 | commissioning date | · | 2026-10-05 | 19 | changed |
| BESS Immenstadt SEE953815288937 | grid operator check | under check | checked | 16 | changed |
| BESS UW Heessen SEE978423585698 | status | In Planung | In Betrieb | 16 | changed |
| BESS UW Heessen SEE978423585698 | planned date | 2026-10-23 | · | 16 | changed |
| BESS UW Heessen SEE978423585698 | commissioning date | · | 2026-10-23 | 16 | changed |
| BESS Leer Nord SEE902226350702 | operator | SWO Energie Leer Nord GmbH | Voltuna Leer Nord GmbH | 15 | changed |
| BESS Leer Nord SEE902226350702 | grid operator check | under check | checked | 15 | changed |
The 50 largest changes are shown. The other 234, each of 15 MW or less, are in the CSV: 55 entered, 7 left, 172 other changes.
15 October 2026, against 10 October 2026
19 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| UW_Visbek SEE943914294755 | entered | · | · | 15 | new to this list |
| green flexibility BESS Ettringen gmbh SEE959904987606 | entered | · | · | 10 | new to this list |
| ACDC ZW8 SEE926242887332 | entered | · | · | 5 | new to this list |
| BESS UW Vierlinden SEE966521903452 | entered | · | · | 5 | new to this list |
| Speicher Kühbach IV - P24-064 SEE997803743657 | left | · | · | 3.4 | gone from this list |
| BESS Strübbel SEE963514247548 | grid operator check | under check | checked | 50 | changed |
| BESS UW Heessen SEE978423585698 | planned date | 2026-09-30 | 2026-10-23 | 16 | changed |
| Pfaffenklinge Speicher SEE912580321386 | grid operator check | checked | under check | 8.8 | changed |
| Speicher Beilrode I - Teilanlage 5 SEE939346315557 | net power, MW | 6.2 | 5.6 | 5.6 | down by 0.6 |
| Batteriespeicher-Buch SEE917146636904 | grid operator check | under check | checked | 5 | changed |
| Batteriespeicher SEE933255558609 | planned date | 2026-09-17 | 2026-11-05 | 4.8 | changed |
| MM9 - Speicher - Parey SEE919126258380 | grid operator check | under check | checked | 3.5 | changed |
| Theilheim Speicher BA III Ino SEE950334441102 | net power, MW | 3.0 | 3.1 | 3.1 | up by 0.1 |
| Theilheim Speicher BA III Ino SEE950334441102 | planned date | 2025-08-18 | 2026-10-19 | 3.1 | changed |
| BESS Sinzing SEE921014163461 | net power, MW | 3.4 | 3.0 | 3 | down by 0.4 |
| BESS Sinzing SEE921014163461 | grid operator check | under check | checked | 3 | changed |
| Batteriespeicher 2 SEE942088999749 | planned date | 2026-09-01 | 2026-12-30 | 2 | changed |
| Speicher Riesa Trst. Fertigung BA 4 SEE988302497264 | planned date | 2026-10-31 | 2026-11-27 | 1.1 | changed |
| Batteriespeicher I-Kubus Quedlinburg SEE911894016032 | grid operator check | under check | checked | 1 | changed |