Vitreous LabsEnergy transparency
Lithuania · Litgrid’s connection lists, read every day

Lithuania’s transmission grid has 949 MW of batteries connected and 2,770 MW more with a signed protocol. A further 3,483 MW holds conditions that last six months.

949 MWin 18 batteries connected to the transmission grid, on Litgrid’s list of connected plant
2,770 MWin 37 batteries with a signed intent protocol, the step at which Litgrid counts the capacity as reserved
3,483 MWin 36 batteries holding preliminary conditions and no protocol yet; each set lasts six months
535 MWof those conditions, in 6 sets, ends within 30 days of 24 November 2026

Standalone battery storage on the transmission grid. Litgrid’s public connection map read 24 November 2026, every day. Rebuilt on every refresh.

Litgrid, Lithuania’s transmission operator, publishes three lists on its connection map, and a project stands in one of them at a time. Preliminary conditions are Litgrid’s first answer to a developer: where a plant could connect and how large it could be, valid for six months. An intent protocol is signed after that, and Litgrid then counts the capacity as reserved. The third list is plant already connected. This page reads all three every day and counts each battery once.

Every project on the three lists

Where the batteries are

One circle per standalone battery, sized by power, at the point Litgrid’s map gives it. Yellow is connected; blue has a signed protocol; pale blue holds conditions only. The thin lines are Litgrid’s own 330 and 400 kV lines.

UAB "Saulėtas Pasaulis", 500 MWMolsera, UAB, 200 MWUAB "Unlimited power 4", 200 MWUAB "Amplion Lithuania", 200 MWUAB "Amplion Lithuania", 200 MWUAB "Taveda", 200 MWUAB "Navitas Storage", 200 MWŠyšos TP, 150 MWLitrinka, UAB, 150 MWUAB "Ignitis renewables projektai 8", 150 MWUAB "Jursola", 150 MWUAB "LitVerslas", 150 MWUAB "PV Energy 200", 150 MWUAB "Sanilita", 150 MWBT du, UAB, 140 MWUAB "BRE Energy", 140 MWUAB "FRR Energy", 140 MWUAB "Unlimited offshore solutions", 140 MWAvurena, UAB, 120 MWEnlita, UAB, 120 MWUAB "Extento futurus", 120 MWMB "Reei", 100 MWUAB "Solar Akmenė One", 100 MWUAB "Rar energija 2", 100 MWUAB "Reei", 100 MWUAB "Energy Trade", 100 MWUAB "Ecotix", 100 MWUAB "Energetikos plėtra", 100 MWUAB "Inoxis", 100 MWUAB" Premium Navitas", 100 MWSpv bess, UAB, 100 MWPanevėžio TP, 80 MWUAB "Ignitis gamyba projektai", 80 MWPanevėžio TP, 70 MWPrimum navitas, UAB, 70 MWUAB "Aura Power Electra", 70 MWTausalo TP, 60 MWŠventininkų TP, 60 MWCalypso Invest, UAB, 60 MWPaktransa, UAB, 60 MWUAB "ESVB-5", 60 MWUAB Tilžės Turgus, 59 MWUAB "Future energy", 56 MWAlytus, 50 MWLijono TP, Kaišiadorys-Žasliai, 50 MWUtena, 50 MWVilnius, 50 MWŠiauliai, 50 MWA8, UAB, 50 MWBaltic BESS, UAB, 50 MWBaltic grid balance, MB, 50 MWPietvis, UAB, 50 MWUAB "Kaunas BESS", 50 MWUAB "Rar energija 1", 50 MWMB "Reei", 50 MWUAB "SPV ES1", 50 MWUAB "Trivis", 49 MWBaltakis Capital, UAB, 48 MWUAB "DC energija", 48 MWUAB "ESVB-4", 46 MWJuodupės TP, 45 MWUAB "AC Energija", 44 MWTaurų TP, 43 MWNaujažerio TP, Kaišiadorys-Žasliai, 41 MWDotenėnų TP, Pabradė-Švenčionėliai, 40 MWZarasai unlimited sun, UAB, 40 MWUAB "Venstata", 40 MWUAB "Bitėnai BESS 2", 40 MWUAB "Ignitis renewables projektai", 38 MWPure energy solutions, UAB, 35 MWMedinos TP, 30 MWTelšiai-Tarvainių trauka, 30 MWŠašaičių TP, Atš. Eigirdžiai, 30 MWBotlida, UAB, 30 MWUAB "Jonava hybrid", 30 MWUAB "Skuodas wind", 30 MWUAB "Arvilsa", 26 MWPP Wind Energy, UAB, 25 MWUAB "Kauno termofikacijos elektrinė", 25 MWUAB "Agroprime", 25 MWUAB "Energijos balansavimo operatorius", 24 MWVEVP, UAB, 24 MWArvilsa, UAB, 23 MWUAB "Lexiro", 21 MWPadvarnių TP, Suginčiai-Molėtai, 20 MWUAB "Unlimited power 9", 20 MWUAB "Unlimited power 9", 20 MWUAB "Taujanta", 20 MWUAB "Ecotix", 17 MWPanevėžio energija, AB, 15 MWPanevėžio energija, AB, 15 MWLATVIABELARUSPOLANDRUSSIAVilniusKaunasKlaipėdaŠiauliaiPanevėžys
Connected to the transmission gridIntent protocol signedPreliminary conditions, six monthsTransmission lines, 330 kV and up, Litgrid

91 batteries placed, all at Litgrid’s own map points. 949 MW connected, 2,770 MW with a protocol, 3,483 MW with conditions only. Land from Natural Earth.

Every project, with its holder, size, place and dates

Three times as much battery power is signed for as is connected

Each bar is one of Litgrid’s lists, for standalone batteries only. The megawatts are Litgrid’s “permitted generation”, the most a battery may send to the grid. Litgrid gives no megawatt hours, so nothing here says how long a battery can run.

Connected to the transmission grid18 batteries949 MWIntent protocol signed, capacity reserved37 batteries2,770 MWPreliminary conditions, no protocol yet36 batteries3,483 MW

Added up by Vitreous from Litgrid’s lists of 24 November 2026. Not drawn: 200 MW in one sets of conditions that already have a signed protocol. Litgrid leaves the old row on its list, so those batteries are counted once, with the protocols.

535 MW of conditions, in six sets, ends within 30 days

A set of preliminary conditions lasts six months from the day Litgrid issues it. By that day the developer has either signed an intent protocol or the conditions lapse. Each circle is one set of conditions with no protocol yet, drawn at the day it ends and sized by megawatts. The red ones end within 30 days of 24 November 2026.

Nov 2026DecJan 2027FebMarAprMayToday, 24 NovUAB "Unlimited power 4", 200 MW, ends 20 January 2027UAB "Amplion Lithuania", 200 MW, ends 17 February 2027UAB "Amplion Lithuania", 200 MW, ends 18 February 2027UAB "Taveda", 200 MW, ends 3 March 2027UAB "Navitas Storage", 200 MW, ends 19 May 2027UAB "Jursola", 150 MW, ends 3 March 2027UAB "LitVerslas", 150 MW, ends 3 March 2027UAB "PV Energy 200", 150 MW, ends 9 March 2027UAB "Sanilita", 150 MW, ends 17 March 2027UAB "BRE Energy", 140 MW, ends 26 November 2026UAB "FRR Energy", 140 MW, ends 27 November 2026UAB "Unlimited offshore solutions", 140 MW, ends 28 February 2027UAB "Extento futurus", 120 MW, ends 20 April 2027MB "Reei", 100 MW, ends 27 November 2026UAB "Solar Akmenė One", 100 MW, ends 27 November 2026UAB "Rar energija 2", 100 MW, ends 28 February 2027UAB "Reei", 100 MW, ends 3 March 2027UAB "Energy Trade", 100 MW, ends 17 May 2027UAB "Ecotix", 100 MW, ends 18 May 2027UAB "Energetikos plėtra", 100 MW, ends 18 May 2027UAB "Inoxis", 100 MW, ends 18 May 2027UAB" Premium Navitas", 100 MW, ends 18 May 2027UAB "Rar energija 1", 50 MW, ends 28 February 2027MB "Reei", 50 MW, ends 3 May 2027UAB "SPV ES1", 50 MW, ends 6 May 2027UAB "Trivis", 49 MW, ends 3 March 2027UAB "Venstata", 40 MW, ends 25 November 2026UAB "Bitėnai BESS 2", 40 MW, ends 12 April 2027UAB "Arvilsa", 26 MW, ends 3 March 2027UAB "Agroprime", 25 MW, ends 3 March 2027UAB "Lexiro", 21 MW, ends 3 March 2027UAB "Unlimited power 9", 20 MW, ends 3 March 2027UAB "Unlimited power 9", 20 MW, ends 28 April 2027UAB "Taujanta", 20 MW, ends 4 May 2027UAB "Ecotix", 17 MW, ends 3 March 2027Panevėžio energija, AB, 15 MW, ends 1 December 2026535 MW in six setsends within 30 daysThe other 30 sets, 2,948 MW, end between January and May 2027
HolderMWConnection pointIssuedEnds
UAB "Venstata"40Bitėnų TP25 May 202625 Nov 2026
UAB "BRE Energy"140Alytaus TP26 May 202626 Nov 2026
UAB "FRR Energy"140Alytaus TP27 May 202627 Nov 2026
MB "Reei"100Mūšos TP27 May 202627 Nov 2026
UAB "Solar Akmenė One"100Kruopių TP27 May 202627 Nov 2026
Panevėžio energija, AB15Panevėžio E TP1 Jun 20261 Dec 2026
What entered and left Litgrid’s lists, day by day

Issue and end dates as Litgrid lists them. This site keeps a copy of the lists every day from 14 November 2026, so each set that ends will show here as signed or as gone.

Who holds the queue

UAB "Saulėtas Pasaulis" holds the most, 500 MW. The table adds each company’s signed protocols to its open conditions, and treats two spellings of one name as one company.

Holder, as Litgrid writes itProtocol signed, MWConditions only, MWTogether, MW
UAB "Saulėtas Pasaulis"500·500
UAB "Amplion Lithuania"·400400
MB "Reei"·250250
Molsera, UAB200·200
UAB "Unlimited power 4"·200200
UAB "Taveda"·200200
UAB "Navitas Storage"·200200
Litrinka, UAB150·150
UAB "Ignitis renewables projektai 8"150·150
UAB "Jursola"·150150
UAB "LitVerslas"·150150
UAB "PV Energy 200"·150150

The 66 holders of a protocol or of open conditions for standalone storage; the twelve largest are shown. Litgrid names the company that holds the paper, which is often a project company, so a group with several companies appears on several lines. Every project.

The 18 batteries already connected

Litgrid’s list of connected plant gives the connection point and the size, and names no owner.

Connection pointMWkV
Šyšos TP150330
Panevėžio TP80110
Panevėžio TP70110
Tausalo TP60110
Šventininkų TP60110
Alytus50110
Lijono TP, Kaišiadorys-Žasliai50110
Utena50110
Vilnius50110
Šiauliai50110
Juodupės TP45110
Taurų TP43110
Naujažerio TP, Kaišiadorys-Žasliai41110
Dotenėnų TP, Pabradė-Švenčionėliai40110
Medinos TP30110
Telšiai-Tarvainių trauka30110
Šašaičių TP, Atš. Eigirdžiai30110
Padvarnių TP, Suginčiai-Molėtai20110

Batteries beside wind and solar

Litgrid lists plants that pair a battery with wind or solar as their own types, and the megawatts it gives are for the whole plant. The battery’s share is known only where Litgrid’s note states it.

StagePlantsWhole plant, MWBattery stated, MWPlants with no battery figure
Connected4250109·
Intent protocol signed444,3501,396·
Preliminary conditions121,3534443

Where Litgrid shows room for storage in 2026

Litgrid groups its lines and substations into zones and gives, for each zone and each year to 2035, how much storage could still connect. Litgrid’s own notes set four limits on reading it. The figures are preliminary and every request is assessed on its own. A zone’s figure can be used at one or several of its lines and substations. The figure describes sending power to the grid, and charging may be allowed less. And reserving capacity in one zone can cut what is left in its neighbours, so the zones cannot be added up.

ZoneSubstations in it, or its lines where it has noneFree for storage, MWReserved for storage, MWZone ceiling, MW
95Darbėnai1,3001001,400
72330 kV lines: Kruonio HAE-Kaunas (LN 328), Kruonio HAE-Kaunas (LN 329)740·1,480
101Kaunas740·1,480
107Lietuvos E740·1,480
74330 kV lines: Lietuvos Elektrinė-Neris (LN 331), Lietuvos Elektrinė-Vilnius (LN 332), Lietuvos Elektrinė-Vilnius (LN 533) and 1 more620·1,240
103Neris620·1,240
67330 kV lines: Darbėnai-Bitėnai (LN-535), Darbėnai-Klaipėda (LN 536), Grobinė-Darbėnai (LN 324)620·620
105Alytus4201401,480
106Kruonio HAE400·1,480
98Bitėnai400·1,200
94Mūša400220620
96330 kV lines: Viskali-Mūša (LN 305)400·620

The twelve zones with the most room for storage, of 107; 36 zones show none. Zone numbers and substations as on Litgrid’s map, read 24 November 2026. Every zone and every year as a CSV.

What is not here, and why

Batteries on the distribution grid, because Litgrid’s map covers the transmission grid only and the distribution operator, ESO, is not yet read. How long each battery can run, because Litgrid lists megawatts and no megawatt hours. Who owns the connected batteries, because that list names none. What a battery earns, the system right now and prices, which are not built for Lithuania yet. And any history before 14 November 2026, because Litgrid overwrites its map and keeps no earlier copies.

Sources: Litgrid’s public connection map, read every day through the map’s own data service and kept as read. The megawatts, holders, dates and map points are Litgrid’s. Worked out by Vitreous and marked so in the register: the nearest substation to a map point, and the match between a set of conditions and the protocol that followed it. Litgrid’s own summary table on the map does not agree with its lists and is not used.