Lithuania’s transmission grid has 949 MW of batteries connected and 2,770 MW more with a signed protocol. A further 3,483 MW holds conditions that last six months.
Standalone battery storage on the transmission grid. Litgrid’s public connection map read 24 November 2026, every day. Rebuilt on every refresh.
Litgrid, Lithuania’s transmission operator, publishes three lists on its connection map, and a project stands in one of them at a time. Preliminary conditions are Litgrid’s first answer to a developer: where a plant could connect and how large it could be, valid for six months. An intent protocol is signed after that, and Litgrid then counts the capacity as reserved. The third list is plant already connected. This page reads all three every day and counts each battery once.
Where the batteries are
One circle per standalone battery, sized by power, at the point Litgrid’s map gives it. Yellow is connected; blue has a signed protocol; pale blue holds conditions only. The thin lines are Litgrid’s own 330 and 400 kV lines.
91 batteries placed, all at Litgrid’s own map points. 949 MW connected, 2,770 MW with a protocol, 3,483 MW with conditions only. Land from Natural Earth.
Every project, with its holder, size, place and datesThree times as much battery power is signed for as is connected
Each bar is one of Litgrid’s lists, for standalone batteries only. The megawatts are Litgrid’s “permitted generation”, the most a battery may send to the grid. Litgrid gives no megawatt hours, so nothing here says how long a battery can run.
Added up by Vitreous from Litgrid’s lists of 24 November 2026. Not drawn: 200 MW in one sets of conditions that already have a signed protocol. Litgrid leaves the old row on its list, so those batteries are counted once, with the protocols.
535 MW of conditions, in six sets, ends within 30 days
A set of preliminary conditions lasts six months from the day Litgrid issues it. By that day the developer has either signed an intent protocol or the conditions lapse. Each circle is one set of conditions with no protocol yet, drawn at the day it ends and sized by megawatts. The red ones end within 30 days of 24 November 2026.
| Holder | MW | Connection point | Issued | Ends |
|---|---|---|---|---|
| UAB "Venstata" | 40 | Bitėnų TP | 25 May 2026 | 25 Nov 2026 |
| UAB "BRE Energy" | 140 | Alytaus TP | 26 May 2026 | 26 Nov 2026 |
| UAB "FRR Energy" | 140 | Alytaus TP | 27 May 2026 | 27 Nov 2026 |
| MB "Reei" | 100 | Mūšos TP | 27 May 2026 | 27 Nov 2026 |
| UAB "Solar Akmenė One" | 100 | Kruopių TP | 27 May 2026 | 27 Nov 2026 |
| Panevėžio energija, AB | 15 | Panevėžio E TP | 1 Jun 2026 | 1 Dec 2026 |
Issue and end dates as Litgrid lists them. This site keeps a copy of the lists every day from 14 November 2026, so each set that ends will show here as signed or as gone.
Who holds the queue
UAB "Saulėtas Pasaulis" holds the most, 500 MW. The table adds each company’s signed protocols to its open conditions, and treats two spellings of one name as one company.
| Holder, as Litgrid writes it | Protocol signed, MW | Conditions only, MW | Together, MW |
|---|---|---|---|
| UAB "Saulėtas Pasaulis" | 500 | · | 500 |
| UAB "Amplion Lithuania" | · | 400 | 400 |
| MB "Reei" | · | 250 | 250 |
| Molsera, UAB | 200 | · | 200 |
| UAB "Unlimited power 4" | · | 200 | 200 |
| UAB "Taveda" | · | 200 | 200 |
| UAB "Navitas Storage" | · | 200 | 200 |
| Litrinka, UAB | 150 | · | 150 |
| UAB "Ignitis renewables projektai 8" | 150 | · | 150 |
| UAB "Jursola" | · | 150 | 150 |
| UAB "LitVerslas" | · | 150 | 150 |
| UAB "PV Energy 200" | · | 150 | 150 |
The 66 holders of a protocol or of open conditions for standalone storage; the twelve largest are shown. Litgrid names the company that holds the paper, which is often a project company, so a group with several companies appears on several lines. Every project.
The 18 batteries already connected
Litgrid’s list of connected plant gives the connection point and the size, and names no owner.
| Connection point | MW | kV |
|---|---|---|
| Šyšos TP | 150 | 330 |
| Panevėžio TP | 80 | 110 |
| Panevėžio TP | 70 | 110 |
| Tausalo TP | 60 | 110 |
| Šventininkų TP | 60 | 110 |
| Alytus | 50 | 110 |
| Lijono TP, Kaišiadorys-Žasliai | 50 | 110 |
| Utena | 50 | 110 |
| Vilnius | 50 | 110 |
| Šiauliai | 50 | 110 |
| Juodupės TP | 45 | 110 |
| Taurų TP | 43 | 110 |
| Naujažerio TP, Kaišiadorys-Žasliai | 41 | 110 |
| Dotenėnų TP, Pabradė-Švenčionėliai | 40 | 110 |
| Medinos TP | 30 | 110 |
| Telšiai-Tarvainių trauka | 30 | 110 |
| Šašaičių TP, Atš. Eigirdžiai | 30 | 110 |
| Padvarnių TP, Suginčiai-Molėtai | 20 | 110 |
Batteries beside wind and solar
Litgrid lists plants that pair a battery with wind or solar as their own types, and the megawatts it gives are for the whole plant. The battery’s share is known only where Litgrid’s note states it.
| Stage | Plants | Whole plant, MW | Battery stated, MW | Plants with no battery figure |
|---|---|---|---|---|
| Connected | 4 | 250 | 109 | · |
| Intent protocol signed | 44 | 4,350 | 1,396 | · |
| Preliminary conditions | 12 | 1,353 | 444 | 3 |
Where Litgrid shows room for storage in 2026
Litgrid groups its lines and substations into zones and gives, for each zone and each year to 2035, how much storage could still connect. Litgrid’s own notes set four limits on reading it. The figures are preliminary and every request is assessed on its own. A zone’s figure can be used at one or several of its lines and substations. The figure describes sending power to the grid, and charging may be allowed less. And reserving capacity in one zone can cut what is left in its neighbours, so the zones cannot be added up.
| Zone | Substations in it, or its lines where it has none | Free for storage, MW | Reserved for storage, MW | Zone ceiling, MW |
|---|---|---|---|---|
| 95 | Darbėnai | 1,300 | 100 | 1,400 |
| 72 | 330 kV lines: Kruonio HAE-Kaunas (LN 328), Kruonio HAE-Kaunas (LN 329) | 740 | · | 1,480 |
| 101 | Kaunas | 740 | · | 1,480 |
| 107 | Lietuvos E | 740 | · | 1,480 |
| 74 | 330 kV lines: Lietuvos Elektrinė-Neris (LN 331), Lietuvos Elektrinė-Vilnius (LN 332), Lietuvos Elektrinė-Vilnius (LN 533) and 1 more | 620 | · | 1,240 |
| 103 | Neris | 620 | · | 1,240 |
| 67 | 330 kV lines: Darbėnai-Bitėnai (LN-535), Darbėnai-Klaipėda (LN 536), Grobinė-Darbėnai (LN 324) | 620 | · | 620 |
| 105 | Alytus | 420 | 140 | 1,480 |
| 106 | Kruonio HAE | 400 | · | 1,480 |
| 98 | Bitėnai | 400 | · | 1,200 |
| 94 | Mūša | 400 | 220 | 620 |
| 96 | 330 kV lines: Viskali-Mūša (LN 305) | 400 | · | 620 |
The twelve zones with the most room for storage, of 107; 36 zones show none. Zone numbers and substations as on Litgrid’s map, read 24 November 2026. Every zone and every year as a CSV.
What is not here, and why
Batteries on the distribution grid, because Litgrid’s map covers the transmission grid only and the distribution operator, ESO, is not yet read. How long each battery can run, because Litgrid lists megawatts and no megawatt hours. Who owns the connected batteries, because that list names none. What a battery earns, the system right now and prices, which are not built for Lithuania yet. And any history before 14 November 2026, because Litgrid overwrites its map and keeps no earlier copies.
Sources: Litgrid’s public connection map, read every day through the map’s own data service and kept as read. The megawatts, holders, dates and map points are Litgrid’s. Worked out by Vitreous and marked so in the register: the nearest substation to a map point, and the match between a set of conditions and the protocol that followed it. Litgrid’s own summary table on the map does not agree with its lists and is not used.