Sweden · the batteries, the official counts and the markets they earn in

Svenska kraftnät has approved 1,730 MW of battery storage to hold frequency reserve, 173 times what it had in January 2023. Owners name 55 batteries operating, 909 MW.

1,730 MWof storage approved by Svenska kraftnät to sell FCR-D up on 1 October 2026, from 10 MW on 20 January 2023
1,128 MWof batteries connected at the end of 2025 by Statistics Sweden’s count, 551 MW a year before; it says the figures are probably too low
909 MWin the 55 batteries their owners name as operating; 30 MW more being built in 5, and 847 MW announced
€500,445the most one megawatt in SE3 could have been paid in Svenska kraftnät’s reserve markets in the twelve months to March 2026, the best product each hour

Svenska kraftnät’s pages and open data read 25 October 2026. Statistics Sweden’s table updated 8 October 2026. The owners’ releases read to 25 October 2026. Rebuilt on every refresh.

Sweden publishes no list of its batteries. Three bodies count them and name none: Statistics Sweden the megawatts connected at each year end, Svenska kraftnät the storage it has approved for each reserve market and the storage waiting in its connection queue, and the trade body Green Power Sweden the battery cases filed with the county boards. So this page reads those counts side by side with the batteries their owners and builders have named in their own words, and with what one megawatt is paid in the markets Svenska kraftnät runs.

Open the Atlas   What a megawatt is paid

Owners name nearly all the large batteries Statistics Sweden counts, and few of the small ones

Statistics Sweden, with the Swedish Energy Agency, counted 1,128 MW and 1,172 MWh of batteries connected to the grid at the end of 2025, and splits the count by how much each battery stores. In the batteries holding more than 10 MWh it counted 666 MW and 671 MWh. The batteries their owners name as running by the end of 2025 with a stated store in that range hold 592 MW and 670 MWh between 26 of them, and 4 more, 102 MW, were running with no store published: Bredhälla, Göteborg (Ingrid and Locus), Haninge (Polar Capacity), Kungälv (Flower). Counted with those four, the named list reaches Statistics Sweden’s count of the large batteries; on stated stores alone it holds 592 of its 666 MW. Below 10 MWh it does not come close: Statistics Sweden counts 232 MW in batteries of 1 to 10 MWh, and owners name 7 of them, 39 MW. A further 230 MW sits in batteries under 1 MWh, homes and small businesses mostly, which this site does not list.

Over 10 MWh666 MW, Statistics Sweden693 MW, named by owners1 to 10 MWh232 MW, Statistics Sweden39 MW, named by ownersUnder 1 MWh230 MW, Statistics Sweden

Statistics Sweden, table “Nätanslutna batterier efter lagringskapacitet” (EN0105, source the Swedish Energy Agency, CC0), updated 8 October 2026; its own footnote says the batteries’ total storage and power are probably under-reported. The named batteries counted are those their owners give as operating with a start in 2025 or before, sized by their stated MWh, and the blue bar over 10 MWh includes the 4 running with no store published; the 14 BW ESS and Ingrid batteries carry no MWh each, and are taken as one hour because their owners give the portfolio as 211 MW and 211 MWh. The grey bar for the smallest batteries has no blue beside it because the site does not list them.

Statistics Sweden’s bands and the named list, as a table
Battery storeSCB, MWSCB, MWhNamed, batteriesNamed, MW
Over 100 MWh00··
Over 10 to 100 MWh66667126592
1 to 10 MWh232230739
Under 1 MWh230273··

Svenska kraftnät has approved 1,730 MW of storage to sell FCR-D up, from 10 MW in January 2023. That is more than the batteries anyone names

Before a battery may sell a reserve, Svenska kraftnät tests it and approves it for that product, and it publishes the storage it has approved, product by product, about four times a year. The figure for FCR-D up, the upward disturbance reserve and the product batteries entered first and in the largest numbers, went from 10 MW in January 2023 to 1,250 MW on 1 January 2026 and 1,730 MW on 1 October 2026. It runs ahead of every other count for two reasons. Approval is for the storage behind a seller, so home and small business batteries pooled by an aggregator count, and Svenska kraftnät’s list of fast frequency reserve sellers for 2026 names CheckWatt, whose virtual power plant pools “thousands of distributed batteries” (cnet.se, November 2023). And it counts batteries that started in 2026, which Statistics Sweden has not yet counted. It does not double count: a battery approved for several products appears once under each.

05001,0001,5002,00020 Jan202310 MW1 Jan202480 MW1 Jan2025610 MW1 Jan20261,250 MW1 Oct20261,730 MW

By 1 October 2026 the storage approved for upward mFRR, 1,755 MW, had caught it up, from under 10 MW on 1 January 2024.

Svenska kraftnät, “Utbud på marknaderna för reserver”, the storage line (Energilager) for FCR-D up, rounded to the nearest 10 MW by SvK; its spreadsheet of past figures for each 1 January from 2023, and its page for 1 October 2026, read 25 October 2026. Storage combined with hydro or wind is counted by SvK on lines of its own (110 MW for FCR-D up on 1 October 2026) and is left out here.

Storage approved for every product, as a table
As ofFFRFCR-NFCR-D upFCR-D downaFRR upaFRR downmFRR upmFRR down
20 January 2023400105····
1 January 20246010806000520
1 January 202530013061057000120120
1 January 20268304601,2501,18010101,1901,130
1 October 20269607401,7301,6801701701,7551,690

Megawatts, rounded by SvK to the nearest 10; where SvK writes “under 10” the table shows 5.

The market is crowded: 2.4 megawatts of storage approved for every megawatt of FCR-D up Svenska kraftnät bought in Sweden in January 2026, from 0.02 in January 2023

Svenska kraftnät buys a roughly steady amount of FCR-D up each hour, about five hundred megawatts in Sweden’s four zones, while the storage approved to sell it keeps growing. Set the approved storage against the average volume bought in the same month and the line passes one, as much approved as is bought, in January 2025. Since then batteries compete with each other for the volume, and the price follows: the FCR-D up price that paid one megawatt about €13,000 in February 2024 paid under €3,000 in March 2026.

01x2x3xas much approved as is bought0.02x20 Jan 20230.2x1 Jan 20241.1x1 Jan 20252.4x1 Jan 2026

The storage approved is Svenska kraftnät’s figure at each published date; the volume is the average hourly FCR-D up it bought in SE1 to SE4 that month, the two daily auctions together, DK2 left out, from its Data Service (CC BY 4.0). A battery can be approved for several products at once, and then counts in the ratio of each.

The best hour by hour stack paid one megawatt in SE3 €52,108 in February 2024 and €19,306 in March 2026

Swedish batteries earn mostly by holding reserve for Svenska kraftnät, which buys it hour by hour in markets whose prices and volumes it publishes. The bars are the most one megawatt in SE3, the Stockholm zone where most Swedish batteries are, could have been paid each month with perfect hindsight, choosing the best product every hour, before any cost; a real battery earns less. FCR is one market for the whole country, so its price is the same in every zone; aFRR and mFRR are priced zone by zone, which is why the ceiling differs a little between them. Over the twelve months to March 2026 the ceiling in SE3 was €500,445 for the megawatt.

0€50,000€100,000€150,000AprJulOctJan2025AprJulOctJan2026Apr€19,306€131,586€52,108€18,868

Calculated by Vitreous from Svenska kraftnät’s hourly prices and volumes on its Data Service (CC BY 4.0); a price counts only in an hour in which SvK bought something. The bars start in February 2024, when FCR moved to one clearing price, and the FCR figures stop on 14 April 2026, when SvK stopped publishing FCR on its Data Service; the months after carry only aFRR and mFRR and are left out of the ceiling. The grey bar is a part month. Energy trading on the day-ahead and intraday markets is not in these figures, because Nord Pool’s prices may not be shown here. Every market and zone, month by month, and how each figure is made.

Held back until the publisher answers in writing: Svenska kraftnät’s Mimer files, the only home of FCR after 14 April 2026 and of FCR’s pay as bid prices before February 2024, which state no terms of reuse; eSett’s metered battery output per zone, whose terms say the data is public but grant no right to republish; the county boards’ public diaries, which carry no terms at all. Each is read and kept on schedule, and the pages are built to show it the day the answer comes.

Where the named batteries are, and where the next ones are asking to go

One circle per battery named by its owner, at the place its name carries or the seat of its municipality, sized by power. Yellow operates; blue is being built; pale blue is announced; grey has had no word since its date.

Horsaryd, 100 MWVaggeryd (Ingrid, 100 MW), 100 MWIsbillen Power Reserve, 94 MWKarlshamn, Duveryd (70 MW), 70 MWÅnge BESS, 70 MWVolvo Mariestad energy park, 70 MWStoren Power Reserve, 52 MWBoden (Polar Structure), 50 MWFageråsen (beside the wind farm), 50 MWHallsberg (SENS), 50 MWKatrineholm (SENS), 50 MWNäsbyholm, 45 MWBredhälla, 42 MWOrmesta, 40 MWMora, 40 MWSöderala, 40 MWEmmaboda Energipark, 40 MWBruzaholm (beside the wind farm), 38 MWHjuleberg (beside the wind farm), 30 MWMälarenergi battery park at the Västerås power station, 30 MWHöge väg (beside the wind farm), 25 MWFilipstad (Axpo), 25 MWGöteborg (Ingrid and Locus), 24 MWEskilstuna (BW ESS and Ingrid), 20 MWVarberg (BW ESS and Ingrid), 20 MWVimmerby (BW ESS and Ingrid), 20 MWKatrineholm (BW ESS and Ingrid), 20 MWSandviken (BW ESS and Ingrid), 20 MWVärnamo (BW ESS and Ingrid), 20 MWLerum (Ingrid and Locus), 20 MWRomme, 20 MWHaninge (Polar Capacity), 20 MWElektra, Landskrona, 20 MWÅkerslundsverket, Ängelholm, 20 MWAlingsås (RES and SCR), 20 MWFemstenaberg (beside the wind farm), 20 MWVasa Vind wind farm battery, Strömsund, 20 MWFalköping (BW ESS and Ingrid), 16 MWKarlskrona (BW ESS and Ingrid), 16 MWKungälv (Flower), 15 MWHanhals, 15 MWLindome, 15 MWGävle (BW ESS and Ingrid), 12 MWRättvik (Ingrid and Locus), 12 MWVaggeryd (BW ESS and Ingrid), 11 MWVästerås (BW ESS and Ingrid), 11 MWTvååker, 11 MWGrums, 10 MWTorsvik, Jönköping, 10 MWMjölby (BW ESS and Ingrid), 8 MWFalkenberg (Primrock), 5 MWUppsala (Vattenfall), 5 MWForshuvud (beside the hydro plant), 5 MWVetlanda (Hydro), 4 MWTekniska verken, Mjölby truck charging park, 4 MWRiskulla, Mölndal, 4 MWKarlshamn pilot (reused bus batteries), 3 MWHumlestaden, Göteborg (reused car batteries), 3 MWE.ON Malmö battery, 1 MWFalkenberg (BW ESS and Ingrid), 0 MWSala (BW ESS and Ingrid), 0 MWFalköping (Ingrid and Locus), 0 MWTuve (Ingrid and Locus), 0 MWLidköping (Ingrid and Locus), 0 MWGötene (Ingrid and Locus), 0 MWEskilstuna (Monsson), 0 MWHärryda (Monsson), 0 MWHylte Paper battery park, 0 MWCA Batteribalans, Lerum, 0 MWFalu Energi & Vatten, Falun, 0 MWNordic Solar, Södertälje, 0 MWNybro Energi, 0 MWHallstahammar hydropower station battery, 0 MWEdsele (beside the hydro plant), 0 MWHissmofors (beside the hydro plant), 0 MWGrycksbo paper mill battery, 0 MWMunkedal paper mill battery, 0 MWMotala (SENS), 0 MWBALTIC SEABOTHNIAN SEABOTHNIAN BAYKATTEGATStockholmGothenburgMalmöUppsalaVästeråsÖrebroLinköpingHelsingborg
Battery, operatingBattery, being builtBattery, announcedBattery, no word since its date

78 of 88 batteries placed by GeoNames, because no source gives coordinates; 10 have no municipality in any source and are not drawn.

Of the 909 MW named as operating, 585 MW is in SE3, 104 MW in SE4, 217 MW in SE2 and 2.5 MW in SE1. The queue points the same way. Svenska kraftnät’s own connection queue held 2,260 MW of storage asking to feed in and 2,176 MW asking to draw out on 1 October 2026, 2,196 MW and 2,152 MW of it in SE3; and of the 130 battery cases the county boards approved from 2021 to 2025, Green Power Sweden counts 64 in SE3 and 46 in SE4.

ZoneNamed running, MWQueue in, MWQueue out, MWCases approvedTheir MW
SE12.5002167
SE2217642418717
SE35852,1962,152642,624
SE410400461,607

Named running: the batteries their owners name as operating. Queue in and queue out: storage asking to feed power into the grid and to draw power from it. Cases approved and their MW: battery cases the county boards approved. Svenska kraftnät, “Ansökt effekt per elområde” and “Information om pågående anslutningsärenden”, power waiting in its queue until capacity is reserved, as of 1 October 2026, read 25 October 2026; the transmission grid only, so a battery asking to join a regional or local grid is not in it. Green Power Sweden, “Batteriparksstatus 2025”, tables 7 and 8: cases filed with the county boards for consultation under chapter 12, section 6 of the Environmental Code, or as part of a wind or solar permit, approved from 2021 to 2025; power is Green Power Sweden’s estimate, since only 39 of 168 cases state it. Neither names a project.

Open the Atlas, every battery on the map Every battery, one page each Who owns them Who trades them What changed, read by read The system, right now

168 battery cases went to the county boards from 2021 to 2025, about 7.4 GW by Green Power Sweden’s estimate, against 909 MW anyone names as running

A battery park outside an industrial site is usually notified to its county board for consultation before it is built, and a battery inside a wind or solar park is part of that park’s permit. Green Power Sweden asked all 21 county boards for those papers and counted 168 cases filed from 2021 to 2025: 118 stand-alone batteries, 39 beside solar, 8 beside wind and 3 beside both. The boards approved 130, refused or turned away 10, and had 28 still open at the end of 2025. Only 39 of the cases state their power, 2,163 MW between them; the rest is Green Power Sweden’s estimate from the area each covers. Svenska kraftnät’s own queue, which holds only what asks to join the transmission grid, had 2,260 MW of storage in it. Neither count names a project.

Green Power Sweden, Batteriparksstatus 2025, mapping to 31 December 2025, held as se/stats/green-power-sweden-battery-parks-2026-06.pdf. Svenska kraftnät, connection queue statistics as of 1 October 2026.

Every battery named as operating

As the owner, developer or builder states it; the date is the owner’s stated start. Every figure’s source is on the battery’s page.

BatteryOwnerMunicipalityZoneMWMWhStarted
Isbillen Power ReserveNeoenSollefteåSE294942025
Ånge BESSÅnge Storage Solutions ABÅngeSE27016023 June 2026
Storen Power ReserveNeoenRagundaSE2525217 June 2024
BredhällaFlowerUppvidingeSE442·August 2024
OrmestaEllevio Energy SolutionsÖrebroSE340402025
MoraEllevio Energy SolutionsMoraSE34040June 2026
SöderalaEllevio Energy SolutionsSöderhamnSE340402025
Bruzaholm (beside the wind farm)VattenfallEksjöSE33838December 2025
Hjuleberg (beside the wind farm)VattenfallFalkenbergSE330352024
Höge väg (beside the wind farm)VattenfallKristianstadSE425292025
Göteborg (Ingrid and Locus)Ingrid Capacity and Locus EnergyGöteborgSE324·2025
Eskilstuna (BW ESS and Ingrid)BW ESS and Ingrid CapacityEskilstunaSE320·10 October 2024
Varberg (BW ESS and Ingrid)BW ESS and Ingrid CapacityVarbergSE3202010 October 2024
Vimmerby (BW ESS and Ingrid)BW ESS and Ingrid CapacityVimmerbySE320·10 October 2024
Katrineholm (BW ESS and Ingrid)BW ESS and Ingrid CapacityKatrineholmSE320·10 October 2024
Sandviken (BW ESS and Ingrid)BW ESS and Ingrid CapacitySandvikenSE320·10 October 2024
Värnamo (BW ESS and Ingrid)BW ESS and Ingrid CapacityVärnamoSE320·10 October 2024
Lerum (Ingrid and Locus)Ingrid Capacity and Locus EnergyLerumSE320202025
RommeCentricaBorlängeSE32020April 2026
BullerforsenCentrica·SE32020April 2026
Haninge (Polar Capacity)Polar Capacity and Stockholm ExergiHaningeSE320·October 2023
Elektra, LandskronaAxpoLandskronaSE4202012 February 2024
Falköping (BW ESS and Ingrid)BW ESS and Ingrid CapacityFalköpingSE316·10 October 2024
Karlskrona (BW ESS and Ingrid)BW ESS and Ingrid CapacityKarlskronaSE416·10 October 2024
Kungälv (Flower)FlowerKungälvSE315·21 August 2024
HanhalsEllevio Energy SolutionsKungsbackaSE31515May 2024
LindomeEllevio Energy SolutionsMölndalSE31515May 2024
Gävle (BW ESS and Ingrid)BW ESS and Ingrid CapacityGävleSE312·10 October 2024
Rättvik (Ingrid and Locus)Ingrid Capacity and Locus EnergyRättvikSE3121224 September 2025
Vaggeryd (BW ESS and Ingrid)BW ESS and Ingrid CapacityVaggerydSE311·10 October 2024
Västerås (BW ESS and Ingrid)BW ESS and Ingrid CapacityVästeråsSE311·10 October 2024
TvååkerVarberg EnergiVarbergSE311··
GrumsEllevio Energy SolutionsGrumsSE310102023
Torsvik, JönköpingJönköping EnergiJönköpingSE3101023 May 2025
Mjölby (BW ESS and Ingrid)BW ESS and Ingrid CapacityMjölbySE38·10 October 2024
Falkenberg (Primrock)PrimrockFalkenbergSE35.4··
Uppsala (Vattenfall)VattenfallUppsalaSE35202020
Forshuvud (beside the hydro plant)FortumBorlängeSE356.22019
Vetlanda (Hydro)HydroVetlandaSE34.5··
Riskulla, MölndalMölndal EnergiMölndalSE344.4January 2026
Humlestaden, Göteborg (reused car batteries)·GöteborgSE32.82.6July 2023
Båtfors (beside the hydro plant)Skellefteå Kraft·SE12.54.4November 2024
E.ON Malmö batteryE.ONMalmöSE411·
Granboforsen (beside the hydro plant)Jämtkraft·SE2112021
Falkenberg (BW ESS and Ingrid)BW ESS and Ingrid CapacityFalkenbergSE3··10 October 2024
Sala (BW ESS and Ingrid)BW ESS and Ingrid CapacitySalaSE3··10 October 2024
Falköping (Ingrid and Locus)Ingrid Capacity and Locus EnergyFalköpingSE3···
Hylte Paper battery parkHylte PaperHylte··42December 2024
Falu Energi & Vatten, FalunFalu Energi & VattenFalunSE3·12December 2024
Hallstahammar hydropower station battery·HallstahammarSE3·8·
Landaforsen (beside the hydro plant)Fortum·SE3···
Edsele (beside the hydro plant)UniperSollefteåSE2··2021
Lövön (beside the hydro plant)Uniper·SE2··2021
Bodum (beside the hydro plant)Uniper·SE2··2022
Fjällsjö (beside the hydro plant)Uniper·SE2··2022

Being built

BatteryOwnerMunicipalityZoneMWMWhExpected
Mälarenergi battery park at the Västerås power stationMälarenergiVästeråsSE330602026
Tuve (Ingrid and Locus)Ingrid Capacity and Locus EnergyGöteborgSE3··2026
Lidköping (Ingrid and Locus)Ingrid Capacity and Locus EnergyLidköpingSE3··2026
Götene (Ingrid and Locus)Ingrid Capacity and Locus EnergyGöteneSE3··2026
Nordic Solar, SödertäljeNordic SolarSödertäljeSE3·18·

The owners with the most operating

Who trades them

Five traders are named on 29 of the batteries, 462 MW between them. Only a company Svenska kraftnät has approved as a balancing service provider may sell a battery’s reserve; its list of 33 such companies is on the traders page.

Trader namedBatteriesMW
Ingrid Capacity21250
Centrica Energy3110
Flower372
Stockholm Exergi120
Ntricity110

What is not here, and why

Which batteries make up the official counts, because no Swedish body publishes a unit list. What each battery earns, because Svenska kraftnät publishes each market’s prices and volumes and names no bidder, so the money here is what one megawatt could earn in each market. The day-ahead price, because it is Nord Pool’s and Nord Pool declined permission to show it; Svenska kraftnät republishes it on its Data Service, and whether that licence covers showing it here has been asked. FCR after 14 April 2026, and FCR’s prices before February 2024, because they are published only on Mimer, which states no terms. The batteries’ own metered output per zone, which eSett publishes with no right to republish stated. The county boards’ battery cases by name, from their diaries, which carry no terms. Coordinates for most batteries, because no owner publishes them. A connection figure is never passed off as a battery’s size.

Sources: Statistics Sweden, table EN0105 (CC0); Svenska kraftnät’s pages on the supply of reserves and on its connection queue, and its Data Service at data.svk.se (CC BY 4.0); Green Power Sweden, Batteriparksstatus 2025. The named batteries from se/hand/batteries.csv, kept by hand from owners’, developers’ and builders’ own releases and the press, every fact with its web address, read to 25 October 2026. Places from GeoNames, CC BY 4.0. Nothing on this page is modelled.