Sweden · the named batteries
Bruzaholm (beside the wind farm)
Operating, 38 MW · 38 MWh, in Eksjö (SE3), owned by Vattenfall. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 38 MW |
| Capacity | 38 MWh |
| Duration | 1.0 hours |
| Status | Operating, as of 20 May 2026 |
| Owner’s date | December 2025, actual |
| Municipality | Eksjö |
| Bidding zone | SE3, Stockholm |
| Placed on the map | at Bruzaholm, the place its name carries (GeoNames) |
Who is behind it
| Owner | Vattenfall |
| Built by | Fluence (battery system) |
Not published anywhere we have found: ultimate owner, developer, traded by, cells.
What the sources say
Sixty battery modules beside the 138 MW wind farm, which entered production in December 2025; inaugurated 20 May 2026 (energi.se).
Evidence and sources
- name, municipality, owner, builder, power, capacity, bidding zone: powerplants.vattenfall.com/bruzaholm
- status: energi.se/artiklar/2026/maj-2026/vattenfall-inviger-hybri…
From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B037.