Bruzaholm (beside the wind farm)

Operating, 38 MW · 38 MWh, in Eksjö (SE3), owned by Vattenfall. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power38 MW
Capacity38 MWh
Duration1.0 hours
StatusOperating, as of 20 May 2026
Owner’s dateDecember 2025, actual
MunicipalityEksjö
Bidding zoneSE3, Stockholm
Placed on the mapat Bruzaholm, the place its name carries (GeoNames)

Who is behind it

OwnerVattenfall
Built byFluence (battery system)

Not published anywhere we have found: ultimate owner, developer, traded by, cells.

What the sources say

Sixty battery modules beside the 138 MW wind farm, which entered production in December 2025; inaugurated 20 May 2026 (energi.se).

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B037.

All batteries  ·  On the map