Vitreous LabsEnergy transparency
Belgium · the batteries Elia schedules, the ones it does not, and the meter

Belgium’s grid operator names every battery it schedules: 14 of them, 828 MW. Another 1,720 MW is being built, about twice what Elia schedules today.

828 MWof batteries in Elia’s schedule on 20 October 2026, 14 batteries in 17 units, each named by its operator, against 419 MW a year earlier
1,720 MWbeing built in 12 batteries, 946 MW of it due by the end of 2027 by its owners’ own dates
450 MWin the three batteries large enough to carry a published meter: ENTSO-E publishes the output of every Belgian unit of 100 MW and more
28 MWrunning outside Elia’s schedule that an owner has named, on a distribution grid; the rest of that part of the fleet is unnamed

Elia’s open data read 20 October 2026, every day. The owners’ releases read to 19 October 2026. ENTSO-E’s meter to 16 October 2026. Rebuilt on every refresh.

Belgium is the first market after Britain and Ireland where the grid operator’s own list names the batteries. Elia, the transmission system operator, publishes every day the units it schedules, with each one’s maximum power, and the batteries in it carry their operators’ names. This page reads that list day by day, joins each battery to its owner’s and builder’s own words, adds the batteries Elia does not schedule, and reads the meter ENTSO-E publishes on the largest.

Open the Atlas   Every battery

Elia’s list rose from 75 MW to 828 MW in 29 months, and every step in it has a name

Each step in this line is a battery Elia started scheduling, named by its operator in Elia’s own file. Elia usually starts scheduling a battery when it begins testing, months before its owner says it is in commercial operation: Vilvoorde entered the list at the start of May 2025 and ENGIE declared it fully in service on 14 November 2025. So a step is the day a battery reached the grid, not the day it started earning.

02004006008001,000JulOctJan 2025AprJulOctJan 2026AprJulOct+50 MWVille-sur-Haine+200 MWVilvoorde 1 and Vilvoorde 2+75 MWHarmignies+200 MWNavagne and D-STOR+49 MWBrecht and TotalEnergies Antwerp+100 MWEStor-Lux II75 MW, 22 May 2024828 MW20 Oct 2026
02004006008001,000JulJan 2025JulJan 2026Jul+200 MWVilvoorde 1 and Vilvoorde 2+200 MWNavagne and D-STOR+100 MWEStor-Lux II75 MW, 22 May 2024828 MW20 Oct

Elia Transmission Belgium, open data dataset ods179, “Individual data of contracted technical units”, the storage units, every day from 22 May 2024 to 20 October 2026, read 20 October 2026, Elia Open Data Licence. Steps of 45 MW or more are named, 100 MW or more on a phone; every step is in the table below. One capacitor bank Elia files as storage at 0 MW is left out. The dated steps are on the change ledger.

Every battery in Elia’s list, and the day it entered
Elia’s nameThe batteryFirst in the listPower, as Elia lists it
Deux-Acren Energy StorageDeux-Acren Energy Storage22 May 202450 MW · not listed on every day between
Ruien Energy StorageRuien Energy Storage22 May 202425 MW · not listed on every day between
TotalEnergies Battery Refinery AntwerpTotalEnergies Antwerp refinery battery5 August 202425 MW from 5 August 2024, then 25 MW from 24 March 2026, then 49 MW from 1 July 2026 · not listed on every day between
Eneco Ville-Sur-Haine BESSEneco Ville-sur-Haine2 September 202450 MW · not listed on every day between
Estor-Lux _ StorageEStor-Lux I23 October 202412 MW · not listed on every day between
Drogenbos BatteriesDrogenbos Batteries (Elia’s name)23 January 20257 MW · not listed on every day between
Vilvoorde BESS 1ENGIE Vilvoorde1 May 2025100 MW · not listed on every day between
Vilvoorde BESS 2ENGIE Vilvoorde1 May 2025100 MW · not listed on every day between
Harmignies Energy Storage BESSHarmignies Energy Storage1 September 202575 MW from 1 September 2025, then 76 MW from 8 January 2026 · not listed on every day between
Nyrstar Belgium Balen BESS 1Nyrstar Balen1 November 202515 MW · not listed on every day between
Nyrstar Belgium Balen BESS 2Nyrstar Balen1 November 202510 MW · not listed on every day between
Luminus Storage Visé BESSNavagne (Luminus Storage Visé)7 February 2026150 MW · not listed on every day between
D-STOR La Louvière BESS 1D-STOR La Louvière11 February 202650 MW · not listed on every day between
Brecht E19 BESSBrecht E1913 March 202624 MW · not listed on every day between
Katoen Natie Bulk Terminal Kallo BESS 1Katoen Natie Kallo21 May 20265 MW
Katoen Natie Bulk Terminal Kallo BESS 2Katoen Natie Kallo22 May 20265 MW
Estor-Lux II Aubange BESS 1EStor-Lux II Aubange4 August 2026100 MW

The TotalEnergies Antwerp unit was listed in August 2024, dropped a month later and listed again from March 2026; it doubled to 49 MW at the end of June 2026, where TotalEnergies has announced 25 MW at Antwerp. We have asked Elia which battery the 49 MW covers.

ENGIE Vilvoorde made 1.3 full discharges a day over the last 30 days of ENTSO-E’s meter, the most of the three metered batteries

ENTSO-E, the European grid operators’ platform, publishes the metered output of every Belgian generating unit of 100 MW and more, hour by hour, and Belgium files its largest batteries there. Dividing the energy a battery put out by the energy it can hold gives the number of times it emptied itself, which is the plainest measure of how hard it is worked. The meter counts output only; ENTSO-E publishes no charging for a unit, so what each battery drew is not here.

Full discharges each month, one chart per battery, on one scale.

ENGIE Vilvoorde

200 MW · 800 MWh · first output 6 June 2025

03060JulJan 26Jul47

Navagne (Luminus Storage Visé)

150 MW · 600 MWh · first output 27 February 2026

03060AprJulOct11

EStor-Lux II Aubange

100 MW · 270 MWh · first output 17 August 2026

03060Oct11

Full discharges each month: the battery’s metered output that month divided by the capacity its owner states. A grey bar is a month the meter covers only in part, the battery’s first month or this one. ENTSO-E Transparency Platform, actual generation per generation unit (16.1.A), read 20 October 2026, to 16 October 2026; ENTSO-E publishes Belgian unit data a few days late. Every metered battery, month by month, with the table.

BatteryMWMWhFull discharges a day, last 30 daysDays with output, last 30Highest output, MWFirst output
ENGIE Vilvoorde2008001.330 of 302006 Jun 2025
Navagne (Luminus Storage Visé)1506000.17 of 3010027 Feb 2026
EStor-Lux II Aubange1002701.226 of 3010017 Aug 2026

Navagne (Luminus Storage Visé) put out power on 7 of the last 30 days of the meter, and never more than 100 MW of its 150 MW, so its low figure is days without output, not light work on the days it ran; nothing published says why.

The metered batteries put out most at 20:00 and least at 03:00, Brussels time

The average output of the metered batteries together, hour by hour of the Brussels day, across every day ENTSO-E has published for each. A battery is paid for moving energy from the cheap hours to the dear ones, and for standing ready for Elia’s reserves, and this shape is what that looks like from the meter.

05010015000:0003:002 MW06:0009:0012:0015:0018:00142 MW21:00

Average of every hour ENTSO-E published for 3 batteries, by hour of the Brussels day, in MW. Output only.

Belgium’s batteries put out 97 GWh in September 2026, from 13.4 GWh in January 2025

ENTSO-E also publishes the output of all Belgian storage together, hourly. Elia files it under energy storage, and the figure takes in every battery Elia meters, not only the three large ones. Pumped hydro at Coo and Plate-Taille is filed separately and is not in it.

020406080100120Jan 202513AprJulOctJan 2026AprJul97Oct58so farGWh

ENTSO-E Transparency Platform, aggregated generation per type (16.1.B&C), Belgium, energy storage (B25), read 20 October 2026. The grey bar is this month so far. Output only.

The months as a table
MonthGWh out
January 202513.4
February 202512.3
March 202515.6
April 202514.1
May 202512.9
June 202512.4
July 202511.5
August 202518.3
September 202526.9
October 202545.7
November 202556.0
December 202548.8
January 202659.3
February 202652.1
March 202668.1
April 202676.0
May 202674.6
June 202684.3
July 202680.2
August 202688.4
September 202697.0
October 202657.6

Where the batteries are

One circle per named battery, sized by power. Yellow is scheduled by Elia or running; blue is being built; pale blue is announced; grey has no confirmed start.

Green Turtle, 700 MWBlue Marlin, 300 MWENGIE Vilvoorde, 200 MWStorm Ruien, 200 MWProject Volt (Garocentre), 170 MWNavagne (Luminus Storage Visé), 150 MWEStor-Lux II Aubange, 100 MWENGIE Kallo, 100 MWStorm Langerlo, 100 MWRuien II, 100 MWLuminus Ghent Ringvaart, 100 MWStorm Zeebrugge, 100 MWENGIE Vilvoorde phase 3, 100 MWENGIE Drogenbos, 80 MWAuvelais Energy Storage, 76 MWHarmignies Energy Storage, 75 MWENGIE Coo, 74 MWDeux-Acren Energy Storage, 50 MWEneco Ville-sur-Haine, 50 MWD-STOR La Louvière, 50 MWGramme Storage 1, 50 MWHybriX Volta, 35 MWHybriX Franklin, 35 MWRuien Energy Storage, 25 MWTotalEnergies Antwerp refinery battery, 25 MWNyrstar Balen, 25 MWBrecht E19, 25 MWTotalEnergies Feluy, 25 MWCentrica Ostend, 24 MWTerhills, 18 MWEStor-Lux I, 10 MWKatoen Natie Kallo, 10 MWEcoSourcen Deinze, 10 MWDrogenbos Batteries (Elia’s name), 7 MWHanzinelle, 0 MW
Battery, scheduled by Elia or runningBattery, being builtBattery, announcedBattery, start not confirmed

35 of 35 batteries placed: 13 at the site itself, where OpenStreetMap has the battery mapped, the rest at the place their source names or the centre of their municipality, from GeoNames. By their owners’ figures, 830 MW scheduled or running, 1,720 MW being built, 649 MW announced or unconfirmed.

Open the Atlas, every battery on the map Every battery, one page each The metered batteries, month by month What changed, day by day

Every battery Elia schedules, and the ones running beside it

As the owner, developer or builder states it; the date is the owner’s stated start. 5 of these are in Elia’s schedule with no release from the owner saying commercial operation has begun, and their status says so. Every figure’s source is on the battery’s page.

BatteryStatusOwnerMunicipalityMWMWhStarted
ENGIE VilvoordeOperatingENGIE (Electrabel)Vilvoorde20080014 Nov 2025
Navagne (Luminus Storage Visé)OperatingLuminus (EDF group) with I4BVisé1506001 Sep 2026
EStor-Lux II AubangeEnergised, commissioningBSTOR (75%), SOCOFE (15%), SOPAER (10%)Aubange100270Oct 2026
Harmignies Energy StorageIn Elia’s schedule, start not announcedEnergy Solutions GroupMons753002025
Deux-Acren Energy StorageOperatingCorsica SoleLessines50100Dec 2022
Eneco Ville-sur-HaineOperatingEnecoLe Roeulx50200Oct 2024
D-STOR La LouvièreOperatingBSTOR and Duferco Wallonie (50% each)La Louvière50140Mar 2026
Ruien Energy StorageOperatingNippon Koei Energy Europe and Aquila Clean EnergyKluisbergen251007 Mar 2023
TotalEnergies Antwerp refinery batteryIn Elia’s schedule, start not announcedTotalEnergiesAntwerp25752024
Nyrstar BalenIn Elia’s schedule, start not announcedNala RenewablesBalen251002022
Brecht E19OperatingAspiraviBrecht25100Mar 2026
TerhillsOperatingCentricaDilsen-Stokkem18·Apr 2018
EStor-Lux IOperatingEStor-Lux consortium (SRIW, Ackermans & van Haaren, BEWATT, SOCOFE, SOFILUX)Bastogne1020Dec 2021
Katoen Natie KalloIn Elia’s schedule, start not announcedKatoen NatieBeveren10··
EcoSourcen DeinzeOperatingEcoSourcenDeinze1055Apr 2026
Drogenbos Batteries (Elia’s name)In Elia’s schedule, start not announced·Drogenbos7··

1,720 MW is being built, led by GIGA Storage’s 700 MW Green Turtle at Dilsen-Stokkem

The batteries being built would take the fleet to 2,548 MW if every one is finished. Their owners give dates from the start of 2027 to 2028, and battery projects in Belgium have run late before: Nala Renewables’ Balen battery was due at the end of 2022 and entered Elia’s list in November 2025.

BatteryOwnerMunicipalityMWMWhExpected
Green TurtleGIGA StorageDilsen-Stokkem7002,800Mar 2028
Storm RuienStormKluisbergen2008002027
Project Volt (Garocentre)Aukera Energy and Weerts GroupLa Louvière1703402027
ENGIE KalloENGIE (Electrabel)Beveren1004002027
Storm LangerloStormGenk1004002027
Ruien IINippon Koei Energy Europe (51%), Aspiravi (24.5%), Ecopower (19.6%), Beauvent (4.9%)Kluisbergen1002502027
ENGIE DrogenbosENGIE (Electrabel)Drogenbos803202027
Auvelais Energy StorageEnergy Solutions GroupSambreville763042027
ENGIE CooENGIE (Electrabel)Stoumont742962028
Gramme Storage 1Gramme Storage 1Huy501002027
HybriX VoltaHybriX EnergyGeel351502027
HybriX FranklinHybriX EnergyZandhoven351502027

Announced, and not confirmed

Announced by their owners and not yet being built, or due to have started with no source saying they run.

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Blue MarlinAnnouncedGIGA StorageKinrooi3001,2002030
Luminus Ghent RingvaartAnnouncedLuminus (EDF group)Ghent1004002026
Storm ZeebruggeAnnouncedStormBruges100400·
ENGIE Vilvoorde phase 3AnnouncedENGIE (Electrabel)Vilvoorde100400·
TotalEnergies FeluyStart not confirmedTotalEnergiesSeneffe25752025
Centrica OstendStart not confirmedCentrica Business SolutionsOstend24542024
HanzinelleAnnouncedEtherr.aFlorennes·48·

The owners with the most scheduled or running

Who builds them

Tesla is named on 9 of the 35 batteries. A battery with two firms named counts for each.

Builder, integrator or supplier namedBatteriesMW
Tesla91,319
SPIE5196
Alfen394
NHOA Energy2180
Wärtsilä275
Saft250
Sungrow1200
Luminus1150

What is not here, and why

The batteries on the distribution grids, except the ones an owner has named, because Elia’s list holds only the units it schedules and no distribution company publishes a list battery by battery; Fluvius gives only totals. A meter on any battery below 100 MW, because ENTSO-E’s rules require it only above that size. What each battery draws when it charges, because the meter ENTSO-E publishes is output only. The winners of Elia’s capacity auctions battery by battery, because Elia’s auction reports may not be reproduced without its permission, which we asked for on 19 October 2026. A connection queue, because Elia publishes none battery by battery. Prices: the Belgian day-ahead price is on the European prices page. Nothing on this page is modelled, and a connection figure is never passed off as a battery’s size.

Sources: Elia Transmission Belgium open data, ods179, Elia Open Data Licence. ENTSO-E Transparency Platform, 16.1.A and 16.1.B&C, Belgium. The named batteries from be/hand/batteries.csv, kept by hand from owners’, developers’ and builders’ own releases and the trade press, every fact with its web address. Places from GeoNames (CC BY 4.0) and OpenStreetMap (ODbL).