Belgium’s grid operator names every battery it schedules: 14 of them, 828 MW. Another 1,720 MW is being built, about twice what Elia schedules today.
Elia’s open data read 20 October 2026, every day. The owners’ releases read to 19 October 2026. ENTSO-E’s meter to 16 October 2026. Rebuilt on every refresh.
Belgium is the first market after Britain and Ireland where the grid operator’s own list names the batteries. Elia, the transmission system operator, publishes every day the units it schedules, with each one’s maximum power, and the batteries in it carry their operators’ names. This page reads that list day by day, joins each battery to its owner’s and builder’s own words, adds the batteries Elia does not schedule, and reads the meter ENTSO-E publishes on the largest.
Elia’s list rose from 75 MW to 828 MW in 29 months, and every step in it has a name
Each step in this line is a battery Elia started scheduling, named by its operator in Elia’s own file. Elia usually starts scheduling a battery when it begins testing, months before its owner says it is in commercial operation: Vilvoorde entered the list at the start of May 2025 and ENGIE declared it fully in service on 14 November 2025. So a step is the day a battery reached the grid, not the day it started earning.
Elia Transmission Belgium, open data dataset ods179, “Individual data of contracted technical units”, the storage units, every day from 22 May 2024 to 20 October 2026, read 20 October 2026, Elia Open Data Licence. Steps of 45 MW or more are named, 100 MW or more on a phone; every step is in the table below. One capacitor bank Elia files as storage at 0 MW is left out. The dated steps are on the change ledger.
Every battery in Elia’s list, and the day it entered
| Elia’s name | The battery | First in the list | Power, as Elia lists it |
|---|---|---|---|
| Deux-Acren Energy Storage | Deux-Acren Energy Storage | 22 May 2024 | 50 MW · not listed on every day between |
| Ruien Energy Storage | Ruien Energy Storage | 22 May 2024 | 25 MW · not listed on every day between |
| TotalEnergies Battery Refinery Antwerp | TotalEnergies Antwerp refinery battery | 5 August 2024 | 25 MW from 5 August 2024, then 25 MW from 24 March 2026, then 49 MW from 1 July 2026 · not listed on every day between |
| Eneco Ville-Sur-Haine BESS | Eneco Ville-sur-Haine | 2 September 2024 | 50 MW · not listed on every day between |
| Estor-Lux _ Storage | EStor-Lux I | 23 October 2024 | 12 MW · not listed on every day between |
| Drogenbos Batteries | Drogenbos Batteries (Elia’s name) | 23 January 2025 | 7 MW · not listed on every day between |
| Vilvoorde BESS 1 | ENGIE Vilvoorde | 1 May 2025 | 100 MW · not listed on every day between |
| Vilvoorde BESS 2 | ENGIE Vilvoorde | 1 May 2025 | 100 MW · not listed on every day between |
| Harmignies Energy Storage BESS | Harmignies Energy Storage | 1 September 2025 | 75 MW from 1 September 2025, then 76 MW from 8 January 2026 · not listed on every day between |
| Nyrstar Belgium Balen BESS 1 | Nyrstar Balen | 1 November 2025 | 15 MW · not listed on every day between |
| Nyrstar Belgium Balen BESS 2 | Nyrstar Balen | 1 November 2025 | 10 MW · not listed on every day between |
| Luminus Storage Visé BESS | Navagne (Luminus Storage Visé) | 7 February 2026 | 150 MW · not listed on every day between |
| D-STOR La Louvière BESS 1 | D-STOR La Louvière | 11 February 2026 | 50 MW · not listed on every day between |
| Brecht E19 BESS | Brecht E19 | 13 March 2026 | 24 MW · not listed on every day between |
| Katoen Natie Bulk Terminal Kallo BESS 1 | Katoen Natie Kallo | 21 May 2026 | 5 MW |
| Katoen Natie Bulk Terminal Kallo BESS 2 | Katoen Natie Kallo | 22 May 2026 | 5 MW |
| Estor-Lux II Aubange BESS 1 | EStor-Lux II Aubange | 4 August 2026 | 100 MW |
The TotalEnergies Antwerp unit was listed in August 2024, dropped a month later and listed again from March 2026; it doubled to 49 MW at the end of June 2026, where TotalEnergies has announced 25 MW at Antwerp. We have asked Elia which battery the 49 MW covers.
ENGIE Vilvoorde made 1.3 full discharges a day over the last 30 days of ENTSO-E’s meter, the most of the three metered batteries
ENTSO-E, the European grid operators’ platform, publishes the metered output of every Belgian generating unit of 100 MW and more, hour by hour, and Belgium files its largest batteries there. Dividing the energy a battery put out by the energy it can hold gives the number of times it emptied itself, which is the plainest measure of how hard it is worked. The meter counts output only; ENTSO-E publishes no charging for a unit, so what each battery drew is not here.
Full discharges each month, one chart per battery, on one scale.
ENGIE Vilvoorde
200 MW · 800 MWh · first output 6 June 2025
Navagne (Luminus Storage Visé)
150 MW · 600 MWh · first output 27 February 2026
EStor-Lux II Aubange
100 MW · 270 MWh · first output 17 August 2026
Full discharges each month: the battery’s metered output that month divided by the capacity its owner states. A grey bar is a month the meter covers only in part, the battery’s first month or this one. ENTSO-E Transparency Platform, actual generation per generation unit (16.1.A), read 20 October 2026, to 16 October 2026; ENTSO-E publishes Belgian unit data a few days late. Every metered battery, month by month, with the table.
| Battery | MW | MWh | Full discharges a day, last 30 days | Days with output, last 30 | Highest output, MW | First output |
|---|---|---|---|---|---|---|
| ENGIE Vilvoorde | 200 | 800 | 1.3 | 30 of 30 | 200 | 6 Jun 2025 |
| Navagne (Luminus Storage Visé) | 150 | 600 | 0.1 | 7 of 30 | 100 | 27 Feb 2026 |
| EStor-Lux II Aubange | 100 | 270 | 1.2 | 26 of 30 | 100 | 17 Aug 2026 |
Navagne (Luminus Storage Visé) put out power on 7 of the last 30 days of the meter, and never more than 100 MW of its 150 MW, so its low figure is days without output, not light work on the days it ran; nothing published says why.
The metered batteries put out most at 20:00 and least at 03:00, Brussels time
The average output of the metered batteries together, hour by hour of the Brussels day, across every day ENTSO-E has published for each. A battery is paid for moving energy from the cheap hours to the dear ones, and for standing ready for Elia’s reserves, and this shape is what that looks like from the meter.
Average of every hour ENTSO-E published for 3 batteries, by hour of the Brussels day, in MW. Output only.
Belgium’s batteries put out 97 GWh in September 2026, from 13.4 GWh in January 2025
ENTSO-E also publishes the output of all Belgian storage together, hourly. Elia files it under energy storage, and the figure takes in every battery Elia meters, not only the three large ones. Pumped hydro at Coo and Plate-Taille is filed separately and is not in it.
ENTSO-E Transparency Platform, aggregated generation per type (16.1.B&C), Belgium, energy storage (B25), read 20 October 2026. The grey bar is this month so far. Output only.
The months as a table
| Month | GWh out |
|---|---|
| January 2025 | 13.4 |
| February 2025 | 12.3 |
| March 2025 | 15.6 |
| April 2025 | 14.1 |
| May 2025 | 12.9 |
| June 2025 | 12.4 |
| July 2025 | 11.5 |
| August 2025 | 18.3 |
| September 2025 | 26.9 |
| October 2025 | 45.7 |
| November 2025 | 56.0 |
| December 2025 | 48.8 |
| January 2026 | 59.3 |
| February 2026 | 52.1 |
| March 2026 | 68.1 |
| April 2026 | 76.0 |
| May 2026 | 74.6 |
| June 2026 | 84.3 |
| July 2026 | 80.2 |
| August 2026 | 88.4 |
| September 2026 | 97.0 |
| October 2026 | 57.6 |
Where the batteries are
One circle per named battery, sized by power. Yellow is scheduled by Elia or running; blue is being built; pale blue is announced; grey has no confirmed start.
35 of 35 batteries placed: 13 at the site itself, where OpenStreetMap has the battery mapped, the rest at the place their source names or the centre of their municipality, from GeoNames. By their owners’ figures, 830 MW scheduled or running, 1,720 MW being built, 649 MW announced or unconfirmed.
Open the Atlas, every battery on the map Every battery, one page each The metered batteries, month by month What changed, day by dayEvery battery Elia schedules, and the ones running beside it
As the owner, developer or builder states it; the date is the owner’s stated start. 5 of these are in Elia’s schedule with no release from the owner saying commercial operation has begun, and their status says so. Every figure’s source is on the battery’s page.
| Battery | Status | Owner | Municipality | MW | MWh | Started |
|---|---|---|---|---|---|---|
| ENGIE Vilvoorde | Operating | ENGIE (Electrabel) | Vilvoorde | 200 | 800 | 14 Nov 2025 |
| Navagne (Luminus Storage Visé) | Operating | Luminus (EDF group) with I4B | Visé | 150 | 600 | 1 Sep 2026 |
| EStor-Lux II Aubange | Energised, commissioning | BSTOR (75%), SOCOFE (15%), SOPAER (10%) | Aubange | 100 | 270 | Oct 2026 |
| Harmignies Energy Storage | In Elia’s schedule, start not announced | Energy Solutions Group | Mons | 75 | 300 | 2025 |
| Deux-Acren Energy Storage | Operating | Corsica Sole | Lessines | 50 | 100 | Dec 2022 |
| Eneco Ville-sur-Haine | Operating | Eneco | Le Roeulx | 50 | 200 | Oct 2024 |
| D-STOR La Louvière | Operating | BSTOR and Duferco Wallonie (50% each) | La Louvière | 50 | 140 | Mar 2026 |
| Ruien Energy Storage | Operating | Nippon Koei Energy Europe and Aquila Clean Energy | Kluisbergen | 25 | 100 | 7 Mar 2023 |
| TotalEnergies Antwerp refinery battery | In Elia’s schedule, start not announced | TotalEnergies | Antwerp | 25 | 75 | 2024 |
| Nyrstar Balen | In Elia’s schedule, start not announced | Nala Renewables | Balen | 25 | 100 | 2022 |
| Brecht E19 | Operating | Aspiravi | Brecht | 25 | 100 | Mar 2026 |
| Terhills | Operating | Centrica | Dilsen-Stokkem | 18 | · | Apr 2018 |
| EStor-Lux I | Operating | EStor-Lux consortium (SRIW, Ackermans & van Haaren, BEWATT, SOCOFE, SOFILUX) | Bastogne | 10 | 20 | Dec 2021 |
| Katoen Natie Kallo | In Elia’s schedule, start not announced | Katoen Natie | Beveren | 10 | · | · |
| EcoSourcen Deinze | Operating | EcoSourcen | Deinze | 10 | 55 | Apr 2026 |
| Drogenbos Batteries (Elia’s name) | In Elia’s schedule, start not announced | · | Drogenbos | 7 | · | · |
1,720 MW is being built, led by GIGA Storage’s 700 MW Green Turtle at Dilsen-Stokkem
The batteries being built would take the fleet to 2,548 MW if every one is finished. Their owners give dates from the start of 2027 to 2028, and battery projects in Belgium have run late before: Nala Renewables’ Balen battery was due at the end of 2022 and entered Elia’s list in November 2025.
| Battery | Owner | Municipality | MW | MWh | Expected |
|---|---|---|---|---|---|
| Green Turtle | GIGA Storage | Dilsen-Stokkem | 700 | 2,800 | Mar 2028 |
| Storm Ruien | Storm | Kluisbergen | 200 | 800 | 2027 |
| Project Volt (Garocentre) | Aukera Energy and Weerts Group | La Louvière | 170 | 340 | 2027 |
| ENGIE Kallo | ENGIE (Electrabel) | Beveren | 100 | 400 | 2027 |
| Storm Langerlo | Storm | Genk | 100 | 400 | 2027 |
| Ruien II | Nippon Koei Energy Europe (51%), Aspiravi (24.5%), Ecopower (19.6%), Beauvent (4.9%) | Kluisbergen | 100 | 250 | 2027 |
| ENGIE Drogenbos | ENGIE (Electrabel) | Drogenbos | 80 | 320 | 2027 |
| Auvelais Energy Storage | Energy Solutions Group | Sambreville | 76 | 304 | 2027 |
| ENGIE Coo | ENGIE (Electrabel) | Stoumont | 74 | 296 | 2028 |
| Gramme Storage 1 | Gramme Storage 1 | Huy | 50 | 100 | 2027 |
| HybriX Volta | HybriX Energy | Geel | 35 | 150 | 2027 |
| HybriX Franklin | HybriX Energy | Zandhoven | 35 | 150 | 2027 |
Announced, and not confirmed
Announced by their owners and not yet being built, or due to have started with no source saying they run.
| Battery | Status | Owner | Municipality | MW | MWh | Owner’s date |
|---|---|---|---|---|---|---|
| Blue Marlin | Announced | GIGA Storage | Kinrooi | 300 | 1,200 | 2030 |
| Luminus Ghent Ringvaart | Announced | Luminus (EDF group) | Ghent | 100 | 400 | 2026 |
| Storm Zeebrugge | Announced | Storm | Bruges | 100 | 400 | · |
| ENGIE Vilvoorde phase 3 | Announced | ENGIE (Electrabel) | Vilvoorde | 100 | 400 | · |
| TotalEnergies Feluy | Start not confirmed | TotalEnergies | Seneffe | 25 | 75 | 2025 |
| Centrica Ostend | Start not confirmed | Centrica Business Solutions | Ostend | 24 | 54 | 2024 |
| Hanzinelle | Announced | Etherr.a | Florennes | · | 48 | · |
The owners with the most scheduled or running
Who builds them
Tesla is named on 9 of the 35 batteries. A battery with two firms named counts for each.
| Builder, integrator or supplier named | Batteries | MW |
|---|---|---|
| Tesla | 9 | 1,319 |
| SPIE | 5 | 196 |
| Alfen | 3 | 94 |
| NHOA Energy | 2 | 180 |
| Wärtsilä | 2 | 75 |
| Saft | 2 | 50 |
| Sungrow | 1 | 200 |
| Luminus | 1 | 150 |
What is not here, and why
The batteries on the distribution grids, except the ones an owner has named, because Elia’s list holds only the units it schedules and no distribution company publishes a list battery by battery; Fluvius gives only totals. A meter on any battery below 100 MW, because ENTSO-E’s rules require it only above that size. What each battery draws when it charges, because the meter ENTSO-E publishes is output only. The winners of Elia’s capacity auctions battery by battery, because Elia’s auction reports may not be reproduced without its permission, which we asked for on 19 October 2026. A connection queue, because Elia publishes none battery by battery. Prices: the Belgian day-ahead price is on the European prices page. Nothing on this page is modelled, and a connection figure is never passed off as a battery’s size.
Sources: Elia Transmission Belgium open data, ods179, Elia Open Data Licence. ENTSO-E Transparency Platform, 16.1.A and 16.1.B&C, Belgium. The named batteries from be/hand/batteries.csv, kept by hand from owners’, developers’ and builders’ own releases and the trade press, every fact with its web address. Places from GeoNames (CC BY 4.0) and OpenStreetMap (ODbL).