Belgium · the batteries

Drogenbos Batteries (Elia’s name)

In Elia’s schedule, start not announced, 7 MW, in Drogenbos. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power7 MW
StatusIn Elia’s schedule, start not announced, as of 19 October 2026
MunicipalityDrogenbos, Flemish Brabant
Placed on the mapat the centre of Drogenbos, its municipality (GeoNames)

Who is behind it

No source read names who is behind it.

Not published anywhere we have found: owner, ultimate owner, developer, traded by, built by. The page says so rather than guessing.

In Elia’s list

Elia schedules this battery under the name below. Elia usually starts scheduling a battery when it begins testing, so the first day here is when it reached the grid, not when it began commercial operation.

Elia’s nameFirst listedLast listedPower, as Elia lists it
Drogenbos Batteries23 January 2025still listed7 MW from 23 January 2025

Elia Transmission Belgium, open data dataset ods179, Elia Open Data Licence.

What the sources say

Elia lists a 7 MW unit named Drogenbos Batteries from January 2025, and still lists it. Its owner is not named anywhere we have found. It is probably ENGIE’s 6 MW test battery of 2017 at its Drogenbos power station, but ENGIE said on 28 May 2026 that the old test battery is being removed to make room for its new 80 MW park on the site, so whether the Elia unit is that battery is unsettled.