Vitreous LabsEnergy transparency
Belgium · owners

Who owns Belgium’s batteries

25 owners across the 35 named batteries, as the owners themselves state it. Elia’s list names the battery and not its owner, so the owner on this page is always the owner’s own word or the trade press’s, with the source on the battery’s page.

ENGIE (Electrabel)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
ENGIE VilvoordeOperatingENGIE (Electrabel)Vilvoorde20080014 Nov 2025
ENGIE KalloBeing builtENGIE (Electrabel)Beveren1004002027
ENGIE Vilvoorde phase 3AnnouncedENGIE (Electrabel)Vilvoorde100400·
ENGIE DrogenbosBeing builtENGIE (Electrabel)Drogenbos803202027
ENGIE CooBeing builtENGIE (Electrabel)Stoumont742962028

Luminus (EDF group) with I4B

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Navagne (Luminus Storage Visé)OperatingLuminus (EDF group) with I4BVisé1506001 Sep 2026

BSTOR (75%), SOCOFE (15%), SOPAER (10%)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
EStor-Lux II AubangeEnergised, commissioningBSTOR (75%), SOCOFE (15%), SOPAER (10%)Aubange100270Oct 2026

Energy Solutions Group

Patronale Life (majority), as the sources state it.

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Auvelais Energy StorageBeing builtEnergy Solutions GroupSambreville763042027
Harmignies Energy StorageIn Elia’s schedule, start not announcedEnergy Solutions GroupMons753002025

Corsica Sole

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Deux-Acren Energy StorageOperatingCorsica SoleLessines50100Dec 2022

Eneco

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Eneco Ville-sur-HaineOperatingEnecoLe Roeulx50200Oct 2024

BSTOR and Duferco Wallonie (50% each)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
D-STOR La LouvièreOperatingBSTOR and Duferco Wallonie (50% each)La Louvière50140Mar 2026

TotalEnergies

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
TotalEnergies Antwerp refinery batteryIn Elia’s schedule, start not announcedTotalEnergiesAntwerp25752024
TotalEnergies FeluyStart not confirmedTotalEnergiesSeneffe25752025

Nippon Koei Energy Europe and Aquila Clean Energy

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Ruien Energy StorageOperatingNippon Koei Energy Europe and Aquila Clean EnergyKluisbergen251007 Mar 2023

Nala Renewables

Trafigura and IFM Investors (joint venture), as the sources state it.

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Nyrstar BalenIn Elia’s schedule, start not announcedNala RenewablesBalen251002022

Aspiravi

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Brecht E19OperatingAspiraviBrecht25100Mar 2026

Centrica

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
TerhillsOperatingCentricaDilsen-Stokkem18·Apr 2018

EStor-Lux consortium (SRIW, Ackermans & van Haaren, BEWATT, SOCOFE, SOFILUX)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
EStor-Lux IOperatingEStor-Lux consortium (SRIW, Ackermans & van Haaren, BEWATT, SOCOFE, SOFILUX)Bastogne1020Dec 2021

Katoen Natie

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Katoen Natie KalloIn Elia’s schedule, start not announcedKatoen NatieBeveren10··

EcoSourcen

financed by Patronale Life, as the sources state it.

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
EcoSourcen DeinzeOperatingEcoSourcenDeinze1055Apr 2026

Owner not stated

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Drogenbos Batteries (Elia’s name)In Elia’s schedule, start not announced·Drogenbos7··

GIGA Storage

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Green TurtleBeing builtGIGA StorageDilsen-Stokkem7002,800Mar 2028
Blue MarlinAnnouncedGIGA StorageKinrooi3001,2002030

Storm

with TINC, PMV and I4B, as the sources state it.

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Storm RuienBeing builtStormKluisbergen2008002027
Storm LangerloBeing builtStormGenk1004002027
Storm ZeebruggeAnnouncedStormBruges100400·

Aukera Energy and Weerts Group

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Project Volt (Garocentre)Being builtAukera Energy and Weerts GroupLa Louvière1703402027

Nippon Koei Energy Europe (51%), Aspiravi (24.5%), Ecopower (19.6%), Beauvent (4.9%)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Ruien IIBeing builtNippon Koei Energy Europe (51%), Aspiravi (24.5%), Ecopower (19.6%), Beauvent (4.9%)Kluisbergen1002502027

Luminus (EDF group)

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Luminus Ghent RingvaartAnnouncedLuminus (EDF group)Ghent1004002026

HybriX Energy

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
HybriX VoltaBeing builtHybriX EnergyGeel351502027
HybriX FranklinBeing builtHybriX EnergyZandhoven351502027

Gramme Storage 1

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Gramme Storage 1Being builtGramme Storage 1Huy501002027

Centrica Business Solutions

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
Centrica OstendStart not confirmedCentrica Business SolutionsOstend24542024

Etherr.a

BatteryStatusOwnerMunicipalityMWMWhOwner’s date
HanzinelleAnnouncedEtherr.aFlorennes·48·

Source: be/hand/batteries.csv, the owner column, each with its web address on the battery’s page.