Belgium · the batteries
ENGIE Drogenbos
Being built, 80 MW · 320 MWh, in Drogenbos, owned by ENGIE (Electrabel). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 80 MW |
| Capacity | 320 MWh |
| Duration | 4.0 hours |
| Status | Being built, as of 19 October 2026 |
| Owner’s date | 2027, expected in September 2027 |
| Municipality | Drogenbos, Flemish Brabant |
| Grid connection | high voltage |
| Placed on the map | at the site itself, as mapped on OpenStreetMap (ENGIE Energy Storage Park) |
Who is behind it
| Owner | ENGIE (Electrabel) |
| Built by | NHOA Energy (88 containers) |
Not published anywhere we have found: ultimate owner, developer, traded by. The page says so rather than guessing.
Not in Elia’s list
Elia does not schedule this battery, because it is not yet running.
What the sources say
Not the old test battery at Drogenbos, which ENGIE says is being removed to make room for this one.
Evidence and sources
- owner: ess-news.com/2026/05/28/engie-and-nhoa-energy-begin-construc…
- position: openstreetmap.org/way/1491101734
From the owners’, developers’ and builders’ own releases and the trade press, read by Vitreous, joined to Elia’s list by name. This page carries no money: no Belgian body publishes what a named battery earns. List id BE-B24.