Belgium · the batteries
Luminus Ghent Ringvaart
Announced, 100 MW · 400 MWh, in Ghent, owned by Luminus (EDF group). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 100 MW |
| Capacity | 400 MWh |
| Duration | 4.0 hours |
| Status | Announced, as of 19 October 2026 |
| Owner’s date | 2026, expected by the owner by the end of 2026 (said in 2024) |
| Municipality | Ghent, East Flanders |
| Placed on the map | at Ghent, the place its source names (GeoNames) |
Who is behind it
| Owner | Luminus (EDF group) |
Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.
Not in Elia’s list
Elia does not schedule this battery, because it is not yet running.
What the sources say
No start of construction found.
Evidence and sources
- owner: luminus.be/-/media/general/documents/corporate/csr-documen…
- size: newmobility.news/en/2024/07/15/luminus-to-build-large-battery-pa…
From the owners’, developers’ and builders’ own releases and the trade press, read by Vitreous, joined to Elia’s list by name. This page carries no money: no Belgian body publishes what a named battery earns. List id BE-B31.