Start not confirmed, 25 MW · 75 MWh, in Seneffe, owned by TotalEnergies. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power25 MW
Capacity75 MWh
Duration3.0 hours
StatusStart not confirmed, as of 19 October 2026
Owner’s date2025, expected by the owner by the end of 2025
MunicipalitySeneffe, Feluy, Hainaut
Placed on the mapat Feluy, the place its source names, in Seneffe (GeoNames)

Who is behind it

OwnerTotalEnergies
Built bySaft (40 Intensium Max HE containers)

Not published anywhere we have found: ultimate owner, developer, traded by. The page says so rather than guessing.

Not in Elia’s list

Elia does not schedule this battery, and no source says why.

What the sources say

At TotalEnergies’ Feluy depot. Not in Elia’s list under its own name and no source found saying it runs; see the Antwerp battery for why it may be inside Elia’s 49 MW Antwerp entry.