Operating, 25 MW · 100 MWh, in Kluisbergen, owned by Nippon Koei Energy Europe and Aquila Clean Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power25 MW
Capacity100 MWh
Duration4.0 hours
StatusOperating, as of 19 October 2026
Owner’s date7 March 2023, actual
MunicipalityKluisbergen, Ruien, East Flanders
Grid connectionElia, Ruien 150 kV
Placed on the mapat the site itself, as mapped on OpenStreetMap (Batterijpark Ruien Energy Storage)

Who is behind it

OwnerNippon Koei Energy Europe and Aquila Clean Energy
DeveloperYuso
Traded byYuso
Built byWärtsilä; SPIE (installation)

Not published anywhere we have found: ultimate owner. The page says so rather than guessing.

In Elia’s list

Elia schedules this battery under the name below. Elia usually starts scheduling a battery when it begins testing, so the first day here is when it reached the grid, not when it began commercial operation.

Elia’s nameFirst listedLast listedPower, as Elia lists it
Ruien Energy Storage22 May 2024still listed25 MW from 22 May 2024

Elia Transmission Belgium, open data dataset ods179, Elia Open Data Licence.

What the sources say

Yuso started and co-developed the project and optimises it for ten years; Nippon Koei Energy Europe and Aquila financed it jointly. Elia lists 25.1 MW. Not the same battery as Storm’s 200 MW project or the 100 MW Ruien II project, both being built at the same former power station site.