Belgium · the batteries
Project Volt (Garocentre)
Being built, 170 MW · 340 MWh, in La Louvière, owned by Aukera Energy and Weerts Group. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 170 MW |
| Capacity | 340 MWh |
| Duration | 2.0 hours |
| Status | Being built, as of 19 October 2026 |
| Owner’s date | 2027, expected in mid 2027 |
| Municipality | La Louvière, Garocentre, Hainaut |
| Placed on the map | at the centre of La Louvière, its municipality (GeoNames) |
Who is behind it
| Owner | Aukera Energy and Weerts Group |
Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.
Not in Elia’s list
Elia does not schedule this battery, because it is not yet running.
What the sources say
Financing closed on 29 May 2026. Not the D-STOR battery, also at La Louvière.
Evidence and sources
From the owners’, developers’ and builders’ own releases and the trade press, read by Vitreous, joined to Elia’s list by name. This page carries no money: no Belgian body publishes what a named battery earns. List id BE-B20.