Being built, 170 MW · 340 MWh, in La Louvière, owned by Aukera Energy and Weerts Group. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power170 MW
Capacity340 MWh
Duration2.0 hours
StatusBeing built, as of 19 October 2026
Owner’s date2027, expected in mid 2027
MunicipalityLa Louvière, Garocentre, Hainaut
Placed on the mapat the centre of La Louvière, its municipality (GeoNames)

Who is behind it

OwnerAukera Energy and Weerts Group

Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.

Not in Elia’s list

Elia does not schedule this battery, because it is not yet running.

What the sources say

Financing closed on 29 May 2026. Not the D-STOR battery, also at La Louvière.