Vitreous LabsEnergy transparency
Denmark · the change ledger

Since 1 June 2024: 485 other changes.

No Danish body publishes a list of batteries, so the list this site keeps by hand from owners’ releases and municipal permits is copied whenever it changes, and the difference between one copy and the one before is printed, battery by battery. Beneath it, Energinet’s capacity map: every transmission station whose room for new production moved from one band to another between Energinet’s publications. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.

16captures held across 2 lists, the oldest from 1 June 2024
0batteries entered a list, 0 MW
0left a list
485other changes that moved something; 0 more were respellings or refilings

By month

MonthEnteredMW enteredLeftOther changesRespelt or refiled
February 20260·050·
December 20250·037·
November 20250·029·
September 20250·041·
July 20250·034·
June 20250·024·
May 20250·042·
March 20250·051·
February 20250·052·
January 20250·09·
December 20240·017·
November 20240·026·
October 20240·021·
September 20240·052·

Where this can be wrong

The list is kept by hand, so a battery enters it when a source is found, which can be long after the battery started; the date of a change here is the date the list changed, never the date the battery did. On 25 October 2026 three rows of the first list, each a group of sites, were split into their sites, so they show as gone and the sites as new. The capacity map is Energinet’s recalculation, published about monthly; its first publication held is a baseline.

The whole ledger as a CSV.

The list of batteries their owners and permits name

A battery enters when a source first names it and leaves only if a source says it was dropped or a row is split into its sites; a change of status is the owner’s or a permit’s word, read from a later document. The list is kept by hand, so a copy is taken whenever it changes. 1 capture held, 25 October 2026 to 25 October 2026.

One capture so far. The next read starts this ledger.

Energinet’s capacity map, transmission stations

Energinet republishes its map of the room for new production at each transmission station about monthly. A station appears here when its room moves from one band to another (nought, under 100, 100 to 249, 250 to 499, 500 to 999, 1,000 MW and more) on the grid as it is; the MW column is the newer figure. Only the 140 stations in every publication are compared, so a station joining or leaving the map is not counted. Energinet says the values are indicative and cannot be added up. 15 captures held, 1 June 2024 to 1 February 2026.

1 February 2026, against 1 December 2025

50 changes.

BatteryWhat changedFromToMWOur reading
Stovstrup
STSV150
room for new production0 MW500 to 999 MW813changed
Kyndbyværket
KYV_132
room for new production250 to 499 MW500 to 999 MW609changed
Idomlund
IDU_150
room for new production100 to 249 MW500 to 999 MW580changed
Bramdrup
BDR_150
room for new production500 to 999 MW250 to 499 MW488changed
Videbæk
VID_150
room for new production1 to 99 MW250 to 499 MW467changed
Landerupgård
LAG_150
room for new production100 to 249 MW250 to 499 MW437changed
Gørløse
GØR_132
room for new production100 to 249 MW250 to 499 MW359changed
Allerødgård
ALL_132
room for new production100 to 249 MW250 to 499 MW357changed
Torslunde
TOR_132
room for new production100 to 249 MW250 to 499 MW330changed
Ølstykkegård
ØLS_132
room for new production500 to 999 MW250 to 499 MW313changed
Ribe
RIB_150
room for new production500 to 999 MW250 to 499 MW299changed
Andst
AND_150
room for new production500 to 999 MW250 to 499 MW272changed
Skærbækværket
SVS_150
room for new production100 to 249 MW250 to 499 MW259changed
Sperrestrupgård
SPR_132
room for new production100 to 249 MW250 to 499 MW254changed
Mosbæk
MOSV150
room for new production100 to 249 MW250 to 499 MW251changed
Blangslev
BLA_132
room for new production250 to 499 MW100 to 249 MW246changed
Aalborg Øst
ÅBØ_150
room for new production250 to 499 MW100 to 249 MW230changed
Engbjerg
ENB_150
room for new production1 to 99 MW100 to 249 MW208changed
Lem Kær
LKR_150
room for new production1 to 99 MW100 to 249 MW195changed
Søndervig
SVGV150
room for new production1 to 99 MW100 to 249 MW193changed
Lyngerup
LUP_132
room for new production1 to 99 MW100 to 249 MW191changed
Hvorupgård
HVO_150
room for new production250 to 499 MW100 to 249 MW182changed
Hovegård
HVE_132
room for new production1 to 99 MW100 to 249 MW172changed
Tange
TAN_150
room for new production250 to 499 MW100 to 249 MW170changed
Sønderborg
SØN_150
room for new production250 to 499 MW100 to 249 MW130changed
Grønnegård
GRN_132
room for new production1 to 99 MW100 to 249 MW118changed
Herstedgård
HSTØ132
room for new production1 to 99 MW100 to 249 MW114changed
Ringsted
RIN_132
room for new production100 to 249 MW1 to 99 MW96changed
Nors
NOR_150
room for new production100 to 249 MW1 to 99 MW95changed
Orehoved
ORH_132
room for new production100 to 249 MW1 to 99 MW95changed
Flaskegård
FLA_132
room for new production100 to 249 MW1 to 99 MW92changed
Ishøj
ISH_132
room for new production100 to 249 MW1 to 99 MW92changed
Høskov
HSKV150
room for new production100 to 249 MW1 to 99 MW86changed
Åstrup
ÅSP_150
room for new production100 to 249 MW1 to 99 MW86changed
Herlufmagle
HMA_132
room for new production100 to 249 MW1 to 99 MW85changed
Hørning
HØN_150
room for new production100 to 249 MW1 to 99 MW76changed
Kamstrup
KAM_132
room for new production100 to 249 MW1 to 99 MW72changed
Nibstrup
NSP_150
room for new production100 to 249 MW1 to 99 MW70changed
Fraugde
FGD_150
room for new production100 to 249 MW1 to 99 MW69changed
Bredkær
BDK_150
room for new production100 to 249 MW1 to 99 MW68changed
Fraugde Vest
FGV_150
room for new production100 to 249 MW1 to 99 MW60changed
Fynsværket
FVO_150
room for new production100 to 249 MW1 to 99 MW60changed
Svendborg
SVB_150
room for new production100 to 249 MW1 to 99 MW60changed
Abildskov
ABS_150
room for new production100 to 249 MW1 to 99 MW59changed
Odense SØ
OSØ_150
room for new production100 to 249 MW1 to 99 MW56changed
Jersie
JER_132
room for new production100 to 249 MW1 to 99 MW54changed
Malling
MAL_150
room for new production250 to 499 MW1 to 99 MW42changed
Hatting
HAT_150
room for new production100 to 249 MW1 to 99 MW16changed
Herning Syd Vest
HESV150
room for new production0 MW1 to 99 MW3changed
Sdr Felding
SFE_150
room for new production0 MW1 to 99 MW2changed

1 December 2025, against 1 November 2025

37 changes.

BatteryWhat changedFromToMWOur reading
Næstved
NSV_132
room for new production250 to 499 MW500 to 999 MW523changed
Karlsgårde
KAE_150
room for new production500 to 999 MW250 to 499 MW418changed
Søstremose
SOS_132
room for new production100 to 249 MW250 to 499 MW336changed
Vestlolland
VLO_132
room for new production100 to 249 MW250 to 499 MW276changed
Hvorupgård
HVO_150
room for new production100 to 249 MW250 to 499 MW257changed
Blangslev
BLA_132
room for new production100 to 249 MW250 to 499 MW255changed
Landerupgård
LAG_150
room for new production250 to 499 MW100 to 249 MW248changed
Vendsysselværket
NVV_150
room for new production250 to 499 MW100 to 249 MW243changed
Rødby
RBY_132
room for new production1 to 99 MW100 to 249 MW242changed
Stasevang
STA_132
room for new production250 to 499 MW100 to 249 MW241changed
Radsted
RAD_132
room for new production1 to 99 MW100 to 249 MW238changed
Hasle
HASV150
room for new production250 to 499 MW100 to 249 MW237changed
Mosbæk
MOSV150
room for new production250 to 499 MW100 to 249 MW224changed
Foulum
FOU_150
room for new production250 to 499 MW100 to 249 MW222changed
Torslunde
TOR_132
room for new production250 to 499 MW100 to 249 MW203changed
Gloslunde
GLL_132--$
room for new production1 to 99 MW100 to 249 MW199changed
Kamstrup
KAM_132
room for new production250 to 499 MW100 to 249 MW177changed
Eskilstrup
ESK_132
room for new production1 to 99 MW100 to 249 MW154changed
Femern
FEM_132
room for new production1 to 99 MW100 to 249 MW154changed
Fynsværket
FVO_150
room for new production1 to 99 MW100 to 249 MW152changed
Fraugde Vest
FGV_150
room for new production1 to 99 MW100 to 249 MW131changed
Odense SØ
OSØ_150
room for new production1 to 99 MW100 to 249 MW128changed
Svendborg
SVB_150
room for new production1 to 99 MW100 to 249 MW125changed
Sindbjerg
SIN_150
room for new production1 to 99 MW100 to 249 MW116changed
Orehoved
ORH_132
room for new production1 to 99 MW100 to 249 MW108changed
Roslev
RSL_150
room for new production1 to 99 MW100 to 249 MW106changed
Vindingegård
VIN_132
room for new production100 to 249 MW1 to 99 MW85changed
Kirkeskovgård
KSV_132
room for new production100 to 249 MW1 to 99 MW84changed
Hedegård
HDE_132
room for new production100 to 249 MW1 to 99 MW77changed
Grønnegård
GRN_132
room for new production100 to 249 MW1 to 99 MW73changed
Lindevang
LIN_132
room for new production100 to 249 MW1 to 99 MW68changed
Ostedgård
OST_132
room for new production100 to 249 MW1 to 99 MW53changed
Hovegård
HVE_132
room for new production100 to 249 MW1 to 99 MW43changed
Lyngerup
LUP_132
room for new production100 to 249 MW1 to 99 MW38changed
Herning Syd Vest
HESV150
room for new production1 to 99 MW0 MW0changed
Sdr Felding
SFE_150
room for new production1 to 99 MW0 MW0changed
Stovstrup
STSV150
room for new production1 to 99 MW0 MW0changed

1 November 2025, against 1 September 2025

29 changes.

BatteryWhat changedFromToMWOur reading
Spanager
SPA_132
room for new production500 to 999 MW1,000 MW and more1,080changed
Rislev
RIL_132
room for new production250 to 499 MW500 to 999 MW693changed
Masnedøværket
MAV_132
room for new production250 to 499 MW500 to 999 MW608changed
Karlsgårde
KAE_150
room for new production250 to 499 MW500 to 999 MW533changed
Kyndbyværket
KYV_132
room for new production100 to 249 MW250 to 499 MW378changed
Torslunde
TOR_132
room for new production500 to 999 MW250 to 499 MW317changed
Stasevang
STA_132
room for new production100 to 249 MW250 to 499 MW294changed
Mosbæk
MOSV150
room for new production100 to 249 MW250 to 499 MW284changed
Nyrup
NYR_132
room for new production250 to 499 MW100 to 249 MW236changed
Blangslev
BLA_132
room for new production250 to 499 MW100 to 249 MW225changed
Ejbygård
EBY_132
room for new production250 to 499 MW100 to 249 MW194changed
Kirkeskovgård
KSV_132
room for new production250 to 499 MW100 to 249 MW176changed
Gørløse
GØR_132
room for new production1 to 99 MW100 to 249 MW161changed
Bagsværdgård
BAG_132
room for new production250 to 499 MW100 to 249 MW149changed
Dyregård
DYR_132
room for new production250 to 499 MW100 to 249 MW145changed
Vindingegård
VIN_132
room for new production250 to 499 MW100 to 249 MW118changed
Søstremose
SOS_132
room for new production250 to 499 MW100 to 249 MW115changed
Flaskegård
FLA_132
room for new production1 to 99 MW100 to 249 MW109changed
Lindevang
LIN_132
room for new production1 to 99 MW100 to 249 MW107changed
Radsted
RAD_132
room for new production100 to 249 MW1 to 99 MW96changed
Knabberup
KNA_150
room for new production100 to 249 MW1 to 99 MW95changed
Fynsværket
FVO_150
room for new production100 to 249 MW1 to 99 MW88changed
Herstedgård
HSTØ132
room for new production100 to 249 MW1 to 99 MW87changed
Gloslunde
GLL_132--$
room for new production100 to 249 MW1 to 99 MW79changed
Eskilstrup
ESK_132
room for new production100 to 249 MW1 to 99 MW67changed
Femern
FEM_132
room for new production100 to 249 MW1 to 99 MW60changed
Rødby
RBY_132
room for new production100 to 249 MW1 to 99 MW55changed
Vejleå
VEJ_132
room for new production100 to 249 MW1 to 99 MW48changed
Ballerupgård
BAL_132
room for new production100 to 249 MW1 to 99 MW44changed

1 September 2025, against 1 July 2025

41 changes.

BatteryWhat changedFromToMWOur reading
Kassø
KAS_150
room for new production250 to 499 MW500 to 999 MW895changed
Lykkegård
LYK_150
room for new production250 to 499 MW500 to 999 MW618changed
Bramdrup
BDR_150
room for new production100 to 249 MW500 to 999 MW545changed
Torslunde
TOR_132
room for new production250 to 499 MW500 to 999 MW510changed
Rislev
RIL_132
room for new production500 to 999 MW250 to 499 MW483changed
Ådalen
ADL_150
room for new production100 to 249 MW250 to 499 MW391changed
Vordingborg Nord
VONØ132
room for new production100 to 249 MW250 to 499 MW336changed
Bredebro
BBR_150
room for new production100 to 249 MW250 to 499 MW330changed
Nyrup
NYR_132
room for new production100 to 249 MW250 to 499 MW324changed
Landerupgård
LAG_150
room for new production100 to 249 MW250 to 499 MW288changed
Søstremose
SOS_132
room for new production100 to 249 MW250 to 499 MW268changed
Sønderborg
SØN_150
room for new production100 to 249 MW250 to 499 MW268changed
Vindingegård
VIN_132
room for new production100 to 249 MW250 to 499 MW266changed
Foulum
FOU_150
room for new production100 to 249 MW250 to 499 MW261changed
Bagsværdgård
BAG_132
room for new production100 to 249 MW250 to 499 MW250changed
Kyndbyværket
KYV_132
room for new production250 to 499 MW100 to 249 MW245changed
Lyngerup
LUP_132
room for new production250 to 499 MW100 to 249 MW242changed
Hatting
HAT_150
room for new production250 to 499 MW100 to 249 MW211changed
Nibstrup
NSP_150
room for new production1 to 99 MW100 to 249 MW125changed
Nors
NOR_150
room for new production1 to 99 MW100 to 249 MW120changed
Fraugde
FGD_150
room for new production1 to 99 MW100 to 249 MW118changed
Frøstrup
FRT_150
room for new production1 to 99 MW100 to 249 MW117changed
Abildskov
ABS_150
room for new production1 to 99 MW100 to 249 MW115changed
Åstrup
ÅSP_150
room for new production1 to 99 MW100 to 249 MW113changed
Fynsværket
FVO_150
room for new production1 to 99 MW100 to 249 MW105changed
Idomlund
IDU_150
room for new production1 to 99 MW100 to 249 MW103changed
Bedsted
BED_150
room for new production1 to 99 MW100 to 249 MW101changed
Bilstrup
BIL_150
room for new production1 to 99 MW100 to 249 MW101changed
Flaskegård
FLA_132
room for new production100 to 249 MW1 to 99 MW99changed
Gørløse
GØR_132
room for new production100 to 249 MW1 to 99 MW88changed
Mosedegård
MOSØ132
room for new production100 to 249 MW1 to 99 MW86changed
Orehoved
ORH_132
room for new production100 to 249 MW1 to 99 MW83changed
Lindevang
LIN_132
room for new production100 to 249 MW1 to 99 MW61changed
Amagerværket
AMV_132
room for new production100 to 249 MW1 to 99 MW48changed
Glentegård
GLN_132
room for new production100 to 249 MW1 to 99 MW48changed
Svanemølle kbst.
SMK_132
room for new production100 to 249 MW1 to 99 MW48changed
Bellahøj kbst
BEL_132
room for new production100 to 249 MW1 to 99 MW47changed
Vigerslev kbst
VIK_132
room for new production100 to 249 MW1 to 99 MW44changed
Herning Syd Vest
HESV150
room for new production0 MW1 to 99 MW2changed
Stovstrup
STSV150
room for new production0 MW1 to 99 MW2changed
Sdr Felding
SFE_150
room for new production0 MW1 to 99 MW1changed

1 July 2025, against 1 June 2025

34 changes.

BatteryWhat changedFromToMWOur reading
Holsted
HOD_150
room for new production250 to 499 MW500 to 999 MW704changed
Andst
AND_150
room for new production250 to 499 MW500 to 999 MW693changed
Ribe
RIB_150
room for new production250 to 499 MW500 to 999 MW628changed
Torslunde
TOR_132
room for new production500 to 999 MW250 to 499 MW493changed
Masnedøværket
MAV_132
room for new production500 to 999 MW250 to 499 MW454changed
Lykkegård
LYK_150
room for new production1,000 MW and more250 to 499 MW451changed
Kassø
KAS_150
room for new production500 to 999 MW250 to 499 MW424changed
Karlsgårde
KAE_150
room for new production1,000 MW and more250 to 499 MW413changed
Tårup Nord
TUP_150
room for new production100 to 249 MW250 to 499 MW400changed
Ryttergård
RYT_150
room for new production100 to 249 MW250 to 499 MW355changed
Hatting
HAT_150
room for new production100 to 249 MW250 to 499 MW300changed
Foulum
FOU_150
room for new production250 to 499 MW100 to 249 MW247changed
Ådalen
ADL_150
room for new production250 to 499 MW100 to 249 MW242changed
Hovegård
HVE_132
room for new production250 to 499 MW100 to 249 MW242changed
Bredebro
BBR_150
room for new production250 to 499 MW100 to 249 MW231changed
Vordingborg Nord
VONØ132
room for new production250 to 499 MW100 to 249 MW215changed
Endrup
EDR_150
room for new production250 to 499 MW100 to 249 MW203changed
Bramdrup
BDR_150
room for new production500 to 999 MW100 to 249 MW182changed
Knabberup
KNA_150
room for new production1 to 99 MW100 to 249 MW139changed
Glentegård
GLN_132
room for new production1 to 99 MW100 to 249 MW127changed
Bellahøj kbst
BEL_132
room for new production1 to 99 MW100 to 249 MW122changed
Allerødgård
ALL_132
room for new production1 to 99 MW100 to 249 MW121changed
Gørløse
GØR_132
room for new production1 to 99 MW100 to 249 MW116changed
Amagerværket
AMV_132
room for new production1 to 99 MW100 to 249 MW110changed
Vigerslev kbst
VIK_132
room for new production1 to 99 MW100 to 249 MW103changed
Mosedegård
MOSØ132
room for new production1 to 99 MW100 to 249 MW102changed
Nors
NOR_150
room for new production100 to 249 MW1 to 99 MW96changed
Frøstrup
FRT_150
room for new production100 to 249 MW1 to 99 MW94changed
Bedsted
BED_150
room for new production100 to 249 MW1 to 99 MW40changed
Bilstrup
BIL_150
room for new production100 to 249 MW1 to 99 MW38changed
Idomlund
IDU_150
room for new production100 to 249 MW1 to 99 MW36changed
Herning Syd Vest
HESV150
room for new production1 to 99 MW0 MW0changed
Sdr Felding
SFE_150
room for new production1 to 99 MW0 MW0changed
Stovstrup
STSV150
room for new production1 to 99 MW0 MW0changed

1 June 2025, against 1 May 2025

24 changes.

BatteryWhat changedFromToMWOur reading
Ølstykkegård
ØLS_132
room for new production250 to 499 MW500 to 999 MW577changed
Lyngerup
LUP_132
room for new production100 to 249 MW250 to 499 MW306changed
Hovegård
HVE_132
room for new production100 to 249 MW250 to 499 MW285changed
Stigsnæsværket
STV_132
room for new production250 to 499 MW100 to 249 MW249changed
Tårup Nord
TUP_150
room for new production250 to 499 MW100 to 249 MW248changed
Søstremose
SOS_132
room for new production250 to 499 MW100 to 249 MW245changed
Ryttergård
RYT_150
room for new production250 to 499 MW100 to 249 MW236changed
Vestlolland
VLO_132
room for new production250 to 499 MW100 to 249 MW236changed
Mosbæk
MOSV150
room for new production250 to 499 MW100 to 249 MW200changed
Sperrestrupgård
SPR_132
room for new production250 to 499 MW100 to 249 MW156changed
Stasevang
STA_132
room for new production500 to 999 MW100 to 249 MW142changed
Ballerupgård
BAL_132
room for new production1 to 99 MW100 to 249 MW107changed
Herstedgård
HSTØ132
room for new production1 to 99 MW100 to 249 MW105changed
Åstrup
ÅSP_150
room for new production100 to 249 MW1 to 99 MW99changed
Sindbjerg
SIN_150
room for new production100 to 249 MW1 to 99 MW95changed
Allerødgård
ALL_132
room for new production250 to 499 MW1 to 99 MW94changed
Glentegård
GLN_132
room for new production100 to 249 MW1 to 99 MW93changed
Videbæk
VID_150
room for new production100 to 249 MW1 to 99 MW91changed
Roslev
RSL_150
room for new production100 to 249 MW1 to 99 MW87changed
Amagerværket
AMV_132
room for new production100 to 249 MW1 to 99 MW86changed
H. C. Ørsted Værket
HCV_132
room for new production100 to 249 MW1 to 99 MW86changed
Vigerslev kbst
VIK_132
room for new production100 to 249 MW1 to 99 MW85changed
Bellahøj kbst
BEL_132
room for new production100 to 249 MW1 to 99 MW84changed
Gørløse
GØR_132
room for new production250 to 499 MW1 to 99 MW84changed

1 May 2025, against 1 March 2025

42 changes.

BatteryWhat changedFromToMWOur reading
Lykkegård
LYK_150
room for new production500 to 999 MW1,000 MW and more1,127changed
Karlsgårde
KAE_150
room for new production500 to 999 MW1,000 MW and more1,099changed
Spanager
SPA_132
room for new production1,000 MW and more500 to 999 MW948changed
Kassø
KAS_150
room for new production250 to 499 MW500 to 999 MW816changed
Bramdrup
BDR_150
room for new production250 to 499 MW500 to 999 MW582changed
Masnedøværket
MAV_132
room for new production250 to 499 MW500 to 999 MW545changed
Torslunde
TOR_132
room for new production250 to 499 MW500 to 999 MW514changed
Ribe
RIB_150
room for new production100 to 249 MW250 to 499 MW471changed
Hejninge
HEJ_132
room for new production100 to 249 MW250 to 499 MW412changed
Ensted
SHE_150
room for new production100 to 249 MW250 to 499 MW411changed
Aalborg Øst
ÅBØ_150
room for new production100 to 249 MW250 to 499 MW372changed
Vordingborg Nord
VONØ132
room for new production100 to 249 MW250 to 499 MW371changed
Bredebro
BBR_150
room for new production100 to 249 MW250 to 499 MW353changed
Dyregård
DYR_132
room for new production100 to 249 MW250 to 499 MW345changed
Teglstrupgård
TEG_132
room for new production500 to 999 MW250 to 499 MW342changed
Ølstykkegård
ØLS_132
room for new production100 to 249 MW250 to 499 MW333changed
Ejbygård
EBY_132
room for new production100 to 249 MW250 to 499 MW328changed
Kirkeskovgård
KSV_132
room for new production100 to 249 MW250 to 499 MW322changed
Tårup Nord
TUP_150
room for new production100 to 249 MW250 to 499 MW281changed
Kyndbyværket
KYV_132
room for new production1 to 99 MW250 to 499 MW266changed
Ryttergård
RYT_150
room for new production100 to 249 MW250 to 499 MW264changed
Andst
AND_150
room for new production100 to 249 MW250 to 499 MW259changed
Sperrestrupgård
SPR_132
room for new production100 to 249 MW250 to 499 MW252changed
Vestlolland
VLO_132
room for new production100 to 249 MW250 to 499 MW250changed
Lyngerup
LUP_132
room for new production1 to 99 MW100 to 249 MW248changed
Rødby
RBY_132
room for new production1 to 99 MW100 to 249 MW231changed
Nyrup
NYR_132
room for new production250 to 499 MW100 to 249 MW197changed
Gloslunde
GLL_132--$
room for new production1 to 99 MW100 to 249 MW166changed
Eskilstrup
ESK_132
room for new production1 to 99 MW100 to 249 MW159changed
Lindevang
LIN_132
room for new production1 to 99 MW100 to 249 MW151changed
Jersie
JER_132
room for new production250 to 499 MW100 to 249 MW147changed
Svanemølle kbst.
SMK_132
room for new production1 to 99 MW100 to 249 MW136changed
H. C. Ørsted Værket
HCV_132
room for new production1 to 99 MW100 to 249 MW130changed
Femern
FEM_132
room for new production1 to 99 MW100 to 249 MW124changed
Vigerslev kbst
VIK_132
room for new production1 to 99 MW100 to 249 MW121changed
Bellahøj kbst
BEL_132
room for new production1 to 99 MW100 to 249 MW118changed
Amagerværket
AMV_132
room for new production1 to 99 MW100 to 249 MW109changed
Nibstrup
NSP_150
room for new production100 to 249 MW1 to 99 MW96changed
Mosedegård
MOSØ132
room for new production100 to 249 MW1 to 99 MW88changed
Vilsted
VIL_150
room for new production100 to 249 MW1 to 99 MW88changed
Herstedgård
HSTØ132
room for new production100 to 249 MW1 to 99 MW76changed
Stovstrup
STSV150
room for new production100 to 249 MW1 to 99 MW30changed

1 March 2025, against 1 February 2025

51 changes.

BatteryWhat changedFromToMWOur reading
Spanager
SPA_132
room for new production250 to 499 MW1,000 MW and more1,043changed
Teglstrupgård
TEG_132
room for new production100 to 249 MW500 to 999 MW758changed
Haslev Øst
HØT_132
room for new production250 to 499 MW500 to 999 MW708changed
Karlsgårde
KAE_150
room for new production1,000 MW and more500 to 999 MW628changed
Rislev
RIL_132
room for new production250 to 499 MW500 to 999 MW615changed
Jersie
JER_132
room for new production100 to 249 MW250 to 499 MW426changed
Kamstrup
KAM_132
room for new production100 to 249 MW250 to 499 MW347changed
Vendsysselværket
NVV_150
room for new production100 to 249 MW250 to 499 MW344changed
Stigsnæsværket
STV_132
room for new production100 to 249 MW250 to 499 MW344changed
Kassø
KAS_150
room for new production1,000 MW and more250 to 499 MW334changed
Tange
TAN_150
room for new production100 to 249 MW250 to 499 MW317changed
Mosbæk
MOSV150
room for new production100 to 249 MW250 to 499 MW312changed
Ådalen
ADL_150
room for new production100 to 249 MW250 to 499 MW291changed
Torslunde
TOR_132
room for new production100 to 249 MW250 to 499 MW274changed
Ferslev
FER_150
room for new production100 to 249 MW250 to 499 MW253changed
Søstremose
SOS_132
room for new production100 to 249 MW250 to 499 MW250changed
Dyregård
DYR_132
room for new production250 to 499 MW100 to 249 MW242changed
Ensted
SHE_150
room for new production250 to 499 MW100 to 249 MW205changed
Hatting
HAT_150
room for new production250 to 499 MW100 to 249 MW204changed
Kirkeskovgård
KSV_132
room for new production250 to 499 MW100 to 249 MW200changed
Moselund
MLU_150
room for new production1 to 99 MW100 to 249 MW200changed
Klim Fjordholme
KLF_150
room for new production1 to 99 MW100 to 249 MW190changed
Tårup Nord
TUP_150
room for new production500 to 999 MW100 to 249 MW182changed
Frøstrup
FRT_150
room for new production1 to 99 MW100 to 249 MW173changed
Videbæk
VID_150
room for new production250 to 499 MW100 to 249 MW172changed
Hedegård
HDE_132
room for new production1 to 99 MW100 to 249 MW151changed
Ryttergård
RYT_150
room for new production250 to 499 MW100 to 249 MW143changed
Landerupgård
LAG_150
room for new production250 to 499 MW100 to 249 MW139changed
Radsted
RAD_132
room for new production1 to 99 MW100 to 249 MW137changed
Bredebro
BBR_150
room for new production250 to 499 MW100 to 249 MW133changed
Sønderborg
SØN_150
room for new production250 to 499 MW100 to 249 MW123changed
Ribe
RIB_150
room for new production250 to 499 MW100 to 249 MW121changed
Vilsted
VIL_150
room for new production1 to 99 MW100 to 249 MW118changed
Skærbækværket
SVS_150
room for new production250 to 499 MW100 to 249 MW109changed
Magstrup
MAG_150
room for new production250 to 499 MW100 to 249 MW107changed
Orehoved
ORH_132
room for new production1 to 99 MW100 to 249 MW106changed
Andst
AND_150
room for new production250 to 499 MW100 to 249 MW104changed
Vordingborg Nord
VONØ132
room for new production1 to 99 MW100 to 249 MW102changed
Kyndbyværket
KYV_132
room for new production250 to 499 MW1 to 99 MW99changed
Lyngerup
LUP_132
room for new production250 to 499 MW1 to 99 MW99changed
Brøndbygård
BRY_132
room for new production100 to 249 MW1 to 99 MW96changed
Karlstrup
KRL_132
room for new production100 to 249 MW1 to 99 MW94changed
Knabberup
KNA_150
room for new production100 to 249 MW1 to 99 MW93changed
Lem Kær
LKR_150
room for new production100 to 249 MW1 to 99 MW78changed
Søndervig
SVGV150
room for new production100 to 249 MW1 to 99 MW78changed
Ballerupgård
BAL_132
room for new production100 to 249 MW1 to 99 MW77changed
Abildskov
ABS_150
room for new production100 to 249 MW1 to 99 MW22changed
Fraugde
FGD_150
room for new production100 to 249 MW1 to 99 MW19changed
Fraugde Vest
FGV_150
room for new production100 to 249 MW1 to 99 MW18changed
Fynsværket
FVO_150
room for new production100 to 249 MW1 to 99 MW17changed

The 50 largest changes are shown. The other 1, each of 1 MW or less, are in the CSV: 1 other change.

1 February 2025, against 1 January 2025

52 changes.

BatteryWhat changedFromToMWOur reading
Karlsgårde
KAE_150
room for new production500 to 999 MW1,000 MW and more1,251changed
Kassø
KAS_150
room for new production500 to 999 MW1,000 MW and more1,022changed
Borup
BOR_132
room for new production250 to 499 MW500 to 999 MW634changed
Stasevang
STA_132
room for new production250 to 499 MW500 to 999 MW550changed
Tårup Nord
TUP_150
room for new production250 to 499 MW500 to 999 MW533changed
Ryttergård
RYT_150
room for new production500 to 999 MW250 to 499 MW406changed
Dyregård
DYR_132
room for new production100 to 249 MW250 to 499 MW372changed
Landerupgård
LAG_150
room for new production500 to 999 MW250 to 499 MW327changed
Masnedøværket
MAV_132
room for new production100 to 249 MW250 to 499 MW299changed
Videbæk
VID_150
room for new production100 to 249 MW250 to 499 MW298changed
Sønderborg
SØN_150
room for new production100 to 249 MW250 to 499 MW289changed
Kyndbyværket
KYV_132
room for new production100 to 249 MW250 to 499 MW258changed
Lyngerup
LUP_132
room for new production100 to 249 MW250 to 499 MW258changed
Valseværket
VAL_132
room for new production100 to 249 MW250 to 499 MW254changed
Ferslev
FER_150
room for new production250 to 499 MW100 to 249 MW213changed
Tange
TAN_150
room for new production250 to 499 MW100 to 249 MW210changed
Idomlund
IDU_150
room for new production250 to 499 MW100 to 249 MW191changed
Ejbygård
EBY_132
room for new production250 to 499 MW100 to 249 MW151changed
Glentegård
GLN_132
room for new production250 to 499 MW100 to 249 MW142changed
Fraugde
FGD_150
room for new production500 to 999 MW100 to 249 MW112changed
Nibstrup
NSP_150
room for new production1 to 99 MW100 to 249 MW110changed
Bredkær
BDK_150
room for new production1 to 99 MW100 to 249 MW107changed
Knabberup
KNA_150
room for new production250 to 499 MW100 to 249 MW106changed
Fynsværket
FVO_150
room for new production250 to 499 MW100 to 249 MW105changed
Fraugde Vest
FGV_150
room for new production250 to 499 MW100 to 249 MW101changed
Frøstrup
FRT_150
room for new production100 to 249 MW1 to 99 MW98changed
Klim Fjordholme
KLF_150
room for new production100 to 249 MW1 to 99 MW98changed
Lindevang
LIN_132
room for new production250 to 499 MW1 to 99 MW98changed
Orehoved
ORH_132
room for new production100 to 249 MW1 to 99 MW96changed
Svendborg
SVB_150
room for new production100 to 249 MW1 to 99 MW95changed
Amagerværket
AMV_132
room for new production100 to 249 MW1 to 99 MW94changed
Amager kbst
AMK_132
room for new production100 to 249 MW1 to 99 MW93changed
Vordingborg Nord
VONØ132
room for new production100 to 249 MW1 to 99 MW93changed
Bellahøj kbst
BEL_132
room for new production250 to 499 MW1 to 99 MW92changed
Hedegård
HDE_132
room for new production100 to 249 MW1 to 99 MW90changed
Struer
STR_150
room for new production100 to 249 MW1 to 99 MW90changed
Engbjerg
ENB_150
room for new production100 to 249 MW1 to 99 MW89changed
Odense SØ
OSØ_150
room for new production250 to 499 MW1 to 99 MW87changed
Avedøreværket
AVV_132
room for new production100 to 249 MW1 to 99 MW86changed
H. C. Ørsted Værket
HCV_132
room for new production100 to 249 MW1 to 99 MW85changed
Måløvgård
MÅLØ132
room for new production100 to 249 MW1 to 99 MW84changed
Tjele
TJE_150
room for new production100 to 249 MW1 to 99 MW79changed
Svanemølle kbst.
SMK_132
room for new production100 to 249 MW1 to 99 MW67changed
Graderup
GRP_150
room for new production250 to 499 MW1 to 99 MW61changed
Bjørnholt
BJH_150
room for new production100 to 249 MW1 to 99 MW52changed
Kastrup
KAK_132
room for new production100 to 249 MW1 to 99 MW51changed
Vigerslev kbst
VIK_132
room for new production100 to 249 MW1 to 99 MW48changed
Kingstrup
KIN_150
room for new production100 to 249 MW1 to 99 MW45changed
Askær
ASR_150
room for new production100 to 249 MW1 to 99 MW33changed
Thyregod
THY_150
room for new production100 to 249 MW1 to 99 MW33changed

The 50 largest changes are shown. The other 2, each of 20 MW or less, are in the CSV: 2 other changes.

1 January 2025, against 1 December 2024

9 changes.

BatteryWhat changedFromToMWOur reading
Gørløse
GØR_132
room for new production500 to 999 MW250 to 499 MW488changed
Spanager
SPA_132
room for new production100 to 249 MW250 to 499 MW259changed
Bellahøj kbst
BEL_132
room for new production100 to 249 MW250 to 499 MW254changed
Blangslev
BLA_132
room for new production100 to 249 MW250 to 499 MW252changed
Knabberup
KNA_150
room for new production100 to 249 MW250 to 499 MW252changed
Næstved
NSV_132
room for new production100 to 249 MW250 to 499 MW251changed
Svendborg
SVB_150
room for new production250 to 499 MW100 to 249 MW249changed
Stovstrup
STSV150
room for new production250 to 499 MW100 to 249 MW243changed
Videbæk
VID_150
room for new production250 to 499 MW100 to 249 MW233changed

1 December 2024, against 1 November 2024

17 changes.

BatteryWhat changedFromToMWOur reading
Rislev
RIL_132
room for new production100 to 249 MW250 to 499 MW299changed
Stovstrup
STSV150
room for new production100 to 249 MW250 to 499 MW284changed
Nyrup
NYR_132
room for new production100 to 249 MW250 to 499 MW277changed
Videbæk
VID_150
room for new production100 to 249 MW250 to 499 MW272changed
Haslev Øst
HØT_132
room for new production100 to 249 MW250 to 499 MW251changed
Knabberup
KNA_150
room for new production250 to 499 MW100 to 249 MW246changed
Bellahøj kbst
BEL_132
room for new production250 to 499 MW100 to 249 MW243changed
Masnedøværket
MAV_132
room for new production1 to 99 MW100 to 249 MW217changed
Karlstrup
KRL_132
room for new production1 to 99 MW100 to 249 MW147changed
Fensmark
FNM_132
room for new production1 to 99 MW100 to 249 MW120changed
Hejninge
HEJ_132
room for new production1 to 99 MW100 to 249 MW120changed
Herlufmagle
HMA_132
room for new production1 to 99 MW100 to 249 MW117changed
Vordingborg Nord
VONØ132
room for new production1 to 99 MW100 to 249 MW115changed
Orehoved
ORH_132
room for new production1 to 99 MW100 to 249 MW114changed
Ostedgård
OST_132
room for new production1 to 99 MW100 to 249 MW114changed
Avedøreværket
AVV_132
room for new production1 to 99 MW100 to 249 MW108changed
Brøndbygård
BRY_132
room for new production1 to 99 MW100 to 249 MW108changed

1 November 2024, against 1 October 2024

26 changes.

BatteryWhat changedFromToMWOur reading
Gørløse
GØR_132
room for new production250 to 499 MW500 to 999 MW510changed
Bellahøj kbst
BEL_132
room for new production100 to 249 MW250 to 499 MW260changed
Knabberup
KNA_150
room for new production100 to 249 MW250 to 499 MW251changed
Ådalen
ADL_150
room for new production250 to 499 MW100 to 249 MW232changed
Mosbæk
MOSV150
room for new production250 to 499 MW100 to 249 MW208changed
Aalborg Øst
ÅBØ_150
room for new production250 to 499 MW100 to 249 MW195changed
Nyrup
NYR_132
room for new production250 to 499 MW100 to 249 MW169changed
Rislev
RIL_132
room for new production250 to 499 MW100 to 249 MW147changed
Haslev Øst
HØT_132
room for new production250 to 499 MW100 to 249 MW139changed
Næstved
NSV_132
room for new production250 to 499 MW100 to 249 MW137changed
Spanager
SPA_132
room for new production250 to 499 MW100 to 249 MW135changed
Vigerslev kbst
VIK_132
room for new production1 to 99 MW100 to 249 MW110changed
Søndervig
SVGV150
room for new production1 to 99 MW100 to 249 MW104changed
Blangslev
BLA_132
room for new production250 to 499 MW100 to 249 MW102changed
Hejninge
HEJ_132
room for new production100 to 249 MW1 to 99 MW97changed
Karlstrup
KRL_132
room for new production100 to 249 MW1 to 99 MW94changed
Vordingborg Nord
VONØ132
room for new production100 to 249 MW1 to 99 MW94changed
Masnedøværket
MAV_132
room for new production100 to 249 MW1 to 99 MW93changed
Orehoved
ORH_132
room for new production100 to 249 MW1 to 99 MW93changed
Nibstrup
NSP_150
room for new production100 to 249 MW1 to 99 MW86changed
Bredkær
BDK_150
room for new production100 to 249 MW1 to 99 MW85changed
Ostedgård
OST_132
room for new production100 to 249 MW1 to 99 MW76changed
Herlufmagle
HMA_132
room for new production100 to 249 MW1 to 99 MW72changed
Avedøreværket
AVV_132
room for new production100 to 249 MW1 to 99 MW70changed
Brøndbygård
BRY_132
room for new production100 to 249 MW1 to 99 MW70changed
Fensmark
FNM_132
room for new production100 to 249 MW1 to 99 MW58changed

1 October 2024, against 1 September 2024

21 changes.

BatteryWhat changedFromToMWOur reading
Gørløse
GØR_132
room for new production500 to 999 MW250 to 499 MW480changed
Rislev
RIL_132
room for new production100 to 249 MW250 to 499 MW315changed
Spanager
SPA_132
room for new production100 to 249 MW250 to 499 MW292changed
Haslev Øst
HØT_132
room for new production100 to 249 MW250 to 499 MW288changed
Næstved
NSV_132
room for new production100 to 249 MW250 to 499 MW269changed
Nyrup
NYR_132
room for new production100 to 249 MW250 to 499 MW267changed
Blangslev
BLA_132
room for new production100 to 249 MW250 to 499 MW254changed
Knabberup
KNA_150
room for new production250 to 499 MW100 to 249 MW247changed
Høskov
HSKV150
room for new production250 to 499 MW100 to 249 MW244changed
Teglstrupgård
TEG_132
room for new production250 to 499 MW100 to 249 MW244changed
Stovstrup
STSV150
room for new production250 to 499 MW100 to 249 MW240changed
Bellahøj kbst
BEL_132
room for new production250 to 499 MW100 to 249 MW234changed
Fensmark
FNM_132
room for new production1 to 99 MW100 to 249 MW128changed
Herlufmagle
HMA_132
room for new production1 to 99 MW100 to 249 MW128changed
Ostedgård
OST_132
room for new production1 to 99 MW100 to 249 MW120changed
Vordingborg Nord
VONØ132
room for new production1 to 99 MW100 to 249 MW120changed
Orehoved
ORH_132
room for new production1 to 99 MW100 to 249 MW119changed
Avedøreværket
AVV_132
room for new production1 to 99 MW100 to 249 MW110changed
Brøndbygård
BRY_132
room for new production1 to 99 MW100 to 249 MW110changed
Søndervig
SVGV150
room for new production100 to 249 MW1 to 99 MW98changed
Vigerslev kbst
VIK_132
room for new production100 to 249 MW1 to 99 MW97changed

1 September 2024, against 1 June 2024

52 changes.

BatteryWhat changedFromToMWOur reading
Karlsgårde
KAE_150
room for new production100 to 249 MW500 to 999 MW636changed
Lykkegård
LYK_150
room for new production250 to 499 MW500 to 999 MW566changed
Stasevang
STA_132
room for new production500 to 999 MW250 to 499 MW488changed
Fynsværket
FVO_150
room for new production500 to 999 MW250 to 499 MW447changed
Borup
BOR_132
room for new production500 to 999 MW250 to 499 MW391changed
Tårup Nord
TUP_150
room for new production500 to 999 MW250 to 499 MW375changed
Ensted
SHE_150
room for new production500 to 999 MW250 to 499 MW371changed
Ribe
RIB_150
room for new production500 to 999 MW250 to 499 MW349changed
Idomlund
IDU_150
room for new production100 to 249 MW250 to 499 MW323changed
Aalborg Øst
ÅBØ_150
room for new production100 to 249 MW250 to 499 MW309changed
Endrup
EDR_150
room for new production100 to 249 MW250 to 499 MW281changed
Skærbækværket
SVS_150
room for new production100 to 249 MW250 to 499 MW275changed
Høskov
HSKV150
room for new production100 to 249 MW250 to 499 MW260changed
Knabberup
KNA_150
room for new production100 to 249 MW250 to 499 MW260changed
Videbæk
VID_150
room for new production250 to 499 MW100 to 249 MW245changed
Ølstykkegård
ØLS_132
room for new production250 to 499 MW100 to 249 MW243changed
Hovegård
HVE_132
room for new production500 to 999 MW100 to 249 MW238changed
Abildskov
ABS_150
room for new production250 to 499 MW100 to 249 MW233changed
Vendsysselværket
NVV_150
room for new production250 to 499 MW100 to 249 MW226changed
Sønderborg
SØN_150
room for new production250 to 499 MW100 to 249 MW223changed
Lyngerup
LUP_132
room for new production250 to 499 MW100 to 249 MW220changed
Kyndbyværket
KYV_132
room for new production250 to 499 MW100 to 249 MW219changed
Dyregård
DYR_132
room for new production250 to 499 MW100 to 249 MW210changed
Hareskovgård
HSKØ132
room for new production250 to 499 MW100 to 249 MW206changed
Valseværket
VAL_132
room for new production250 to 499 MW100 to 249 MW206changed
Bagsværdgård
BAG_132
room for new production250 to 499 MW100 to 249 MW204changed
Kamstrup
KAM_132
room for new production250 to 499 MW100 to 249 MW203changed
Nyrup
NYR_132
room for new production250 to 499 MW100 to 249 MW184changed
Torslunde
TOR_132
room for new production250 to 499 MW100 to 249 MW177changed
Ishøj
ISH_132
room for new production500 to 999 MW100 to 249 MW175changed
Flaskegård
FLA_132
room for new production500 to 999 MW100 to 249 MW172changed
Vejleå
VEJ_132
room for new production250 to 499 MW100 to 249 MW172changed
Rislev
RIL_132
room for new production250 to 499 MW100 to 249 MW166changed
Vindingegård
VIN_132
room for new production250 to 499 MW100 to 249 MW162changed
Spanager
SPA_132
room for new production250 to 499 MW100 to 249 MW161changed
Haslev Øst
HØT_132
room for new production250 to 499 MW100 to 249 MW158changed
Næstved
NSV_132
room for new production250 to 499 MW100 to 249 MW157changed
Stigsnæsværket
STV_132
room for new production250 to 499 MW100 to 249 MW157changed
Blangslev
BLA_132
room for new production250 to 499 MW100 to 249 MW106changed
Masnedøværket
MAV_132
room for new production250 to 499 MW100 to 249 MW105changed
Vordingborg Nord
VONØ132
room for new production100 to 249 MW1 to 99 MW93changed
Orehoved
ORH_132
room for new production100 to 249 MW1 to 99 MW92changed
Radsted
RAD_132
room for new production100 to 249 MW1 to 99 MW89changed
Gloslunde
GLL_132--$
room for new production100 to 249 MW1 to 99 MW84changed
Ostedgård
OST_132
room for new production100 to 249 MW1 to 99 MW84changed
Herlufmagle
HMA_132
room for new production100 to 249 MW1 to 99 MW80changed
Avedøreværket
AVV_132
room for new production250 to 499 MW1 to 99 MW77changed
Brøndbygård
BRY_132
room for new production250 to 499 MW1 to 99 MW77changed
Eskilstrup
ESK_132
room for new production100 to 249 MW1 to 99 MW65changed
Femern
FEM_132
room for new production100 to 249 MW1 to 99 MW64changed

The 50 largest changes are shown. The other 2, each of 62 MW or less, are in the CSV: 2 other changes.