Since 1 June 2024: 485 other changes.
No Danish body publishes a list of batteries, so the list this site keeps by hand from owners’ releases and municipal permits is copied whenever it changes, and the difference between one copy and the one before is printed, battery by battery. Beneath it, Energinet’s capacity map: every transmission station whose room for new production moved from one band to another between Energinet’s publications. Nothing here is inferred from the numbers; it is one capture against the one before, identifier by identifier. The column headed "our reading" is a rule, and it can be wrong.
By month
| Month | Entered | MW entered | Left | Other changes | Respelt or refiled |
|---|---|---|---|---|---|
| February 2026 | 0 | · | 0 | 50 | · |
| December 2025 | 0 | · | 0 | 37 | · |
| November 2025 | 0 | · | 0 | 29 | · |
| September 2025 | 0 | · | 0 | 41 | · |
| July 2025 | 0 | · | 0 | 34 | · |
| June 2025 | 0 | · | 0 | 24 | · |
| May 2025 | 0 | · | 0 | 42 | · |
| March 2025 | 0 | · | 0 | 51 | · |
| February 2025 | 0 | · | 0 | 52 | · |
| January 2025 | 0 | · | 0 | 9 | · |
| December 2024 | 0 | · | 0 | 17 | · |
| November 2024 | 0 | · | 0 | 26 | · |
| October 2024 | 0 | · | 0 | 21 | · |
| September 2024 | 0 | · | 0 | 52 | · |
Where this can be wrong
The list is kept by hand, so a battery enters it when a source is found, which can be long after the battery started; the date of a change here is the date the list changed, never the date the battery did. On 25 October 2026 three rows of the first list, each a group of sites, were split into their sites, so they show as gone and the sites as new. The capacity map is Energinet’s recalculation, published about monthly; its first publication held is a baseline.
The list of batteries their owners and permits name
A battery enters when a source first names it and leaves only if a source says it was dropped or a row is split into its sites; a change of status is the owner’s or a permit’s word, read from a later document. The list is kept by hand, so a copy is taken whenever it changes. 1 capture held, 25 October 2026 to 25 October 2026.
One capture so far. The next read starts this ledger.
Energinet’s capacity map, transmission stations
Energinet republishes its map of the room for new production at each transmission station about monthly. A station appears here when its room moves from one band to another (nought, under 100, 100 to 249, 250 to 499, 500 to 999, 1,000 MW and more) on the grid as it is; the MW column is the newer figure. Only the 140 stations in every publication are compared, so a station joining or leaving the map is not counted. Energinet says the values are indicative and cannot be added up. 15 captures held, 1 June 2024 to 1 February 2026.
1 February 2026, against 1 December 2025
50 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Stovstrup STSV150 | room for new production | 0 MW | 500 to 999 MW | 813 | changed |
| Kyndbyværket KYV_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 609 | changed |
| Idomlund IDU_150 | room for new production | 100 to 249 MW | 500 to 999 MW | 580 | changed |
| Bramdrup BDR_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 488 | changed |
| Videbæk VID_150 | room for new production | 1 to 99 MW | 250 to 499 MW | 467 | changed |
| Landerupgård LAG_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 437 | changed |
| Gørløse GØR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 359 | changed |
| Allerødgård ALL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 357 | changed |
| Torslunde TOR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 330 | changed |
| Ølstykkegård ØLS_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 313 | changed |
| Ribe RIB_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 299 | changed |
| Andst AND_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 272 | changed |
| Skærbækværket SVS_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 259 | changed |
| Sperrestrupgård SPR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 254 | changed |
| Mosbæk MOSV150 | room for new production | 100 to 249 MW | 250 to 499 MW | 251 | changed |
| Blangslev BLA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 246 | changed |
| Aalborg Øst ÅBØ_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 230 | changed |
| Engbjerg ENB_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 208 | changed |
| Lem Kær LKR_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 195 | changed |
| Søndervig SVGV150 | room for new production | 1 to 99 MW | 100 to 249 MW | 193 | changed |
| Lyngerup LUP_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 191 | changed |
| Hvorupgård HVO_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 182 | changed |
| Hovegård HVE_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 172 | changed |
| Tange TAN_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 170 | changed |
| Sønderborg SØN_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 130 | changed |
| Grønnegård GRN_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 118 | changed |
| Herstedgård HSTØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 114 | changed |
| Ringsted RIN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Nors NOR_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 95 | changed |
| Orehoved ORH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 95 | changed |
| Flaskegård FLA_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 92 | changed |
| Ishøj ISH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 92 | changed |
| Høskov HSKV150 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| Åstrup ÅSP_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| Herlufmagle HMA_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 85 | changed |
| Hørning HØN_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 76 | changed |
| Kamstrup KAM_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 72 | changed |
| Nibstrup NSP_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 70 | changed |
| Fraugde FGD_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 69 | changed |
| Bredkær BDK_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 68 | changed |
| Fraugde Vest FGV_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 60 | changed |
| Fynsværket FVO_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 60 | changed |
| Svendborg SVB_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 60 | changed |
| Abildskov ABS_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 59 | changed |
| Odense SØ OSØ_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 56 | changed |
| Jersie JER_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 54 | changed |
| Malling MAL_150 | room for new production | 250 to 499 MW | 1 to 99 MW | 42 | changed |
| Hatting HAT_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 16 | changed |
| Herning Syd Vest HESV150 | room for new production | 0 MW | 1 to 99 MW | 3 | changed |
| Sdr Felding SFE_150 | room for new production | 0 MW | 1 to 99 MW | 2 | changed |
1 December 2025, against 1 November 2025
37 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Næstved NSV_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 523 | changed |
| Karlsgårde KAE_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 418 | changed |
| Søstremose SOS_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 336 | changed |
| Vestlolland VLO_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 276 | changed |
| Hvorupgård HVO_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 257 | changed |
| Blangslev BLA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 255 | changed |
| Landerupgård LAG_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 248 | changed |
| Vendsysselværket NVV_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 243 | changed |
| Rødby RBY_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 242 | changed |
| Stasevang STA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 241 | changed |
| Radsted RAD_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 238 | changed |
| Hasle HASV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 237 | changed |
| Mosbæk MOSV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 224 | changed |
| Foulum FOU_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 222 | changed |
| Torslunde TOR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 203 | changed |
| Gloslunde GLL_132--$ | room for new production | 1 to 99 MW | 100 to 249 MW | 199 | changed |
| Kamstrup KAM_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 177 | changed |
| Eskilstrup ESK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 154 | changed |
| Femern FEM_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 154 | changed |
| Fynsværket FVO_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 152 | changed |
| Fraugde Vest FGV_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 131 | changed |
| Odense SØ OSØ_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 128 | changed |
| Svendborg SVB_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 125 | changed |
| Sindbjerg SIN_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 116 | changed |
| Orehoved ORH_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 108 | changed |
| Roslev RSL_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 106 | changed |
| Vindingegård VIN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 85 | changed |
| Kirkeskovgård KSV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 84 | changed |
| Hedegård HDE_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 77 | changed |
| Grønnegård GRN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 73 | changed |
| Lindevang LIN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 68 | changed |
| Ostedgård OST_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 53 | changed |
| Hovegård HVE_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 43 | changed |
| Lyngerup LUP_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 38 | changed |
| Herning Syd Vest HESV150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
| Sdr Felding SFE_150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
| Stovstrup STSV150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
1 November 2025, against 1 September 2025
29 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Spanager SPA_132 | room for new production | 500 to 999 MW | 1,000 MW and more | 1,080 | changed |
| Rislev RIL_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 693 | changed |
| Masnedøværket MAV_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 608 | changed |
| Karlsgårde KAE_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 533 | changed |
| Kyndbyværket KYV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 378 | changed |
| Torslunde TOR_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 317 | changed |
| Stasevang STA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 294 | changed |
| Mosbæk MOSV150 | room for new production | 100 to 249 MW | 250 to 499 MW | 284 | changed |
| Nyrup NYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 236 | changed |
| Blangslev BLA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 225 | changed |
| Ejbygård EBY_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 194 | changed |
| Kirkeskovgård KSV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 176 | changed |
| Gørløse GØR_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 161 | changed |
| Bagsværdgård BAG_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 149 | changed |
| Dyregård DYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 145 | changed |
| Vindingegård VIN_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 118 | changed |
| Søstremose SOS_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 115 | changed |
| Flaskegård FLA_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 109 | changed |
| Lindevang LIN_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 107 | changed |
| Radsted RAD_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Knabberup KNA_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 95 | changed |
| Fynsværket FVO_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 88 | changed |
| Herstedgård HSTØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 87 | changed |
| Gloslunde GLL_132--$ | room for new production | 100 to 249 MW | 1 to 99 MW | 79 | changed |
| Eskilstrup ESK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 67 | changed |
| Femern FEM_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 60 | changed |
| Rødby RBY_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 55 | changed |
| Vejleå VEJ_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 48 | changed |
| Ballerupgård BAL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 44 | changed |
1 September 2025, against 1 July 2025
41 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Kassø KAS_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 895 | changed |
| Lykkegård LYK_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 618 | changed |
| Bramdrup BDR_150 | room for new production | 100 to 249 MW | 500 to 999 MW | 545 | changed |
| Torslunde TOR_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 510 | changed |
| Rislev RIL_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 483 | changed |
| Ådalen ADL_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 391 | changed |
| Vordingborg Nord VONØ132 | room for new production | 100 to 249 MW | 250 to 499 MW | 336 | changed |
| Bredebro BBR_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 330 | changed |
| Nyrup NYR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 324 | changed |
| Landerupgård LAG_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 288 | changed |
| Søstremose SOS_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 268 | changed |
| Sønderborg SØN_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 268 | changed |
| Vindingegård VIN_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 266 | changed |
| Foulum FOU_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 261 | changed |
| Bagsværdgård BAG_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 250 | changed |
| Kyndbyværket KYV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 245 | changed |
| Lyngerup LUP_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 242 | changed |
| Hatting HAT_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 211 | changed |
| Nibstrup NSP_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 125 | changed |
| Nors NOR_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 120 | changed |
| Fraugde FGD_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 118 | changed |
| Frøstrup FRT_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 117 | changed |
| Abildskov ABS_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 115 | changed |
| Åstrup ÅSP_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 113 | changed |
| Fynsværket FVO_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 105 | changed |
| Idomlund IDU_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 103 | changed |
| Bedsted BED_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 101 | changed |
| Bilstrup BIL_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 101 | changed |
| Flaskegård FLA_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 99 | changed |
| Gørløse GØR_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 88 | changed |
| Mosedegård MOSØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| Orehoved ORH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 83 | changed |
| Lindevang LIN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 61 | changed |
| Amagerværket AMV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 48 | changed |
| Glentegård GLN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 48 | changed |
| Svanemølle kbst. SMK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 48 | changed |
| Bellahøj kbst BEL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 47 | changed |
| Vigerslev kbst VIK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 44 | changed |
| Herning Syd Vest HESV150 | room for new production | 0 MW | 1 to 99 MW | 2 | changed |
| Stovstrup STSV150 | room for new production | 0 MW | 1 to 99 MW | 2 | changed |
| Sdr Felding SFE_150 | room for new production | 0 MW | 1 to 99 MW | 1 | changed |
1 July 2025, against 1 June 2025
34 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Holsted HOD_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 704 | changed |
| Andst AND_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 693 | changed |
| Ribe RIB_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 628 | changed |
| Torslunde TOR_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 493 | changed |
| Masnedøværket MAV_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 454 | changed |
| Lykkegård LYK_150 | room for new production | 1,000 MW and more | 250 to 499 MW | 451 | changed |
| Kassø KAS_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 424 | changed |
| Karlsgårde KAE_150 | room for new production | 1,000 MW and more | 250 to 499 MW | 413 | changed |
| Tårup Nord TUP_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 400 | changed |
| Ryttergård RYT_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 355 | changed |
| Hatting HAT_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 300 | changed |
| Foulum FOU_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 247 | changed |
| Ådalen ADL_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 242 | changed |
| Hovegård HVE_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 242 | changed |
| Bredebro BBR_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 231 | changed |
| Vordingborg Nord VONØ132 | room for new production | 250 to 499 MW | 100 to 249 MW | 215 | changed |
| Endrup EDR_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 203 | changed |
| Bramdrup BDR_150 | room for new production | 500 to 999 MW | 100 to 249 MW | 182 | changed |
| Knabberup KNA_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 139 | changed |
| Glentegård GLN_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 127 | changed |
| Bellahøj kbst BEL_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 122 | changed |
| Allerødgård ALL_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 121 | changed |
| Gørløse GØR_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 116 | changed |
| Amagerværket AMV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 110 | changed |
| Vigerslev kbst VIK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 103 | changed |
| Mosedegård MOSØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 102 | changed |
| Nors NOR_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Frøstrup FRT_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 94 | changed |
| Bedsted BED_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 40 | changed |
| Bilstrup BIL_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 38 | changed |
| Idomlund IDU_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 36 | changed |
| Herning Syd Vest HESV150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
| Sdr Felding SFE_150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
| Stovstrup STSV150 | room for new production | 1 to 99 MW | 0 MW | 0 | changed |
1 June 2025, against 1 May 2025
24 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Ølstykkegård ØLS_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 577 | changed |
| Lyngerup LUP_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 306 | changed |
| Hovegård HVE_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 285 | changed |
| Stigsnæsværket STV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 249 | changed |
| Tårup Nord TUP_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 248 | changed |
| Søstremose SOS_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 245 | changed |
| Ryttergård RYT_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 236 | changed |
| Vestlolland VLO_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 236 | changed |
| Mosbæk MOSV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 200 | changed |
| Sperrestrupgård SPR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 156 | changed |
| Stasevang STA_132 | room for new production | 500 to 999 MW | 100 to 249 MW | 142 | changed |
| Ballerupgård BAL_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 107 | changed |
| Herstedgård HSTØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 105 | changed |
| Åstrup ÅSP_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 99 | changed |
| Sindbjerg SIN_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 95 | changed |
| Allerødgård ALL_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 94 | changed |
| Glentegård GLN_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Videbæk VID_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 91 | changed |
| Roslev RSL_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 87 | changed |
| Amagerværket AMV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| H. C. Ørsted Værket HCV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| Vigerslev kbst VIK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 85 | changed |
| Bellahøj kbst BEL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 84 | changed |
| Gørløse GØR_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 84 | changed |
1 May 2025, against 1 March 2025
42 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Lykkegård LYK_150 | room for new production | 500 to 999 MW | 1,000 MW and more | 1,127 | changed |
| Karlsgårde KAE_150 | room for new production | 500 to 999 MW | 1,000 MW and more | 1,099 | changed |
| Spanager SPA_132 | room for new production | 1,000 MW and more | 500 to 999 MW | 948 | changed |
| Kassø KAS_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 816 | changed |
| Bramdrup BDR_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 582 | changed |
| Masnedøværket MAV_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 545 | changed |
| Torslunde TOR_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 514 | changed |
| Ribe RIB_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 471 | changed |
| Hejninge HEJ_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 412 | changed |
| Ensted SHE_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 411 | changed |
| Aalborg Øst ÅBØ_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 372 | changed |
| Vordingborg Nord VONØ132 | room for new production | 100 to 249 MW | 250 to 499 MW | 371 | changed |
| Bredebro BBR_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 353 | changed |
| Dyregård DYR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 345 | changed |
| Teglstrupgård TEG_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 342 | changed |
| Ølstykkegård ØLS_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 333 | changed |
| Ejbygård EBY_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 328 | changed |
| Kirkeskovgård KSV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 322 | changed |
| Tårup Nord TUP_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 281 | changed |
| Kyndbyværket KYV_132 | room for new production | 1 to 99 MW | 250 to 499 MW | 266 | changed |
| Ryttergård RYT_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 264 | changed |
| Andst AND_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 259 | changed |
| Sperrestrupgård SPR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 252 | changed |
| Vestlolland VLO_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 250 | changed |
| Lyngerup LUP_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 248 | changed |
| Rødby RBY_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 231 | changed |
| Nyrup NYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 197 | changed |
| Gloslunde GLL_132--$ | room for new production | 1 to 99 MW | 100 to 249 MW | 166 | changed |
| Eskilstrup ESK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 159 | changed |
| Lindevang LIN_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 151 | changed |
| Jersie JER_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 147 | changed |
| Svanemølle kbst. SMK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 136 | changed |
| H. C. Ørsted Værket HCV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 130 | changed |
| Femern FEM_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 124 | changed |
| Vigerslev kbst VIK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 121 | changed |
| Bellahøj kbst BEL_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 118 | changed |
| Amagerværket AMV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 109 | changed |
| Nibstrup NSP_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Mosedegård MOSØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 88 | changed |
| Vilsted VIL_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 88 | changed |
| Herstedgård HSTØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 76 | changed |
| Stovstrup STSV150 | room for new production | 100 to 249 MW | 1 to 99 MW | 30 | changed |
1 March 2025, against 1 February 2025
51 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Spanager SPA_132 | room for new production | 250 to 499 MW | 1,000 MW and more | 1,043 | changed |
| Teglstrupgård TEG_132 | room for new production | 100 to 249 MW | 500 to 999 MW | 758 | changed |
| Haslev Øst HØT_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 708 | changed |
| Karlsgårde KAE_150 | room for new production | 1,000 MW and more | 500 to 999 MW | 628 | changed |
| Rislev RIL_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 615 | changed |
| Jersie JER_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 426 | changed |
| Kamstrup KAM_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 347 | changed |
| Vendsysselværket NVV_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 344 | changed |
| Stigsnæsværket STV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 344 | changed |
| Kassø KAS_150 | room for new production | 1,000 MW and more | 250 to 499 MW | 334 | changed |
| Tange TAN_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 317 | changed |
| Mosbæk MOSV150 | room for new production | 100 to 249 MW | 250 to 499 MW | 312 | changed |
| Ådalen ADL_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 291 | changed |
| Torslunde TOR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 274 | changed |
| Ferslev FER_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 253 | changed |
| Søstremose SOS_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 250 | changed |
| Dyregård DYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 242 | changed |
| Ensted SHE_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 205 | changed |
| Hatting HAT_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 204 | changed |
| Kirkeskovgård KSV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 200 | changed |
| Moselund MLU_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 200 | changed |
| Klim Fjordholme KLF_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 190 | changed |
| Tårup Nord TUP_150 | room for new production | 500 to 999 MW | 100 to 249 MW | 182 | changed |
| Frøstrup FRT_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 173 | changed |
| Videbæk VID_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 172 | changed |
| Hedegård HDE_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 151 | changed |
| Ryttergård RYT_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 143 | changed |
| Landerupgård LAG_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 139 | changed |
| Radsted RAD_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 137 | changed |
| Bredebro BBR_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 133 | changed |
| Sønderborg SØN_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 123 | changed |
| Ribe RIB_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 121 | changed |
| Vilsted VIL_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 118 | changed |
| Skærbækværket SVS_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 109 | changed |
| Magstrup MAG_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 107 | changed |
| Orehoved ORH_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 106 | changed |
| Andst AND_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 104 | changed |
| Vordingborg Nord VONØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 102 | changed |
| Kyndbyværket KYV_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 99 | changed |
| Lyngerup LUP_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 99 | changed |
| Brøndbygård BRY_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Karlstrup KRL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 94 | changed |
| Knabberup KNA_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Lem Kær LKR_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 78 | changed |
| Søndervig SVGV150 | room for new production | 100 to 249 MW | 1 to 99 MW | 78 | changed |
| Ballerupgård BAL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 77 | changed |
| Abildskov ABS_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 22 | changed |
| Fraugde FGD_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 19 | changed |
| Fraugde Vest FGV_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 18 | changed |
| Fynsværket FVO_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 17 | changed |
The 50 largest changes are shown. The other 1, each of 1 MW or less, are in the CSV: 1 other change.
1 February 2025, against 1 January 2025
52 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Karlsgårde KAE_150 | room for new production | 500 to 999 MW | 1,000 MW and more | 1,251 | changed |
| Kassø KAS_150 | room for new production | 500 to 999 MW | 1,000 MW and more | 1,022 | changed |
| Borup BOR_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 634 | changed |
| Stasevang STA_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 550 | changed |
| Tårup Nord TUP_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 533 | changed |
| Ryttergård RYT_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 406 | changed |
| Dyregård DYR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 372 | changed |
| Landerupgård LAG_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 327 | changed |
| Masnedøværket MAV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 299 | changed |
| Videbæk VID_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 298 | changed |
| Sønderborg SØN_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 289 | changed |
| Kyndbyværket KYV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 258 | changed |
| Lyngerup LUP_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 258 | changed |
| Valseværket VAL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 254 | changed |
| Ferslev FER_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 213 | changed |
| Tange TAN_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 210 | changed |
| Idomlund IDU_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 191 | changed |
| Ejbygård EBY_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 151 | changed |
| Glentegård GLN_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 142 | changed |
| Fraugde FGD_150 | room for new production | 500 to 999 MW | 100 to 249 MW | 112 | changed |
| Nibstrup NSP_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 110 | changed |
| Bredkær BDK_150 | room for new production | 1 to 99 MW | 100 to 249 MW | 107 | changed |
| Knabberup KNA_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 106 | changed |
| Fynsværket FVO_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 105 | changed |
| Fraugde Vest FGV_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 101 | changed |
| Frøstrup FRT_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 98 | changed |
| Klim Fjordholme KLF_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 98 | changed |
| Lindevang LIN_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 98 | changed |
| Orehoved ORH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 96 | changed |
| Svendborg SVB_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 95 | changed |
| Amagerværket AMV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 94 | changed |
| Amager kbst AMK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Vordingborg Nord VONØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Bellahøj kbst BEL_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 92 | changed |
| Hedegård HDE_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 90 | changed |
| Struer STR_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 90 | changed |
| Engbjerg ENB_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 89 | changed |
| Odense SØ OSØ_150 | room for new production | 250 to 499 MW | 1 to 99 MW | 87 | changed |
| Avedøreværket AVV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| H. C. Ørsted Værket HCV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 85 | changed |
| Måløvgård MÅLØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 84 | changed |
| Tjele TJE_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 79 | changed |
| Svanemølle kbst. SMK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 67 | changed |
| Graderup GRP_150 | room for new production | 250 to 499 MW | 1 to 99 MW | 61 | changed |
| Bjørnholt BJH_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 52 | changed |
| Kastrup KAK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 51 | changed |
| Vigerslev kbst VIK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 48 | changed |
| Kingstrup KIN_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 45 | changed |
| Askær ASR_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 33 | changed |
| Thyregod THY_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 33 | changed |
The 50 largest changes are shown. The other 2, each of 20 MW or less, are in the CSV: 2 other changes.
1 January 2025, against 1 December 2024
9 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Gørløse GØR_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 488 | changed |
| Spanager SPA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 259 | changed |
| Bellahøj kbst BEL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 254 | changed |
| Blangslev BLA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 252 | changed |
| Knabberup KNA_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 252 | changed |
| Næstved NSV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 251 | changed |
| Svendborg SVB_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 249 | changed |
| Stovstrup STSV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 243 | changed |
| Videbæk VID_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 233 | changed |
1 December 2024, against 1 November 2024
17 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Rislev RIL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 299 | changed |
| Stovstrup STSV150 | room for new production | 100 to 249 MW | 250 to 499 MW | 284 | changed |
| Nyrup NYR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 277 | changed |
| Videbæk VID_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 272 | changed |
| Haslev Øst HØT_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 251 | changed |
| Knabberup KNA_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 246 | changed |
| Bellahøj kbst BEL_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 243 | changed |
| Masnedøværket MAV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 217 | changed |
| Karlstrup KRL_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 147 | changed |
| Fensmark FNM_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 120 | changed |
| Hejninge HEJ_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 120 | changed |
| Herlufmagle HMA_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 117 | changed |
| Vordingborg Nord VONØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 115 | changed |
| Orehoved ORH_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 114 | changed |
| Ostedgård OST_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 114 | changed |
| Avedøreværket AVV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 108 | changed |
| Brøndbygård BRY_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 108 | changed |
1 November 2024, against 1 October 2024
26 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Gørløse GØR_132 | room for new production | 250 to 499 MW | 500 to 999 MW | 510 | changed |
| Bellahøj kbst BEL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 260 | changed |
| Knabberup KNA_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 251 | changed |
| Ådalen ADL_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 232 | changed |
| Mosbæk MOSV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 208 | changed |
| Aalborg Øst ÅBØ_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 195 | changed |
| Nyrup NYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 169 | changed |
| Rislev RIL_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 147 | changed |
| Haslev Øst HØT_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 139 | changed |
| Næstved NSV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 137 | changed |
| Spanager SPA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 135 | changed |
| Vigerslev kbst VIK_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 110 | changed |
| Søndervig SVGV150 | room for new production | 1 to 99 MW | 100 to 249 MW | 104 | changed |
| Blangslev BLA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 102 | changed |
| Hejninge HEJ_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 97 | changed |
| Karlstrup KRL_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 94 | changed |
| Vordingborg Nord VONØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 94 | changed |
| Masnedøværket MAV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Orehoved ORH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Nibstrup NSP_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 86 | changed |
| Bredkær BDK_150 | room for new production | 100 to 249 MW | 1 to 99 MW | 85 | changed |
| Ostedgård OST_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 76 | changed |
| Herlufmagle HMA_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 72 | changed |
| Avedøreværket AVV_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 70 | changed |
| Brøndbygård BRY_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 70 | changed |
| Fensmark FNM_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 58 | changed |
1 October 2024, against 1 September 2024
21 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Gørløse GØR_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 480 | changed |
| Rislev RIL_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 315 | changed |
| Spanager SPA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 292 | changed |
| Haslev Øst HØT_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 288 | changed |
| Næstved NSV_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 269 | changed |
| Nyrup NYR_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 267 | changed |
| Blangslev BLA_132 | room for new production | 100 to 249 MW | 250 to 499 MW | 254 | changed |
| Knabberup KNA_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 247 | changed |
| Høskov HSKV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 244 | changed |
| Teglstrupgård TEG_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 244 | changed |
| Stovstrup STSV150 | room for new production | 250 to 499 MW | 100 to 249 MW | 240 | changed |
| Bellahøj kbst BEL_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 234 | changed |
| Fensmark FNM_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 128 | changed |
| Herlufmagle HMA_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 128 | changed |
| Ostedgård OST_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 120 | changed |
| Vordingborg Nord VONØ132 | room for new production | 1 to 99 MW | 100 to 249 MW | 120 | changed |
| Orehoved ORH_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 119 | changed |
| Avedøreværket AVV_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 110 | changed |
| Brøndbygård BRY_132 | room for new production | 1 to 99 MW | 100 to 249 MW | 110 | changed |
| Søndervig SVGV150 | room for new production | 100 to 249 MW | 1 to 99 MW | 98 | changed |
| Vigerslev kbst VIK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 97 | changed |
1 September 2024, against 1 June 2024
52 changes.
| Battery | What changed | From | To | MW | Our reading |
|---|---|---|---|---|---|
| Karlsgårde KAE_150 | room for new production | 100 to 249 MW | 500 to 999 MW | 636 | changed |
| Lykkegård LYK_150 | room for new production | 250 to 499 MW | 500 to 999 MW | 566 | changed |
| Stasevang STA_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 488 | changed |
| Fynsværket FVO_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 447 | changed |
| Borup BOR_132 | room for new production | 500 to 999 MW | 250 to 499 MW | 391 | changed |
| Tårup Nord TUP_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 375 | changed |
| Ensted SHE_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 371 | changed |
| Ribe RIB_150 | room for new production | 500 to 999 MW | 250 to 499 MW | 349 | changed |
| Idomlund IDU_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 323 | changed |
| Aalborg Øst ÅBØ_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 309 | changed |
| Endrup EDR_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 281 | changed |
| Skærbækværket SVS_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 275 | changed |
| Høskov HSKV150 | room for new production | 100 to 249 MW | 250 to 499 MW | 260 | changed |
| Knabberup KNA_150 | room for new production | 100 to 249 MW | 250 to 499 MW | 260 | changed |
| Videbæk VID_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 245 | changed |
| Ølstykkegård ØLS_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 243 | changed |
| Hovegård HVE_132 | room for new production | 500 to 999 MW | 100 to 249 MW | 238 | changed |
| Abildskov ABS_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 233 | changed |
| Vendsysselværket NVV_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 226 | changed |
| Sønderborg SØN_150 | room for new production | 250 to 499 MW | 100 to 249 MW | 223 | changed |
| Lyngerup LUP_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 220 | changed |
| Kyndbyværket KYV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 219 | changed |
| Dyregård DYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 210 | changed |
| Hareskovgård HSKØ132 | room for new production | 250 to 499 MW | 100 to 249 MW | 206 | changed |
| Valseværket VAL_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 206 | changed |
| Bagsværdgård BAG_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 204 | changed |
| Kamstrup KAM_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 203 | changed |
| Nyrup NYR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 184 | changed |
| Torslunde TOR_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 177 | changed |
| Ishøj ISH_132 | room for new production | 500 to 999 MW | 100 to 249 MW | 175 | changed |
| Flaskegård FLA_132 | room for new production | 500 to 999 MW | 100 to 249 MW | 172 | changed |
| Vejleå VEJ_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 172 | changed |
| Rislev RIL_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 166 | changed |
| Vindingegård VIN_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 162 | changed |
| Spanager SPA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 161 | changed |
| Haslev Øst HØT_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 158 | changed |
| Næstved NSV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 157 | changed |
| Stigsnæsværket STV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 157 | changed |
| Blangslev BLA_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 106 | changed |
| Masnedøværket MAV_132 | room for new production | 250 to 499 MW | 100 to 249 MW | 105 | changed |
| Vordingborg Nord VONØ132 | room for new production | 100 to 249 MW | 1 to 99 MW | 93 | changed |
| Orehoved ORH_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 92 | changed |
| Radsted RAD_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 89 | changed |
| Gloslunde GLL_132--$ | room for new production | 100 to 249 MW | 1 to 99 MW | 84 | changed |
| Ostedgård OST_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 84 | changed |
| Herlufmagle HMA_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 80 | changed |
| Avedøreværket AVV_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 77 | changed |
| Brøndbygård BRY_132 | room for new production | 250 to 499 MW | 1 to 99 MW | 77 | changed |
| Eskilstrup ESK_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 65 | changed |
| Femern FEM_132 | room for new production | 100 to 249 MW | 1 to 99 MW | 64 | changed |
The 50 largest changes are shown. The other 2, each of 62 MW or less, are in the CSV: 2 other changes.