155 promoters behind 224 battery installations in the State gazette
The gazette names the company that applies for each installation, which is usually a project company held by a larger group. This page lists the promoters as the gazette names them, one spelling each, largest first. Which group holds each project company is not yet read from the company register, so a group can appear here under several names.
The largest 40 by battery power. Every promoter follows, with its installations.
Iberenova Promociones, SA
Also written IBERENOVA PROMOCIONES S.A.U.; Iberenova Promociones, S.A.U.; Iberenova Promociones, SAU.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BAT Cedillo | Cedillo, Cáceres | 215 | 888 | In public consultation | 2 Oct 2025 |
| BESS Hibridación FV Virgen de Areños III | Villota del Páramo, Palencia | 35 | 145 | Environmental decision | 25 Sep 2026 |
| Bat Tagus IV | Alcántara, Cáceres | 35 | 145 | Environmental decision | 5 Feb 2026 |
| Bat Tagus III | Alcántara, Cáceres | 35 | 145 | Environmental decision | 5 Feb 2026 |
| Bat Tagus II | Alcántara, Cáceres | 35 | 145 | Environmental decision | 5 Feb 2026 |
| Bat Tagus I | Alcántara, Cáceres | 35 | 145 | Environmental decision | 5 Feb 2026 |
| BESS Hibridación FV Revilla-Vallejera | Vallejera, Burgos | 27.5 | 59.9 | Authorised to build | 7 Oct 2024 |
| BESS Hibridación Almaraz II | Belvís de Monroy, Cáceres | 26.4 | 59.9 | In public consultation | 19 Jun 2024 |
| BESS Hibridación Almaraz | Belvís de Monroy, Cáceres | 26.4 | 59.9 | In public consultation | 19 Jun 2024 |
Generación Eólica Castilla-La Mancha, SL
Also written GENERACION EOLICA CASTILLA LA MANCHA, S.L..
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Gecama | Atalaya de Cañavate, Cuenca | 100 | 200 | Authorised to build | 14 Jul 2025 |
| Storage at parque eólico Gecama | Atalaya del Cañavate, Cuenca | 100 | 200 | Environmental decision | 11 Dec 2024 |
| Storage at Parque GECAMA EÓLICO | Atalaya del Cañavate, Cuenca | 100 | · | In public consultation | 3 Jan 2023 |
BOMBO VALLE SOLAR, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS II Valle Solar | Jarafuel, Valencia | 167 | 333 | Environmental decision | 12 Feb 2026 |
| BESS I Valle Solar | Jarafuel, Valencia | 92.5 | 185 | Environmental decision | 12 Feb 2026 |
SOLARIA Promoción y Desarrollo Fotovoltaico, S.L.U.
Also written Solaria Promoción y Desarrollo Fotovoltaico, SLU.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Agrupación Maira Alpha | Llano de Bureba, Burgos | 60 | 240 | Environmental decision | 22 Dec 2025 |
| Agrupación Maira «Gamma» | Briviesca, Burgos | 45 | 180 | Environmental decision | 24 Jul 2026 |
| Agrupación Maira Delta | Valluércanes, Burgos | 45 | 180 | Environmental decision | 22 Dec 2025 |
| Agrupación Maira Beta | La Vid de Bureba, Burgos | 45 | 180 | Environmental decision | 22 Dec 2025 |
| Titan Solar | Peralveche, Guadalajara | 20 | 80 | Environmental decision | 27 Feb 2026 |
| Mimas Solar | Peralveche, Guadalajara | 20 | 80 | Environmental decision | 27 Feb 2026 |
| Dione Solar | Peralveche, Guadalajara | 20 | 80 | Environmental decision | 27 Feb 2026 |
Naturgy Renovables, SLU
Also written Naturgy Renovables, S.L.U..
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Villanueva del Rey | La Luisiana, Sevilla | 22.9 | · | In public consultation | 9 Mar 2026 |
| ALM Los Naipes II | Badajoz, Badajoz | 21.4 | · | Environmental decision | 11 May 2026 |
| ALM Los Naipes | Badajoz, Badajoz | 21.4 | · | Environmental decision | 11 May 2026 |
| ALM El Encinar I | Badajoz, Badajoz | 21.4 | · | Environmental decision | 11 May 2026 |
| BESS La Nava | Almodóvar del Campo, Ciudad Real | 20.8 | 46.7 | Authorised to build | 27 Mar 2025 |
| Planta de Almacenamiento de Energía con Baterías Carpio de Tajo | El Carpio de Tajo, Toledo | 20.8 | 46.7 | Authorised to build | 21 Mar 2025 |
| Storage at P.E. San Blas | Valverde de Campos, Valladolid | 20 | · | Refused, withdrawn or rejected | 18 Aug 2026 |
| BESS Tabernas I | Tabernas, Almería | 19.8 | 46.7 | Authorised to build | 21 Oct 2026 |
| BESS Tabernas II | Tabernas, Almería | 19.8 | 46.7 | Authorised to build | 13 Oct 2026 |
| BESS Picón II | Porzuna, Ciudad Real | 19.8 | 46.7 | Authorised to build | 26 Feb 2026 |
| BESS Picón III | Porzuna, Ciudad Real | 19.8 | 46.7 | Authorised to build | 19 Feb 2026 |
| BESS Picón I | Porzuna, Ciudad Real | 19.8 | 46.7 | Authorised to build | 19 Feb 2026 |
| HIB. SAE PILETAS I | Agüimes, Las Palmas | 6.3 | 12.9 | First authorisation | 5 May 2025 |
Sargao Energy, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Picassent BESS 132 kV | Picassent, Valencia | 108 | 216 | First authorisation | 21 May 2026 |
| Picassent BESS | Picassent, Valencia | 108 | 216 | Environmental decision | 24 Mar 2025 |
Dehesa Solar Sur, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BAT Oriol | Ceclavín, Cáceres | 205 | 846 | In public consultation | 3 Nov 2025 |
Tagenergy Spain Investments 1, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Tabiella Bess | Gozón, Asturias | 100 | 216 | Environmental decision | 11 Dec 2024 |
| Tabiella Bess 132 kV | Gozón, Asturias | 100 | · | First authorisation | 11 Mar 2026 |
Rolwind Andalucía 10, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ST Palmosilla | Tarifa, Cádiz | 200 | 885 | First authorisation | 4 Jun 2026 |
Valdesolar Hive S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Valdesolar | Valdecaballeros, Badajoz | 200 | 413 | In public consultation | 17 Mar 2026 |
Khons Sun Power, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Tagus 2 HBESS | Ocaña, Toledo | 176 | 662 | Authorised to build | 16 Oct 2026 |
Jinko Greenfield Spain 1, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS FV La Puebla 3 | Cerro de Andévalo, Huelva | 150 | 600 | In public consultation | 16 Sep 2026 |
Enel Green Power España, SL
Also written Enel Green Power España, S.L.; Enel Green Power España, SLU.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS San Martín | Albalate del Arzobispo, Teruel | 60.8 | · | Refused, withdrawn or rejected | 25 Jun 2026 |
| BESS Mudéjar | Andorra, Teruel | 41.6 | 89.5 | Refused, withdrawn or rejected | 30 Jul 2026 |
| BESS El Tambor | Híjar, Teruel | 19 | · | Refused, withdrawn or rejected | 25 Jun 2026 |
| Tesouro Storage | As Pontes de García Rodríguez, A Coruña | 17.5 | 37 | Authorised to build | 19 Oct 2026 |
| Moeche Storage | Moeche, A Coruña | 10.5 | 22.2 | In public consultation | 28 Apr 2026 |
Cadaques Directorship, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| La Farga BESS | Vilademuls, Girona | 148 | 297 | First authorisation | 16 May 2026 |
Enel Green Power España Solar 1, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Valdecaballero Batería | Casas de Don Pedro, Badajoz | 38.5 | 77 | First authorisation | 13 Jun 2026 |
| Navalvillar Batería | Casas de Don Pedro, Badajoz | 38.5 | 77 | First authorisation | 13 Jun 2026 |
| Castilblanco Batería | Casas de Don Pedro, Badajoz | 38.5 | 77 | First authorisation | 13 Jun 2026 |
| Apicio | Fregenal de la Sierra, Badajoz | 30 | 60 | First authorisation | 18 Dec 2025 |
Red Eléctrica de España, Sociedad Anónima Unipersonal
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Unnamed storage (BOE-B-2023-18032) | Sant Antoni de Portmany, Illes Balears | 90 | 67.5 | In public consultation | 13 Jun 2023 |
| Instalación de un conjunto de baterías en la subestación Mercadal | Es Mercadal, Illes Balears | 50 | 37.5 | In public consultation | 1 Jun 2023 |
Gaetana Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Gaetana | La Roca de la Sierra, Badajoz | 120 | 432 | In public consultation | 9 Jul 2026 |
Planta FV 146 SL, Planta FV 148 SL, Planta FV 149 SL, Planta FV 147 SL, Planta FV 145 SL y Planta FV 144 SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Thermisco | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
| Tethys | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
| Telesto 7 | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
| Telesto 4 | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
| Telesto | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
| Rhea | Budia, Guadalajara | 20 | 40 | Environmental decision | 16 Mar 2026 |
SPK FALCON, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| SPK Trujillo | Trujillo, Cáceres | 109 | 402 | In public consultation | 23 Jun 2026 |
Aurea Solar, S.L.U
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS AUREA | La Roca de la Sierra, Badajoz | 108 | 432 | In public consultation | 6 Jul 2026 |
AMELIE PV, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Pacheco | Cartagena, Murcia | 105 | 499 | In public consultation | 3 Jun 2026 |
A Green Message, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Lagerung | Sant Julià de Ramis, Girona | 102 | 407 | First authorisation | 17 Jun 2026 |
Full Solar Energy, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Visenta | Sesué, Huesca | 100 | 407 | Refused, withdrawn or rejected | 10 Jul 2026 |
Power Tarida, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Perdiguero | Benasque, Huesca | 100 | 407 | Refused, withdrawn or rejected | 25 Jun 2026 |
Parque Solar Cáceres, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridaciones FV Arenales | Cáceres, Cáceres | 95 | 392 | Environmental decision | 30 May 2026 |
MURSOLAR 14, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS La Atalaya | Villena, Alicante | 83.7 | 331 | In public consultation | 30 Jul 2026 |
Rolwind Málaga 1, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ST Cerrillo | Álora, Málaga | 77.6 | 340 | Authorised to build | 5 Jun 2026 |
Energía Frigoria 2, S. L. U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Orcoyen Almacena | Orcoyen, Navarra | 73.6 | 222 | In public consultation | 16 Jun 2026 |
Galp Energía España, SAU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bess Valdivieso | Alcázar de San Juan, Ciudad Real | 18.5 | 37 | Environmental decision | 27 Jan 2026 |
| Alm Bess Valdecarro | Alcázar de San Juan, Ciudad Real | 18.5 | 37 | Environmental decision | 27 Jan 2026 |
| Alcázar 2 | Alcázar de San Juan, Ciudad Real | 16.5 | 33 | Environmental decision | 27 Jan 2026 |
| Alcázar 1 | Alcázar de San Juan, Ciudad Real | 16.5 | 33 | Environmental decision | 27 Jan 2026 |
Azor Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Azor Solar 2 | Paracuellos de Jarama, Madrid | 44.6 | 179 | First authorisation | 12 Oct 2026 |
| BESS Azor Solar 1 | Paracuellos de Jarama, Madrid | 23.9 | 96.7 | First authorisation | 12 Oct 2026 |
Dehesa de los Guadalupes Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hernán Cortés | Logrosán, Cáceres | 38.5 | 60 | First authorisation | 19 Dec 2025 |
| Beturia | Fregenal de la Sierra, Badajoz | 30 | 60 | First authorisation | 25 Aug 2025 |
Arena Power Ren 29, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PB Babor 7 | Tarifa, Cádiz | 66 | 198 | First authorisation | 1 Jul 2026 |
Arena Power Ren 34, SLU; Arena Power Ren 31, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PB Navegantes 32 | Mieres, Asturias | 65 | 210 | Environmental decision | 18 Apr 2026 |
GANDASOLAR 29, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| El Tello | Picassent, Valencia | 63 | · | Refused, withdrawn or rejected | 21 Mar 2025 |
Furatena Solar 1, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Quijote | Logrosán, Cáceres | 30 | 60 | First authorisation | 18 Dec 2025 |
| ALM Ardila Batería | Fregenal de la Sierra, Badajoz | 30 | 60 | Authorised to build | 6 Jan 2025 |
Solar Majada Alta, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BAT San Antonio | Cedillo, Cáceres | 30 | 124 | Environmental decision | 2 Oct 2025 |
| BAT Majada Alta | Cedillo, Cáceres | 30 | 124 | Environmental decision | 2 Oct 2025 |
Energía Glauco, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Glauco Almacena | Vilademuls, Girona | 55.4 | 222 | First authorisation | 16 May 2026 |
Soner Picasso, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Cuevas | la Vall d'Uixó, Castellón | 55.2 | 221 | First authorisation | 23 Oct 2026 |
Seguidores Solares Planta 2, SLU
Also written SEGUIDORES SOLARES PLANTA 2, S.L..
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Cincinato | Bodonal de la Sierra, Badajoz | 30 | 60 | First authorisation | 21 Aug 2025 |
| Paraje Las Flotas de los Álamos | Totana, Murcia | 24.5 | 40 | In public consultation | 20 Jun 2023 |
GLOBAL BAZA S.L
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Olinda | Onda, Castellón | 52.6 | · | In public consultation | 5 May 2026 |
PLANTA SOLAR OPDE, 34 S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Las Regañas | Rubí, Barcelona | 51 | 204 | Refused, withdrawn or rejected | 24 Dec 2025 |
Solaben Electricidad Seis, S.A.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Solaben ST1 | Logrosán, Cáceres | 50 | 200 | In public consultation | 9 Jul 2026 |
Fotowatio Renewable Ventures Servicios España, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS CAMARREAL | Camargo, Cantabria | 49.9 | 206 | In public consultation | 23 Jul 2026 |
Bess Development 6, S. L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS SOLÓRZANO | Solórzano, Cantabria | 49.7 | 200 | Authorised to build | 7 Aug 2026 |
PLANTA SOLAR OPDE 1, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| GAZULES I HIBRIDACIÓN | Alcalá de los Gazules, Cádiz | 45.8 | · | In public consultation | 25 Feb 2026 |
Monegros Solar, SA
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Los Limonetes | Badajoz, Badajoz | 45.7 | 91.4 | Environmental decision | 29 Jan 2026 |
Baylio Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Nertobriga | Fregenal de la Sierra, Badajoz | 30 | 60 | First authorisation | 21 Aug 2025 |
| Zurbarán | Logrosán, Cáceres | 15 | 30 | First authorisation | 18 Dec 2025 |
Planta Solar OPDE 25, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Covatillas 3 | Castillejo de Iniesta, Cuenca | 43.9 | 300 | Authorised to build | 21 Aug 2026 |
Matilde Solar, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Archo II | Antequera, Málaga | 42.6 | · | In public consultation | 6 Apr 2026 |
Irineo Energía, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Archo I | Antequera, Málaga | 42.6 | · | In public consultation | 6 Apr 2026 |
SUN HIVE 85 SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Baterías Puntiró HIVE | Palma, Illes Balears | 41 | 82 | In public consultation | 15 Apr 2024 |
ALTER ENERSUN MÉRIDA UNO, S.A.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM HIB San Serván 2020 | Mérida, Badajoz | 40 | 160 | In public consultation | 20 Oct 2026 |
Ralos Investment Fotovoltaico Sur, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Los Frailes | Badajoz, Badajoz | 40 | 160 | In public consultation | 28 Jul 2026 |
Planta FV 155 SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Telesto 3 | San Andrés del Rey, Guadalajara | 20 | 40 | Environmental decision | 25 Mar 2026 |
| Telesto 2 | San Andrés del Rey, Guadalajara | 20 | 40 | Environmental decision | 25 Mar 2026 |
PLANTA FV 127, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Aquarii | Villamejil, León | 40 | 160 | In public consultation | 22 Apr 2026 |
Urso Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Don Rodrigo II | Utrera, Sevilla | 39.6 | 140 | Authorised to build | 19 Aug 2026 |
Gestenia Energía, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS GES | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 19 Aug 2026 |
Afrodita Solar, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Afrodita | Los Molares, Sevilla | 39.6 | 140 | Authorised to build | 18 Aug 2026 |
Freya Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Freya | Carmona, Sevilla | 39.6 | 140 | Authorised to build | 31 Jul 2026 |
Senen Energía, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| SES | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 20 Jul 2026 |
Jade Sostenible, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Jade | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 20 Jul 2026 |
Heracles Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Heracles | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 20 Jul 2026 |
Esmeralda Solar, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Esmeralda | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 20 Jul 2026 |
Elvisa Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Elvisa | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 16 Jul 2026 |
Artemisa Energía, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Artemisa | Alcalá de Guadaíra, Sevilla | 39.6 | 140 | Authorised to build | 16 Jul 2026 |
Demeter Energía, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Demeter | Los Molares, Sevilla | 39.6 | · | In public consultation | 18 May 2026 |
Anubis Energía, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Anubis | Los Molares, Sevilla | 39.6 | · | In public consultation | 18 May 2026 |
Teonas Solar, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Híbrida Don Rodrigo III | Carmona, Sevilla | 39.6 | · | In public consultation | 27 Apr 2026 |
Agatha Energía, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Agatha | Alcalá de Guadaira, Sevilla | 39.6 | · | In public consultation | 23 Apr 2026 |
COMIOLICA, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación La Loma con batería de almacenamiento | Aliaga, Teruel | 36 | 71.9 | Environmental decision | 3 Nov 2025 |
Tébar Eólica, SA
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Las Lomillas | Tébar, Cuenca | 36 | 72 | Authorised to build | 23 Oct 2025 |
Villablanca Solar 1, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Rey III Solar | Carmona, Sevilla | 35.1 | · | In public consultation | 11 Sep 2026 |
Sistemas Energéticos Barandón, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Herrera de los Navarros | Herrera de los Navarros, Zaragoza | 35.1 | 70.2 | In public consultation | 18 Jun 2026 |
EL CUCO ENERGY, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| El Cuco | Montealegre del Castillo, Albacete | 33.6 | 100 | In public consultation | 19 Jun 2026 |
Emaldi Project Spain, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Ribadelago Híbrido | Palacios de Sanabria, Zamora | 32.1 | 129 | In public consultation | 23 Oct 2026 |
Planta FV112, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Pegaso | Valladolid, Valladolid | 31 | 72 | Environmental decision | 17 Sep 2026 |
Boreas Wind, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridación PE Iglesias | Iglesias, Burgos | 30.3 | 124 | Authorised to build | 29 Jun 2026 |
PARQUE EÓLICO INIESTA, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Almacenamiento Iniesta hibrido | Iniesta, Cuenca | 30 | 120 | In public consultation | 4 Jun 2026 |
Planta Solar OPDE 42 S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS OPDE Trévago 1 | Fuentestrún, Soria | 30 | 120 | In public consultation | 18 May 2026 |
Bianor Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bianor | Utrera, Sevilla | 28.4 | 100 | Authorised to build | 25 Aug 2026 |
Iberdrola Renovables Aragón, SAU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridación FV Teruel | Azaila, Teruel | 27.6 | 59.9 | Authorised to build | 20 Oct 2026 |
Desarrollos Renovables FV Olmedilla, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridación Olmedilla | Alarcón, Cuenca | 27.5 | 59.9 | Authorised to build | 29 Jan 2026 |
Desarrollos Renovables FV Romeral, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridación Romeral | Alarcón, Cuenca | 27.5 | 59.9 | Authorised to build | 27 Jan 2026 |
Planta Solar OPDE 6, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Montesol | Cañada Vellida, Teruel | 26.7 | 140 | Authorised to build | 22 Oct 2026 |
PLANTA SOLAR OPDE 8, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Larral | Zaragoza, Zaragoza | 26.7 | 126 | Environmental decision | 22 Oct 2026 |
Planta Solar OPDE 3, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Los Belos | La Muela, Zaragoza | 26.7 | 125 | Authorised to build | 20 Oct 2026 |
Planta Solar OPDE 17, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Los Arcos | Andorra, Teruel | 26.7 | 140 | Authorised to build | 19 Oct 2026 |
Planta Solar OPDE 52, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación OPDE Belinchón 2 | Barajas de Melo, Cuenca | 26.7 | 126 | Authorised to build | 20 Jun 2026 |
Planta Solar OPDE 51, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación OPDE Belinchón 1 | Barajas de Melo, Cuenca | 26.7 | 126 | Authorised to build | 20 Jun 2026 |
PLANTA SOLAR OPDE 12, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Plana de la Pena 1 | Botorrita, Zaragoza | 26.7 | 126 | In public consultation | 13 May 2026 |
PLANTA SOLAR OPDE 53, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Belinchón 3 | Barajas de Melo, Cuenca | 26.7 | 126 | In public consultation | 6 Feb 2026 |
Iberdrola Renovables Andalucía, SAU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Hibridación FV Andévalo | Puebla de Guzmán, Huelva | 26.4 | 59.9 | Authorised to build | 15 Sep 2025 |
Macrina Solar 6, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Cillamayor | Aguilar de Campoo, Palencia | 25.4 | 110 | In public consultation | 6 Oct 2026 |
Iberdrola Generación, SAU
Also written IBERDROLA GENERACIÓN, S.A.U.; Iberdrola Generación S.A.U..
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Baterías | Belvís de Monroy, Cáceres | 15 | · | Authorised to build | 7 Mar 2024 |
| Storage at Santiago Sil-Jares | Vilamartín de Valdeorras, Orense | 5 | 5 | Authorised to build | 12 Feb 2024 |
| Storage at Central Hidroeléctrica Santiago Sil-Jares | Vilamartín de Valdeorras, Ourense | 5 | · | In public consultation | 2 Jan 2023 |
| Storage at Santiago Sil-Xares | Villamartín de Valdeorras, Ourense | · | · | In public consultation | 24 Jan 2024 |
Alambor Solar S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Alambor Solar | Pinos Puente, Granada | 24.6 | · | In public consultation | 6 Oct 2026 |
Solar Bolarque, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bolarque I | Tinajas, Cuenca | 24.6 | 40 | Authorised to build | 6 Nov 2025 |
Planta Solar OPDE Extremadura 2, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| OPDE Miramundo | Puerto Real, Cádiz | 24 | 121 | Environmental decision | 30 Jul 2026 |
Planta Solar OPDE Andalucía 1, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación Zafra | Alcalá de Guadaíra, Sevilla | 24 | 126 | Authorised to build | 27 Apr 2026 |
Planta Solar OPDE La Fernandina, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| La Fernandina | Mérida, Badajoz | 24 | 125 | Environmental decision | 30 Jul 2025 |
ELAWAN EÓLICA FRONTONES, S.L.
Also written Elawan Eólica Frontones, SL.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Planta de Almacenamiento Frontones Híbrida Fase II | Corral-Rubio, Albacete | 20 | 80 | In public consultation | 31 Aug 2026 |
| Planta de Almacenamiento Frontones | Corral Rubio, Albacete | 4 | 9.2 | First authorisation | 28 May 2025 |
SONORA POWER, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PB SONORA SUBIRATS 1 | Subirats, Barcelona | 23.5 | 54 | In public consultation | 4 Sep 2025 |
Oropesa Solar, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Talayuela II BESS | Talayuela, Cáceres | 22.3 | 47.7 | Authorised to build | 1 Jul 2026 |
Solnova Electricidad, S.A.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Solnova ST1 | Sanlúcar la Mayor, Sevilla | 22 | · | In public consultation | 20 Feb 2026 |
GR Aitana Renovables, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| módulo de almacenamiento Aitana | Altarejos, Cuenca | 21.9 | 43.4 | Authorised to build | 15 Aug 2026 |
GR Turbón Renovables, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Turbón | Altarejos, Cuenca | 21.7 | 43.4 | Authorised to build | 17 Aug 2026 |
GR Bañuela Renovables, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bañuela | Altarejos, Cuenca | 21.7 | 43.4 | Authorised to build | 17 Aug 2026 |
GR Aspe Renovables, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Aspe | Altarejos, Cuenca | 21.7 | 43.4 | Authorised to build | 15 Aug 2026 |
Green Ric Energy, S.L.U
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Hibridación BESS Greencar 3 | Carmona, Sevilla | 21.6 | 85.7 | In public consultation | 23 Sep 2026 |
Mulhacén Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| módulo de almacenamiento energético Mulhacén | Esquivias, Toledo | 21.6 | 44.1 | First authorisation | 12 Oct 2026 |
Planta FV 124, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Armus | Villamediana, Palencia | 20 | 80 | Environmental decision | 2 Jun 2026 |
ELAWAN TORRIJOS 220, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Almacenamiento Elawan Torrijos I Híbrido | Novés, Toledo | 20 | 92.2 | In public consultation | 17 Mar 2026 |
Elawan Eólica Fuente Álamo, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Fuente-Álamo | Chinchilla de Montearagón, Albacete | 20 | · | Refused, withdrawn or rejected | 9 Oct 2025 |
FRV ARROYADAS 2 SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| FRV PALAU | Palau-solità i Plegamans, Barcelona | 20 | 80.2 | In public consultation | 19 May 2025 |
Planta FV 115, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Castor | Huecas, Toledo | 20 | 80 | Authorised to build | 22 Oct 2026 |
Planta FV100, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Solaria-Santiz I | Valdelosa, Salamanca | 20 | 100 | Authorised to build | 20 Oct 2026 |
Planta FV101, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Solaria-Tordesillas II | Tordesillas, Valladolid | 20 | · | In public consultation | 17 Sep 2026 |
Ictio Solar Berenice, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Ictio Alcázar III | Alcázar de San Juan, Ciudad Real | 20 | 40 | First authorisation | 14 Oct 2026 |
Ictio Solar Auriga, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Ictio Alcázar II | Alcázar de San Juan, Ciudad Real | 20 | 80 | First authorisation | 14 Oct 2026 |
Coracha Solar S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Coracha Solar | Pinos Puente, Granada | 19.7 | · | In public consultation | 6 Oct 2026 |
Cimera Solar S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| ALM Cimera Solar | Pinos Puente, Granada | 19.7 | · | In public consultation | 6 Oct 2026 |
EDP RENOVABLES ESPAÑA S.L.U
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Castillo Garcimuñoz | Pinarejo, Cuenca | 19.5 | 39 | In public consultation | 29 Sep 2026 |
FVR San Serván 8, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Serván 8 | Solana de los Barros, Badajoz | 18.8 | 86 | Environmental decision | 21 May 2026 |
FVR San Serván 7, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Serván 7 | Solana de los Barros, Badajoz | 18.8 | 86 | Environmental decision | 21 May 2026 |
FVR San Serván 6, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Serván 6 | Solana de los Barros, Badajoz | 18.8 | 86 | Environmental decision | 21 May 2026 |
Iberdrola Renovables Canarias. S.A.U.
Also written Iberdrola Renovables Canarias, S.A.U..
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Sistema de almacenamiento de energía con baterías Marzagán | Telde, Las Palmas | 8 | 40.3 | In public consultation | 21 May 2025 |
| Sistema de Almacenamiento de Energía con Baterías (SAEB) Barranco Seco 4 | Las Palmas de Gran Canaria, Las Palmas | 5 | 22.4 | In public consultation | 29 May 2025 |
| Sistema de Almacenamiento de Energía con Baterías (SAEB) Barranco Seco | Las Palmas de Gran Canaria, Las Palmas | 5 | 22.4 | In public consultation | 23 May 2025 |
Planta FV109, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Draco | Toro, Zamora | 18 | 72 | Environmental decision | 5 May 2026 |
Planta FV108, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Delphinus | Toro, Zamora | 17.9 | 72 | Environmental decision | 5 May 2026 |
FRV La Solanilla, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS La Solanilla | Trujillo, Cáceres | 17.5 | 70 | In public consultation | 4 Jun 2026 |
Novasol Invest La Isla, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| La Isla | Alcalá de Guadaira, Sevilla | 16.5 | · | In public consultation | 21 Apr 2026 |
Molinos del Ebro, SA
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Valdejalón | Rueda de Jalón, Zaragoza | 5 | 10 | First authorisation | 4 May 2026 |
| El Tollo | Rueda de Jalón, Zaragoza | 5 | 10 | First authorisation | 4 May 2026 |
| Almacenamiento Hibridación El Llano | Rueda de Jalón, Zaragoza | 5 | 30 | First authorisation | 18 Apr 2026 |
Soner Goya, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Coria Villetas | Coria, Cáceres | 13.8 | 27.5 | First authorisation | 17 Dec 2025 |
Soner Goyan SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Coria Villetas | Guijo de Coria, Cáceres | 13.8 | 27.5 | Environmental decision | 30 Jul 2025 |
RENEW GREEN GENERATOR IV, S.L.
Also written RENEW GREEN GENERATOR IV SL.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PHFV CENTELLES | Centelles, Barcelona | 5.5 | 33 | In public consultation | 20 Oct 2026 |
| PHFV PENEDES | Vilafranca del Penedès, Barcelona | 5.5 | 22 | In public consultation | 6 Feb 2026 |
Broza Solar, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Broza Solar | Horche, Guadalajara | 10.9 | 21.8 | First authorisation | 9 Oct 2025 |
Molinos del Moncayo, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Almacenamiento Hibridación Las Azubías | Fuendejalón, Zaragoza | 5 | 10 | First authorisation | 27 Apr 2026 |
| Storage at Picador | Fuendejalón, Zaragoza | 5 | 10 | Environmental decision | 23 Mar 2026 |
Enerfín Renovables IX, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Piruquito | Ampuero, Cantabria | 8.5 | 17 | Refused, withdrawn or rejected | 13 Nov 2025 |
Calatrava Solar I, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Azuer I | Manzanares, Ciudad Real | 6 | 15 | In public consultation | 6 Oct 2026 |
Energías Alternativas Eólicas Riojanas, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Raposeras | Pradejón, La Rioja | 5 | · | Refused, withdrawn or rejected | 30 May 2026 |
Iberdrola Renovables Castilla La Mancha, SA
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Puertollano II | Puertollano, Ciudad Real | 5 | 22.8 | Authorised to build | 2 Dec 2021 |
Renew Green Generator I, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PHFV Castellet | L'Arboç, Tarragona | 5 | · | In public consultation | 24 Jul 2026 |
Repsol Petróleo, SA
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bess Autoconsumo Puertollano | Puertollano, Ciudad Real | 4 | 16.3 | Environmental decision | 20 Jun 2026 |
ELAWAN FOTOVOLTAICA CAMPANARIO 1, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Campanario I Híbrido | Bonete, Albacete | 3.8 | 9.2 | Authorised to build | 7 Jun 2025 |
PSF Los Frailes, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Storage at Planta Fotovoltaica Los Frailes | Telde, Las Palmas | 0.8 | 0.8 | In public consultation | 15 Apr 2026 |
Viesgo Distribución Eléctrica, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Centro de Seccionamiento equipado con batería de almacenamiento | Cillorigo de Liébana, Cantabria | 0.6 | 0.9 | In public consultation | 19 Sep 2022 |
Prime Rubau Energy, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| PS_PB BESS Brunyola | Brunyola y Sant Martí Sapresa, Girona | 0.5 | 1 | In public consultation | 7 Oct 2026 |
Eléctricas Pitarch Distribución, S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Proyecto para abastecimiento energético mediante almacenamiento y gestión inteligente de la demanda en zonas con protección ambiental en Extremadura, en el término municipal de Santa Marta de Magasca | Santa Marta de Magasca, Cáceres | 0.2 | 0.6 | In public consultation | 10 May 2021 |
READY TO BUILD RENEWABLES SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS PIXIN | Corvera de Asturias, Asturias | · | · | In public consultation | 6 Mar 2026 |
Bess Development 5,S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Bess Valle de Güímar | Arafo, Santa Cruz de Tenerife | · | 41.3 | In public consultation | 22 May 2024 |
EFM Balears Sostenible 05, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Son Molines BESS 4 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
| Son Molines BESS 3 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
| Son Molines BESS 2 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
| Son Molines BESS 1 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
EFM Balears Sostenible 04, S.L.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Almacenamiento Bess Es Rafal Can Valero 2 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
| Almacenamiento Bess Es Rafal Can Valero 1 | Palma, Illes Balears | · | 40 | In public consultation | 25 Nov 2024 |
ONE VICTORIA SOLAR 2, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| INCA BESS 66 kV | Inca, Illes Balears | · | 123 | In public consultation | 19 Nov 2024 |
EFM Sostenible 02 SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Almacenamiento Calvià Bess 2 | Calvià, Illes Balears | · | 6 | In public consultation | 23 Jul 2024 |
| Almacenamiento Calvià Bess 1 | Calvià, Illes Balears | · | 20 | In public consultation | 23 Jul 2024 |
Cantabria 5 Renovable, SLU
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS Baleares 3 | Alcúdia, Illes Balears | · | 108 | In public consultation | 20 May 2024 |
DISA RENOVABLES S.L.U.
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| BESS ICOR II | Arico, Santa Cruz de Tenerife | · | 9.6 | Declared of public utility | 14 May 2024 |
MERAK STORAGE 2, SL
| Installation, as the gazette names it | Place | MW | MWh | Step reached | Date |
|---|---|---|---|---|---|
| Sant Martí BESS | Alcúdia, Illes Balears | · | 79 | In public consultation | 6 May 2024 |
Source: Boletín Oficial del Estado, read to 25 October 2026. Basado en datos de la Agencia Estatal Boletín Oficial del Estado. A company’s legal form (SA, SL and their unipersonal forms) is ignored when spellings are joined; nothing is joined on a near match.