Piruquito
A battery installation of 8.5 MW and 17 MWh in Ampuero, Cantabria, refused, withdrawn or rejected. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 8.5 MW |
| Storage | 17 MWh |
| Hours at full power | 2.0 |
| Promoter | Enerfín Renovables IX, SLU |
| Configuration | Added to a plant |
| Plant it is added to | Piruquito, 50.4 MW, wind |
| Municipality | Ampuero |
| Province | Cantabria |
| Substation | Solórzano |
| Step reached | Refused, withdrawn or rejected |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 10 Feb 2025 | Public consultation; 8.5 MW, 17 MWh | Delegación del Gobierno en Cantabria, Área de Industria y Energía | BOE-B-2025-4603 |
| 13 Nov 2025 | Environmental decision; 8.5 MW | Ministry for the Ecological Transition, Directorate-General for Environmental Quality and Assessment | BOE-A-2025-23029 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.