Every battery project in AST’s connection table, 53 of them

Each row is one line of the table AST publishes, read 14 November 2026: standalone batteries first, then connections that pair a battery with solar or wind. Within each, the projects furthest along come first. The megawatts are for the whole connection.

The whole table as a CSV   Back to Latvia

Standalone batteries, 26 rows

HolderMWWhere on AST’s gridStepService
Liepaja ESS, SIA100Grobiņa substationConstructionlimited
BESS 7, SIA65Džūkste substationConstructionlimited
Jaukta Jauda, SIA60line 208 "Ogre – TEC2", a new substation on the lineConstructionlimited
BESS 2, SIA300line 322 "Viskaļi - Brocēni", a new substation on the lineAgreement concludedlimited
BESS 6, SIA300line 355 "Aizkraukle – Valmiera", a new substation on the lineAgreement concludedlimited
Enery Latvia, SIA90line 117 and line 118 "Bauska – Nīzere and Iecava – Stelpe", a new substation on the lineAgreement concludedlimited
BESS 4, SIA75Platene substationAgreement concludedlimited
Ventspils BESS, SIA75Ventspils substationAgreement concludedlimited
Enery Latvia, SIA60line 190 "Viļāni – Rēzekne", a new substation on the lineAgreement concludedlimited
Enery Latvia, SIA60line 296 "Līvāni – Līksna", a new substation on the lineAgreement concludedlimited
RE elektriba, SIA60Imanta substationAgreement concludedlimited
Vertius, SIA50Dagda substationAgreement concludedlimited
EPP Daugavpils, SIA45line 133 "Daugavpils – Dagda", a new substation on the lineAgreement concludedlimited
Enery Latvia, SIA45line 292 "Špoģi – Preiļi", a new substation on the lineAgreement concludedlimited
Enery Latvia, SIA40line 294 "Krustpils – Viļāni", a new substation on the lineAgreement concludedlimited
Nordic Storage Systems, SIA400Krustpils substationTechnical requirements sentlimited
Monta Spico, SIA200line 355 "Aizkraukle – Valmiera", a new substation on the lineTechnical requirements sentlimited
Melderi wind, SIA120Lejasstrazdi substationTechnical requirements sentlimited
Pupuķi BESS, SIA45Grīva substationTechnical requirements sentlimited
Vertius E, SIA20line 273 "Valmiera-Rūjiena", a new substation on the lineTechnical requirements sentlimited
a private person, named in AST’s table20Latgale substationTechnical requirements sentlimited
Greenpower, SIA11Pope substationTechnical requirements sentlimited
VK Terminal Services, SIA9Ventamonjaks substationTechnical requirements sentlimited
Gaujas koks, SIA4.99Gaujas koks substationTechnical requirements sentlimited
Utilitas Wind, SIA100line 305 "Viskaļi - Mūša", a new substation on the lineTechnical requirements being preparedlimited
CER Enerģija, SIA50Vairogs substationTechnical requirements being preparedlimited

Batteries beside solar and wind, 27 rows

HolderKindMWWhere on AST’s gridStepServiceThe battery, where its owner names it
IGN RES DEV2, SIASolar with storage222line 524 "Tume - Imanta", a new substation on the lineAcceptance into operationconstantTume battery, 107.2 MW, 214.5 MWh, under constructionIgnitis Renewables, by its own release; matched to this row on place and kind
DSE Aizpute Solar, SIASolar with storage200line 425 "Grobiņa - Ventspils", a new substation on the lineAcceptance into operationconstant·
SPV Kurzeme, SIASolar with storage110line 198 "Zilupe - Dagda", a new substation on the lineAcceptance into operationconstant·
Baltic Biorefinery Group, SIASolar with storage100Krustpils substationAcceptance into operationconstant·
MAX SOLAR, SIASolar with storage60Barkava substationAcceptance into operationconstant·
Rapsoil, SIAWind with storage60line 162A "Grobiņa – Lauma – Zaļā Birze", a new substation on the lineAcceptance into operationconstant·
Baltazar, SIASolar with storage46Brocēni substationAcceptance into operationconstant·
Sunly Land Solar 1, SIASolar and wind with storage40line 175 "Valmiera - Aloja", a new substation on the lineAcceptance into operationconstant·
TCK, SIAWind with storage0Tārgale substationAcceptance into operationconstant·
PurpleGreen Energy B, SIASolar with storage400line 309 "Veļikoreckaja - Rēzekne", a new substation on the lineConstructionconstant·
DSE Lazas Solar, SIASolar and wind with storage275line 425 "Grobiņa - Ventspils", a new substation on the lineConstructionconstant·
Sunly Land Solar 2, SIASolar with storage200line 323 "Brocēni – Grobiņa", a new substation on the lineConstructionconstant·
SIA “Lode Wind”Wind with storage130line 502 "TEC-2 - Kilingi Nomme", a new substation on the lineConstructionflexible·
SNG Solar Latvia, SIASolar with storage100Bolderāja II substationConstructionflexible·
ib vogt BrocēnI, SIASolar with storage70Brocēni substationConstructionconstant·
Birznieki Industrial Solutions, SIASolar with storage60line 241 "Bišuciems - Olaine", a new substation on the lineConstructionconstant·
Verdia Wind, SIAWind with storage35Pope substationConstructionconstant·
PurpleGreen Solwin, SIASolar with storage400line 311 "Krustpils - Līksna", a new substation on the lineDesignconstant·
Virga Tero, SIASolar with storage46Grobiņa substationAgreement concludedflexible·
ib vogt Latvia, SIASolar with storage45Ventspils substationAgreement concludedflexible·
Alsun Energy, SIASolar with storage25Balande substationAgreement concludedflexible·
Vindr Degole, SIASolar with storage25line 254 "Tukums – Džūkste", a new substation on the lineAgreement concludedflexible·
PurpleGreen SolWin 1, SIASolar with storage200line 127 "Jēkabpils - Viesīte", a new substation on the lineTechnical requirements sentconstant·
Nītaure PV, SIASolar with storage100line 355 "Aizkraukle – Valmiera", a new substation on the lineTechnical requirements sentflexible·
ib vogt Latvia alfa, SIASolar with storage92Krustpils substationTechnical requirements sentconstant·
Užava energo, SIAWind with storage80line 268 "Ventspils – Alsunga", a new substation on the lineTechnical requirements sentflexible·
ib vogt Dobele, SIASolar with storage50line 143 "Dobele – Jaunpils", a new substation on the lineTechnical requirements sentconstant·

Not shown here and in the CSV: the 81 rows with no battery, among them wind and solar farms, data centres, hydrogen plants and the distribution operator’s substations. Source: AST’s connection table. The English words for AST’s steps, kinds and services are ours; AST’s Latvian is in the CSV.