Every battery project in AST’s connection table, 53 of them
Each row is one line of the table AST publishes, read 14 November 2026: standalone batteries first, then connections that pair a battery with solar or wind. Within each, the projects furthest along come first. The megawatts are for the whole connection.
Standalone batteries, 26 rows
| Holder | MW | Where on AST’s grid | Step | Service |
|---|---|---|---|---|
| Liepaja ESS, SIA | 100 | Grobiņa substation | Construction | limited |
| BESS 7, SIA | 65 | Džūkste substation | Construction | limited |
| Jaukta Jauda, SIA | 60 | line 208 "Ogre – TEC2", a new substation on the line | Construction | limited |
| BESS 2, SIA | 300 | line 322 "Viskaļi - Brocēni", a new substation on the line | Agreement concluded | limited |
| BESS 6, SIA | 300 | line 355 "Aizkraukle – Valmiera", a new substation on the line | Agreement concluded | limited |
| Enery Latvia, SIA | 90 | line 117 and line 118 "Bauska – Nīzere and Iecava – Stelpe", a new substation on the line | Agreement concluded | limited |
| BESS 4, SIA | 75 | Platene substation | Agreement concluded | limited |
| Ventspils BESS, SIA | 75 | Ventspils substation | Agreement concluded | limited |
| Enery Latvia, SIA | 60 | line 190 "Viļāni – Rēzekne", a new substation on the line | Agreement concluded | limited |
| Enery Latvia, SIA | 60 | line 296 "Līvāni – Līksna", a new substation on the line | Agreement concluded | limited |
| RE elektriba, SIA | 60 | Imanta substation | Agreement concluded | limited |
| Vertius, SIA | 50 | Dagda substation | Agreement concluded | limited |
| EPP Daugavpils, SIA | 45 | line 133 "Daugavpils – Dagda", a new substation on the line | Agreement concluded | limited |
| Enery Latvia, SIA | 45 | line 292 "Špoģi – Preiļi", a new substation on the line | Agreement concluded | limited |
| Enery Latvia, SIA | 40 | line 294 "Krustpils – Viļāni", a new substation on the line | Agreement concluded | limited |
| Nordic Storage Systems, SIA | 400 | Krustpils substation | Technical requirements sent | limited |
| Monta Spico, SIA | 200 | line 355 "Aizkraukle – Valmiera", a new substation on the line | Technical requirements sent | limited |
| Melderi wind, SIA | 120 | Lejasstrazdi substation | Technical requirements sent | limited |
| Pupuķi BESS, SIA | 45 | Grīva substation | Technical requirements sent | limited |
| Vertius E, SIA | 20 | line 273 "Valmiera-Rūjiena", a new substation on the line | Technical requirements sent | limited |
| a private person, named in AST’s table | 20 | Latgale substation | Technical requirements sent | limited |
| Greenpower, SIA | 11 | Pope substation | Technical requirements sent | limited |
| VK Terminal Services, SIA | 9 | Ventamonjaks substation | Technical requirements sent | limited |
| Gaujas koks, SIA | 4.99 | Gaujas koks substation | Technical requirements sent | limited |
| Utilitas Wind, SIA | 100 | line 305 "Viskaļi - Mūša", a new substation on the line | Technical requirements being prepared | limited |
| CER Enerģija, SIA | 50 | Vairogs substation | Technical requirements being prepared | limited |
Batteries beside solar and wind, 27 rows
| Holder | Kind | MW | Where on AST’s grid | Step | Service | The battery, where its owner names it |
|---|---|---|---|---|---|---|
| IGN RES DEV2, SIA | Solar with storage | 222 | line 524 "Tume - Imanta", a new substation on the line | Acceptance into operation | constant | Tume battery, 107.2 MW, 214.5 MWh, under constructionIgnitis Renewables, by its own release; matched to this row on place and kind |
| DSE Aizpute Solar, SIA | Solar with storage | 200 | line 425 "Grobiņa - Ventspils", a new substation on the line | Acceptance into operation | constant | · |
| SPV Kurzeme, SIA | Solar with storage | 110 | line 198 "Zilupe - Dagda", a new substation on the line | Acceptance into operation | constant | · |
| Baltic Biorefinery Group, SIA | Solar with storage | 100 | Krustpils substation | Acceptance into operation | constant | · |
| MAX SOLAR, SIA | Solar with storage | 60 | Barkava substation | Acceptance into operation | constant | · |
| Rapsoil, SIA | Wind with storage | 60 | line 162A "Grobiņa – Lauma – Zaļā Birze", a new substation on the line | Acceptance into operation | constant | · |
| Baltazar, SIA | Solar with storage | 46 | Brocēni substation | Acceptance into operation | constant | · |
| Sunly Land Solar 1, SIA | Solar and wind with storage | 40 | line 175 "Valmiera - Aloja", a new substation on the line | Acceptance into operation | constant | · |
| TCK, SIA | Wind with storage | 0 | Tārgale substation | Acceptance into operation | constant | · |
| PurpleGreen Energy B, SIA | Solar with storage | 400 | line 309 "Veļikoreckaja - Rēzekne", a new substation on the line | Construction | constant | · |
| DSE Lazas Solar, SIA | Solar and wind with storage | 275 | line 425 "Grobiņa - Ventspils", a new substation on the line | Construction | constant | · |
| Sunly Land Solar 2, SIA | Solar with storage | 200 | line 323 "Brocēni – Grobiņa", a new substation on the line | Construction | constant | · |
| SIA “Lode Wind” | Wind with storage | 130 | line 502 "TEC-2 - Kilingi Nomme", a new substation on the line | Construction | flexible | · |
| SNG Solar Latvia, SIA | Solar with storage | 100 | Bolderāja II substation | Construction | flexible | · |
| ib vogt BrocēnI, SIA | Solar with storage | 70 | Brocēni substation | Construction | constant | · |
| Birznieki Industrial Solutions, SIA | Solar with storage | 60 | line 241 "Bišuciems - Olaine", a new substation on the line | Construction | constant | · |
| Verdia Wind, SIA | Wind with storage | 35 | Pope substation | Construction | constant | · |
| PurpleGreen Solwin, SIA | Solar with storage | 400 | line 311 "Krustpils - Līksna", a new substation on the line | Design | constant | · |
| Virga Tero, SIA | Solar with storage | 46 | Grobiņa substation | Agreement concluded | flexible | · |
| ib vogt Latvia, SIA | Solar with storage | 45 | Ventspils substation | Agreement concluded | flexible | · |
| Alsun Energy, SIA | Solar with storage | 25 | Balande substation | Agreement concluded | flexible | · |
| Vindr Degole, SIA | Solar with storage | 25 | line 254 "Tukums – Džūkste", a new substation on the line | Agreement concluded | flexible | · |
| PurpleGreen SolWin 1, SIA | Solar with storage | 200 | line 127 "Jēkabpils - Viesīte", a new substation on the line | Technical requirements sent | constant | · |
| Nītaure PV, SIA | Solar with storage | 100 | line 355 "Aizkraukle – Valmiera", a new substation on the line | Technical requirements sent | flexible | · |
| ib vogt Latvia alfa, SIA | Solar with storage | 92 | Krustpils substation | Technical requirements sent | constant | · |
| Užava energo, SIA | Wind with storage | 80 | line 268 "Ventspils – Alsunga", a new substation on the line | Technical requirements sent | flexible | · |
| ib vogt Dobele, SIA | Solar with storage | 50 | line 143 "Dobele – Jaunpils", a new substation on the line | Technical requirements sent | constant | · |
Not shown here and in the CSV: the 81 rows with no battery, among them wind and solar farms, data centres, hydrogen plants and the distribution operator’s substations. Source: AST’s connection table. The English words for AST’s steps, kinds and services are ours; AST’s Latvian is in the CSV.