Vitreous LabsEnergy transparency

Storage at Santiago Sil-Jares

A battery installation of 5 MW and 5 MWh in Vilamartín de Valdeorras, Orense, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage5 MWh
Hours at full power1.0
PromoterIberdrola Generación, SAU
ConfigurationAdded to a plant
Plant it is added toSantiago Sil-Jares, hydro
Access capacity68.1 MW
MunicipalityVilamartín de Valdeorras
ProvinceOrense
SubstationSantiago 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
12 Feb 2024First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 5 MW, 5 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2024-2634