BESS Picón I

A battery installation of 19.8 MW and 46.7 MWh in Porzuna, Ciudad Real, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power19.8 MW
Storage46.7 MWh
Hours at full power2.4
PromoterNaturgy Renovables, SLU
ConfigurationAdded to a plant
Plant it is added toPicón I, 46.1 MW, solar
Access capacity46 MW
MunicipalityPorzuna
ProvinceCiudad Real
SubstationPicón 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
16 Mar 2023Public consultation; 19.8 MW, 46.7 MWhDelegación del Gobierno en Castilla-La ManchaBOE-B-2023-7669
19 Feb 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 19.8 MW, 46.7 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-3884

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.