Storage at planta fotovoltaica Sirius Solar de 48
A battery installation in Zamora, Zamora, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | not stated in any act |
| Promoter | Planta FV120, S.L.U |
| Configuration | Added to a plant |
| Plant it is added to | planta fotovoltaica Sirius Solar de 48 |
| Municipality | Zamora |
| Province | Zamora |
| Substation | Zamora 220 kV |
| Step reached | In public consultation |
Planta FV120, S.L.U probably belongs to Solaria, traced through Spain’s companies gazette, the GLEIF register and the regulator’s reports; the State gazette itself names only the promoter.
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 26 Oct 2026 | Public consultation | · | BOE-B-2026-34914* |
The acts marked with an asterisk have so far been read only by our parser, which can mistake a plant’s power for the battery’s; the full reading, with every figure checked against the act’s words, follows within a week. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.