Vitreous LabsEnergy transparency

Talayuela II BESS

A battery installation of 22.3 MW and 47.7 MWh in Talayuela, Cáceres, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power22.3 MW
Storage47.7 MWh
Hours at full power2.1
PromoterOropesa Solar, SL
ConfigurationAdded to a plant
Plant it is added toPSFV Talayuela II, 44.5 MW, solar
Access capacity44 MW
MunicipalityTalayuela
ProvinceCáceres
SubstationArañuelo 400 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
13 May 2025Environmental decision; 23.9 MWMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2025-9374
30 Sep 2025Public consultation; 23.9 MW, 47.7 MWhDelegación del Gobierno en ExtremaduraBOE-B-2025-35187
1 Jul 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 22.3 MW, 47.7 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-14322

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Oropesa Solar, SL