ALM Ardila Batería
A battery installation of 30 MW and 60 MWh in Fregenal de la Sierra, Badajoz, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 30 MW net, 38.5 MW installed; the net figure from BOE-B-2023-4647: “cción para la instalación "Infraestructura de almacenamiento de energía eléctrica ARDILA" de 38,5 MWp y 30 MWn” |
| Storage | 60 MWh |
| Hours at full power | 1.6 |
| Promoter | Furatena Solar 1, SLU |
| Configuration | Added to a plant |
| Plant it is added to | FV Ardila, 44 MW, solar |
| Access capacity | 41.8 MW |
| Municipality | Fregenal de la Sierra |
| Province | Badajoz |
| Substation | Brovales 400 kV |
| Step reached | Authorised to build |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 14 Feb 2023 | Public consultation; 30 MW, 60 MWh | Delegación del Gobierno en Extremadura, Área de Industria y Energía | BOE-B-2023-4647 |
| 6 Jan 2025 | First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 38.5 MW, 60 MWh | Ministry for the Ecological Transition, Directorate-General for Energy Policy and Mines | BOE-A-2025-281 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.