A battery installation of 77.6 MW and 340 MWh in Álora, Málaga, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power77.6 MW
Storage340 MWh
Hours at full power4.4
PromoterRolwind Málaga 1, SL
ConfigurationStand-alone
Access capacity77.6 MW
MunicipalityÁlora
ProvinceMálaga
SubstationTajo Encantada 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
20 Dec 2024Environmental decision; 77.6 MW, 340 MWhMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2024-26669
4 Dec 2025Public consultation; 77.6 MW, 340 MWhSubdelegación del Gobierno en MálagaBOE-B-2025-45035
21 Feb 2026Environmental decision; 77.6 MWMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2026-4059
5 Jun 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 77.6 MW, 340 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-12163

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.