Vitreous LabsEnergy transparency

Moeche Storage

A battery installation of 10.5 MW and 22.2 MWh in Moeche, A Coruña, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power10.5 MW
Storage22.2 MWh
Hours at full power2.1
PromoterEnel Green Power España, S.L.
ConfigurationAdded to a plant
Plant it is added toPEol-415 Moeche, 50.4 MW, wind
Access capacity9.4 MW
MunicipalityMoeche
ProvinceA Coruña
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
28 Apr 2026Public consultation; 10.5 MW, 22.2 MWhDelegación del Gobierno en GaliciaBOE-B-2026-13399

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Enel Green Power España, S.L.