Vitreous LabsEnergy transparency

ALM Alambor Solar

A battery installation of 24.6 MW in Pinos Puente, Granada, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power24.6 MW
PromoterAlambor Solar S.L.U.
ConfigurationAdded to a plant
Plant it is added toAlambor Solar, solar
MunicipalityPinos Puente
ProvinceGranada
SubstationCaparacena 400 kV
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
6 Oct 2026Public consultation; 24.6 MWSubdelegación del Gobierno en GranadaBOE-B-2026-32445

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Alambor Solar S.L.U.