Vitreous LabsEnergy transparency

Visenta

A battery installation of 100 MW and 407 MWh in Sesué, Huesca, refused, withdrawn or rejected. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power100 MW
Storage407 MWh
Hours at full power4.1
PromoterFull Solar Energy, SL
ConfigurationStand-alone
Access capacity100 MW
MunicipalitySesué
ProvinceHuesca
SubstationSesué 220 kV
Step reachedRefused, withdrawn or rejected

Every act, oldest first

PublishedWhat the act doesAuthorityAct
7 Aug 2025Public consultation; 102 MW, 407 MWhSubdelegación del Gobierno en HuescaBOE-B-2025-28803
10 Jul 2026Withdrawal, the promoter’s or the State’s; 100 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-15111

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Full Solar Energy, SL