Vitreous LabsEnergy transparency

Sistema de Almacenamiento de Energía con Baterías (SAEB) Barranco Seco 4

A battery installation of 5 MW and 22.4 MWh in Las Palmas de Gran Canaria, Las Palmas, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage22.4 MWh
Hours at full power4.5
PromoterIberdrola Renovables Canarias. S.A.U.
ConfigurationStand-alone
Access capacity5 MW
MunicipalityLas Palmas de Gran Canaria
ProvinceLas Palmas
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
29 May 2025Public consultation; 5 MW, 22.4 MWhGobierno de Canarias, Dirección General de EnergíaBOE-B-2025-19696

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Iberdrola Renovables Canarias. S.A.U.