BESS Hibridación PE Iglesias

A battery installation of 30.3 MW and 124 MWh in Iglesias, Burgos, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power30.3 MW
Storage124 MWh
Hours at full power4.1
PromoterBoreas Wind, SL
ConfigurationAdded to a plant
Plant it is added toParque Eólico Iglesias, 70.4 MW, wind
Access capacity94 MW
MunicipalityIglesias
ProvinceBurgos
SubstationVillalbilla 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
6 Sep 2025Environmental decision; 30 MW, 124 MWhMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2025-17760
7 Nov 2025Public consultation; 30 MWSubdelegación del Gobierno en BurgosBOE-B-2025-40797
29 Jun 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 30.3 MW, 124 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-14104

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.