Vitreous LabsEnergy transparency

Almacenamiento Hibridación Las Azubías

A battery installation of 5 MW and 10 MWh in Fuendejalón, Zaragoza, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage10 MWh
Hours at full power2.0
PromoterMolinos del Moncayo, SL
ConfigurationAdded to a plant
Plant it is added toLas Azubías, 46 MW, solar and wind
Access capacity46 MW
MunicipalityFuendejalón
ProvinceZaragoza
SubstationMagallón 220 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
27 Mar 2024Public consultation; 5 MW, 10 MWhSubdelegación del Gobierno en Zaragoza, Área de Industria y EnergíaBOE-B-2024-11137
19 Feb 2026Environmental decision; 5 MW, 10 MWhMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2026-3881
27 Apr 2026First authorisation (autorización administrativa previa); 5 MW, 10 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-9173
21 May 2026Other act; 5 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-10974

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.