Vitreous LabsEnergy transparency

Apicio

A battery installation of 30 MW and 60 MWh in Fregenal de la Sierra, Badajoz, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power30 MW net, 38.5 MW installed; the net figure from BOE-B-2023-1501: “cción para la instalación "Infraestructura de almacenamiento de energía eléctrica APICIO" de 38,5 MWp y 30 MWn”
Storage60 MWh
Hours at full power1.6
PromoterEnel Green Power España Solar 1, SLU
Also namedEnel Green Power España, S.L
ConfigurationAdded to a plant
Plant it is added toFV Apicio, 42.2 MW, solar
Access capacity40.1 MW
MunicipalityFregenal de la Sierra
ProvinceBadajoz
SubstationBrovales 400 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Jan 2023Public consultation; 30 MW, 60 MWhDelegación del Gobierno en Extremadura, Área de Industria y EnergíaBOE-B-2023-1501
18 Dec 2025First authorisation (autorización administrativa previa); 38.5 MW, 60 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-25997

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.