Vitreous LabsEnergy transparency

BESS La Nava

A battery installation of 20.8 MW and 46.7 MWh in Almodóvar del Campo, Ciudad Real, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power20.8 MW
Storage46.7 MWh
Hours at full power2.2
PromoterNaturgy Renovables, SLU
ConfigurationAdded to a plant
Plant it is added toLa Nava, 46.2 MW, solar
Access capacity49.9 MW
MunicipalityAlmodóvar del Campo
ProvinceCiudad Real
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
29 Mar 2023Public consultation; 19.8 MW, 46.7 MWhDelegación del Gobierno en Castilla-La Mancha, Área de Industria y EnergíaBOE-B-2023-9202
27 Mar 2025First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 20.8 MW, 46.7 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-6169

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Naturgy Renovables, SLU