Vitreous LabsEnergy transparency

Hibridación Los Belos

A battery installation of 26.7 MW and 125 MWh in La Muela, Zaragoza, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power26.7 MW
Storage125 MWh
Hours at full power4.7
PromoterPlanta Solar OPDE 3, SL
ConfigurationAdded to a plant
Plant it is added toLos Belos, 41.6 MW, solar
Access capacity40 MW
MunicipalityLa Muela, Muel
ProvinceZaragoza
SubstationLos Vientos 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
4 Dec 2025Environmental decision; 26.7 MW, 126 MWhMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2025-24691
3 Mar 2026Public consultation; 26.7 MW, 126 MWhSubdelegación del Gobierno en ZaragozaBOE-B-2026-6523
20 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 26.7 MW, 125 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21856

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Planta Solar OPDE 3, SL