Vitreous LabsEnergy transparency

Hibridación Los Arcos

A battery installation of 26.7 MW and 140 MWh in Andorra, Teruel, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power26.7 MW
Storage140 MWh
Hours at full power5.2
PromoterPlanta Solar OPDE 17, SL
ConfigurationAdded to a plant
Plant it is added toLos Arcos, 43.9 MW, solar
Access capacity40 MW
MunicipalityAndorra
ProvinceTeruel
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
8 May 2026Public consultation; 26.7 MW, 140 MWhSubdelegación del Gobierno en TeruelBOE-B-2026-14564
19 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 26.7 MW, 140 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21766

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.