Solaria-Santiz I

A battery installation of 20 MW and 100 MWh in Valdelosa, Salamanca, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power20 MW
Storage100 MWh
Hours at full power5.0
PromoterPlanta FV100, SL
ConfigurationAdded to a plant
Plant it is added toFV Solaria-Santiz I, 50 MW, solar
Access capacity42.1 MW
MunicipalityValdelosa
ProvinceSalamanca
SubstationSantiz 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
14 Apr 2026Public consultation; 20 MW, 80 MWhSubdelegación del Gobierno en SalamancaBOE-B-2026-11545
20 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 20 MW, 100 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21855

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.