BESS Azor Solar 1

A battery installation of 23.9 MW and 96.7 MWh in Paracuellos de Jarama, Madrid, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power23.9 MW
Storage96.7 MWh
Hours at full power4.0
PromoterAzor Solar, SLU
ConfigurationAdded to a plant
Plant it is added toAzor Solar, 64 MW, solar
Access capacity125 MW
MunicipalityParacuellos de Jarama
ProvinceMadrid
SubstationArroyo de la Vega 220 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
5 Feb 2026Environmental decision; 24 MWMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2026-2711
13 Jul 2026Public consultation; 23.9 MW, 96.7 MWhDelegación del Gobierno en MadridBOE-B-2026-23995
12 Oct 2026First authorisation (autorización administrativa previa); 23.9 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21227

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.