Vitreous LabsEnergy transparency

Hibridación OPDE Belinchón 1

A battery installation of 26.7 MW and 126 MWh in Barajas de Melo, Cuenca, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power26.7 MW
Storage126 MWh
Hours at full power4.7
PromoterPlanta Solar OPDE 51, SL
ConfigurationAdded to a plant
Plant it is added toOPDE Belinchón 1, 48.1 MW, solar
Access capacity26.7 MW
MunicipalityBarajas de Melo
ProvinceCuenca
SubstationBelinchón 400 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
5 Feb 2026Public consultation; 26.7 MW, 126 MWhSubdelegación del Gobierno en CuencaBOE-B-2026-3172
20 Jun 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 26.7 MW, 126 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-13451

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Planta Solar OPDE 51, SL