Raposeras

A battery installation of 5 MW in Pradejón, La Rioja, refused, withdrawn or rejected. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power5 MW
PromoterEnergías Alternativas Eólicas Riojanas, SL
ConfigurationAdded to a plant
Plant it is added toRaposeras, 40.5 MW, solar and wind
MunicipalityPradejón, Calahorra
ProvinceLa Rioja
SubstationQuel 220 kV
Step reachedRefused, withdrawn or rejected

Every act, oldest first

PublishedWhat the act doesAuthorityAct
30 May 2026Withdrawal, the promoter’s or the State’s; 5 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-11675

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.