Planta de Almacenamiento de Energía con Baterías Carpio de Tajo

A battery installation of 20.8 MW and 46.7 MWh in El Carpio de Tajo, Toledo, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power20.8 MW
Storage46.7 MWh
Hours at full power2.2
PromoterNaturgy Renovables, SLU
ConfigurationAdded to a plant
Plant it is added toCarpio de Tajo, 46.2 MW, solar
Access capacity50 MW
MunicipalityEl Carpio de Tajo
ProvinceToledo
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
14 Mar 2023Public consultation; 20.2 MW, 46.7 MWhDelegación del Gobierno en Castilla-La ManchaBOE-B-2023-7507
21 Mar 2025First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 20.8 MW, 46.7 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-5702