Vitreous LabsEnergy transparency

BESS PIXIN

A battery installation in Corvera de Asturias, Asturias, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery powernot stated in any act
PromoterREADY TO BUILD RENEWABLES SLU
ConfigurationStand-alone
MunicipalityCorvera de Asturias
ProvinceAsturias
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
6 Mar 2026Public consultationPrincipado de Asturias, Consejería de Ciencia, Industria y EmpleoBOE-B-2026-6848

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  READY TO BUILD RENEWABLES SLU